521 Van Duzer Street
Staten Island, NY 10304BBL 5-00544-0096Map
Owner of record: Chen&C&F LLC
521 Van Duzer Street is a walk-up apartment building built in 1931 in Staten Island, 10304. It has 4 residential units across 3 floors. The owner of record is Chen&C&F LLC. HPD has recorded 68 housing violations here, most recently on June 25, 2026. 15 of the 50 most recent violations are still open.
- HPD violations
- 68
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 142
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 68
- ANon-hazardous
Paint or post a sign indicating floors missing and or near fire stairs at public hall, 3rd story
Jun 25, 2026
Open — Nov certified on time - ANon-hazardous
Paint or post a sign indicating floors missing and or near fire stairs at public hall, 2nd story
Jun 25, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Jun 25, 2026
Open — Nov certified on time - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 25, 2026
Open — Nov certified on time - ANon-hazardous
Paint or post a sign indicating floors missing and or near fire stairs at public hall, 1st story
Jun 25, 2026
Open — Nov certified on time - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 25, 2026
Open — Nov certified on time - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jun 25, 2026
Open — Nov certified on time - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Apr 29, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at all walls and ceiling at public hall, 3rd story
Apr 29, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 3rd story
Apr 29, 2026
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 3rd story
Apr 29, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Apr 29, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Apr 29, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercom system from building entrance to the return buzzer at east wall in the kitchenette located at apt 3f, 3rd story, 1st apartment from west at north
Mar 18, 2026 · Apt 3F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective entrance door at east wall in the 1st room from north at west located at apt 3f, 3rd story, 1st apartment from west at north
Mar 18, 2026 · Apt 3F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective entrance door at east wall in the 2nd room from north at west located at apt 3f, 3rd story, 1st apartment from west at north
Mar 18, 2026 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from west at north
Mar 18, 2026 · Apt 3F
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling at public hall, 3rd story
Mar 18, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from west at north
Mar 18, 2026 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 3, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2018
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective metal ceiling in the kitchen located at apt 1r, 1st story, apartment at south
Sep 27, 2018 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles east wall at shower stall in the bathroom located at apt 1r, 1st story, apartment at south
Sep 27, 2018 · Apt 1R
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1r, 1st story, apartment at south
Sep 27, 2018 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective balance lower sash window at west wall in the 3rd room from east located at apt 1r, 1st story, apartment at south
Sep 27, 2018 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1r, 1st story, apartment at south
Sep 27, 2018 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt 1r, 1st story, apartment at south
Sep 27, 2018 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1r, 1st story, apartment at south
Sep 27, 2018 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective metal ceiling in the bathroom located at apt 1r, 1st story, apartment at south
Sep 27, 2018 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 1r, 1st story, apartment at south
Sep 27, 2018 · Apt 1R
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin ants in the entire apartment located at apt 1r, 1st story, apartment at south
Sep 27, 2018 · Apt 1R
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 1r, 1st story, apartment at south
Sep 27, 2018 · Apt 1R
Open — Invalid certification - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 6, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2015
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood step 9th from bottom at public hall stairs, 3rd story
Jan 23, 2013
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective mail box at lobby, 1st story
Jan 23, 2013
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the kitchen located at apt 3, 3rd story
Jan 23, 2013 · Apt 3
Open — Nov sent out - BHazardous
Properly secure the loose hand rail at public hall stairs, 3rd story
