roofy

521 Van Duzer Street

Staten Island, NY 10304BBL 5-00544-0096Map

Owner of record: Chen&C&F LLC

521 Van Duzer Street is a walk-up apartment building built in 1931 in Staten Island, 10304. It has 4 residential units across 3 floors. The owner of record is Chen&C&F LLC. HPD has recorded 68 housing violations here, most recently on June 25, 2026. 15 of the 50 most recent violations are still open.

HPD violations
68
DOB violations
0
ECB violations
2
HPD complaints
142

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Jun 25, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 68

  • A

    Paint or post a sign indicating floors missing and or near fire stairs at public hall, 3rd story

    Jun 25, 2026

    Open — Nov certified on time
  • A

    Paint or post a sign indicating floors missing and or near fire stairs at public hall, 2nd story

    Jun 25, 2026

    Open — Nov certified on time
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Jun 25, 2026

    Open — Nov certified on time
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jun 25, 2026

    Open — Nov certified on time
  • A

    Paint or post a sign indicating floors missing and or near fire stairs at public hall, 1st story

    Jun 25, 2026

    Open — Nov certified on time
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jun 25, 2026

    Open — Nov certified on time
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jun 25, 2026

    Open — Nov certified on time
  • B

    Remove all encumbrances consisting of household items at public hall, 2nd story

    Apr 29, 2026

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at all walls and ceiling at public hall, 3rd story

    Apr 29, 2026

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 3rd story

    Apr 29, 2026

    Closed — Violation closed
Show 40 more ↓
  • B

    Repair the roof so that it will not leak over the ceiling at public hall, 3rd story

    Apr 29, 2026

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items at public hall, 3rd story

    Apr 29, 2026

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items at public hall, 1st story

    Apr 29, 2026

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective intercom system from building entrance to the return buzzer at east wall in the kitchenette located at apt 3f, 3rd story, 1st apartment from west at north

    Mar 18, 2026 · Apt 3F

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective entrance door at east wall in the 1st room from north at west located at apt 3f, 3rd story, 1st apartment from west at north

    Mar 18, 2026 · Apt 3F

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective entrance door at east wall in the 2nd room from north at west located at apt 3f, 3rd story, 1st apartment from west at north

    Mar 18, 2026 · Apt 3F

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from west at north

    Mar 18, 2026 · Apt 3F

    Closed — Violation dismissed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling at public hall, 3rd story

    Mar 18, 2026

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from west at north

    Mar 18, 2026 · Apt 3F

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 3, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 16, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 29, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 8, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 16, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 24, 2018

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective metal ceiling in the kitchen located at apt 1r, 1st story, apartment at south

    Sep 27, 2018 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic tiles east wall at shower stall in the bathroom located at apt 1r, 1st story, apartment at south

    Sep 27, 2018 · Apt 1R

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 1r, 1st story, apartment at south

    Sep 27, 2018 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective balance lower sash window at west wall in the 3rd room from east located at apt 1r, 1st story, apartment at south

    Sep 27, 2018 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1r, 1st story, apartment at south

    Sep 27, 2018 · Apt 1R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt 1r, 1st story, apartment at south

    Sep 27, 2018 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1r, 1st story, apartment at south

    Sep 27, 2018 · Apt 1R

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective metal ceiling in the bathroom located at apt 1r, 1st story, apartment at south

    Sep 27, 2018 · Apt 1R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 1r, 1st story, apartment at south

    Sep 27, 2018 · Apt 1R

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of vermin ants in the entire apartment located at apt 1r, 1st story, apartment at south

    Sep 27, 2018 · Apt 1R

    Closed — Violation dismissed
  • B

    Arrange and make self-closing the doors .. in the entrance located at apt 1r, 1st story, apartment at south

    Sep 27, 2018 · Apt 1R

    Open — Invalid certification
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 6, 2017

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 16, 2015

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood step 9th from bottom at public hall stairs, 3rd story