Jan 23, 2013
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood under window at south wall at public hall, 3rd story
Jan 23, 2013
Open — Nov sent out - ANon-hazardous
Refit metal door in the entrance located at apt 3, 3rd story
Jan 23, 2013 · Apt 3
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor at shower in the bathroom located at apt 3, 3rd story
Jan 23, 2013 · Apt 3
Open — Nov sent out - BHazardous
Section 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition drop ceiling in the bathroom located at apt 3, 3rd story
Jan 23, 2013 · Apt 3
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Apr 2, 2012 · Apt 2
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of evidence of concealed water leak over ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Apr 2, 2012 · Apt 2
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Class - 2
Observed sidewalk shed installed not as per code. decking of sidewalk shed is not extended additional 5 feet beyond work area at exp#1. decking of sidewalk shed shall extend the full length of work area plus ad
Aug 20, 2024 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard; atoi observed ongoing construction under job #s01077814. supported scaffold constructed on site does not comply with chapter 33 of nyc bc. work area on scaffold is not fully planked, missi
Jul 30, 2024 · Penalty $10,000
Resolve
Complaints
- Electric
Wiring
Mar 12, 2026 · Apt 3F
Close - Electric
Lighting
Mar 12, 2026 · Apt 3F
Close - Unsanitary condition
Garbage/recycling storage
Mar 12, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 12, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Mar 12, 2026 · Apt 3F
Close - General
Bell/buzzer/intercom
Mar 12, 2026 · Apt 3F
Close - Door/window
Door
Mar 12, 2026 · Apt 3F
Close - Water leak
Heavy flow
Mar 12, 2026 · Apt 3F
Close - Paint/plaster
Wall
Mar 12, 2026 · Apt 3F
Close - Unsanitary condition
Garbage/recycling storage
Mar 12, 2026 · Apt BLDG
Close
Show 40 more ↓
- Water leak
Slow leak
Sep 22, 2018 · Apt 1R
Close - Door/window
Window frame
Sep 20, 2018 · Apt 1R
Close - Unsanitary condition
Pests
Sep 20, 2018 · Apt 1R
Close - Unsanitary condition
Mold
Sep 20, 2018 · Apt 1R
Close - Paint/plaster
Wall
Sep 20, 2018 · Apt 1R
Close - Paint/plaster
Ceiling
Sep 20, 2018 · Apt 1R
Close - Unsanitary condition
Mold
Aug 6, 2018 · Apt 1R
Close - Paint/plaster
Ceiling
Aug 6, 2018 · Apt 1R
Close - Paint/plaster
Ceiling
Aug 6, 2018 · Apt 1R
Close - Heat/hot water
Apartment only
Nov 7, 2014 · Apt 1F
Close - Heating
Heat related
Feb 24, 2014 · Apt 2
Close - Heating
Heat related
Jan 2, 2014 · Apt 3
Close - Heating
Heat related
Nov 28, 2013 · Apt 3
Close - Heating
Heat related
Jan 14, 2013 · Apt 3
Close - General
Mailbox
Jan 14, 2013 · Apt 3
Close - General
Floor
Jan 14, 2013 · Apt 3
Close - General
Stairs
Jan 14, 2013 · Apt 3
Close - Paint/plaster
Door/frame
Oct 3, 2012 · Apt 1FL
Close - Paint/plaster
Wall
Oct 3, 2012 · Apt 1FL
Close - Paint/plaster
Ceiling
Oct 3, 2012 · Apt 1FL
Close - Paint/plaster
Wall
Oct 3, 2012 · Apt 1FL
Close - Paint/plaster
Wall
Oct 3, 2012 · Apt 1FL
Close - Paint/plaster
Ceiling
Oct 3, 2012 · Apt 1FL
Close - Paint/plaster
Wall
Oct 3, 2012 · Apt 1FL
Close - Paint/plaster
Ceiling
Oct 3, 2012 · Apt 1FL
Close - Paint/plaster
Ceiling
Oct 3, 2012 · Apt 1FL
Close - Paint/plaster
Ceiling
Oct 3, 2012 · Apt 1FL
Close - Paint/plaster
Window/frame
Oct 3, 2012 · Apt 1FL
Close - Heating
Heat related
Mar 30, 2012 · Apt 2
Close - General
Windows
Nov 25, 2011 · Apt 4
Close - General
Windows
Nov 25, 2011 · Apt 4
Close - Paint/plaster
Ceiling
Sep 14, 2011 · Apt 4
Close - General
Stairs
Sep 14, 2011 · Apt 4
Close - General
Windows
Sep 14, 2011 · Apt 4
Close - General
Stairs
Sep 14, 2011 · Apt 4
Close - Paint/plaster
Ceiling
Sep 14, 2011 · Apt 4
Close - Plumbing
Basin/sink
Sep 14, 2011 · Apt 4
Close - General
Mold
Sep 6, 2011 · Apt 2
Close - Nonconst
Vermin
Sep 6, 2011 · Apt 2
Close - Nonconst
Vermin
Sep 6, 2011 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1931
- Floors
- 3
- Residential units
- 4
- Building area
- 1,350 ft²
- Lot area
- 1,100 ft²
- Zoning
- R3-2
- Community board
- 501
- Council district
- 49
- Block / lot
- 544 / 96
- Assessed value
- $136,350
- Landmark / historic district
- No
HPD registration #500312, last renewed Jul 22, 2025.
Questions about 521 Van Duzer Street
Who owns 521 Van Duzer Street?
The owner of record in NYC Department of City Planning PLUTO data is Chen&C&F LLC.
Does 521 Van Duzer Street have violations?
Yes. NYC HPD has recorded 68 housing violations at this property.
Is 521 Van Duzer Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 521 Van Duzer Street built?
City records list 1931 as the year it was built.
How many apartments are in 521 Van Duzer Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.