    Jan 23, 2013

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective mail box at lobby, 1st story

    Jan 23, 2013

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the kitchen located at apt 3, 3rd story

    Jan 23, 2013 · Apt 3

    Open — Nov sent out
  • B

    Properly secure the loose hand rail at public hall stairs, 3rd story

    Jan 23, 2013

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective wood under window at south wall at public hall, 3rd story

    Jan 23, 2013

    Open — Nov sent out
  • A

    Refit metal door in the entrance located at apt 3, 3rd story

    Jan 23, 2013 · Apt 3

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective ceramic floor at shower in the bathroom located at apt 3, 3rd story

    Jan 23, 2013 · Apt 3

    Open — Nov sent out
  • B

    Section 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition drop ceiling in the bathroom located at apt 3, 3rd story

    Jan 23, 2013 · Apt 3

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north

    Apr 2, 2012 · Apt 2

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of evidence of concealed water leak over ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from west at north

    Apr 2, 2012 · Apt 2

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 2

  • Class - 2

    Observed sidewalk shed installed not as per code. decking of sidewalk shed is not extended additional 5 feet beyond work area at exp#1. decking of sidewalk shed shall extend the full length of work area plus ad

    Aug 20, 2024 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to safeguard; atoi observed ongoing construction under job #s01077814. supported scaffold constructed on site does not comply with chapter 33 of nyc bc. work area on scaffold is not fully planked, missi

    Jul 30, 2024 · Penalty $10,000

    Resolve

Complaints

  • Electric

    Wiring

    Mar 12, 2026 · Apt 3F

    Close
  • Electric

    Lighting

    Mar 12, 2026 · Apt 3F

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 12, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 12, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Mar 12, 2026 · Apt 3F

    Close
  • General

    Bell/buzzer/intercom

    Mar 12, 2026 · Apt 3F

    Close
  • Door/window

    Door

    Mar 12, 2026 · Apt 3F

    Close
  • Water leak

    Heavy flow

    Mar 12, 2026 · Apt 3F

    Close
  • Paint/plaster

    Wall

    Mar 12, 2026 · Apt 3F

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 12, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Water leak

    Slow leak

    Sep 22, 2018 · Apt 1R

    Close
  • Door/window

    Window frame

    Sep 20, 2018 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Sep 20, 2018 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Sep 20, 2018 · Apt 1R

    Close
  • Paint/plaster

    Wall

    Sep 20, 2018 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Sep 20, 2018 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Aug 6, 2018 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Aug 6, 2018 · Apt 1R

    Close
  • Paint/plaster

    Ceiling

    Aug 6, 2018 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Nov 7, 2014 · Apt 1F

    Close
  • Heating

    Heat related

    Feb 24, 2014 · Apt 2

    Close
  • Heating

    Heat related

    Jan 2, 2014 · Apt 3

    Close
  • Heating

    Heat related

    Nov 28, 2013 · Apt 3

    Close
  • Heating

    Heat related

    Jan 14, 2013 · Apt 3

    Close
  • General

    Mailbox

    Jan 14, 2013 · Apt 3

    Close
  • General

    Floor

    Jan 14, 2013 · Apt 3

    Close
  • General

    Stairs

    Jan 14, 2013 · Apt 3

    Close
  • Paint/plaster

    Door/frame

    Oct 3, 2012 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Oct 3, 2012 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Oct 3, 2012 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Oct 3, 2012 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Oct 3, 2012 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Oct 3, 2012 · Apt 1FL

    Close
  • Paint/plaster

    Wall

    Oct 3, 2012 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Oct 3, 2012 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Oct 3, 2012 · Apt 1FL

    Close
  • Paint/plaster

    Ceiling

    Oct 3, 2012 · Apt 1FL

    Close
  • Paint/plaster

    Window/frame

    Oct 3, 2012 · Apt 1FL

    Close
  • Heating

    Heat related

    Mar 30, 2012 · Apt 2

    Close
  • General

    Windows

    Nov 25, 2011 · Apt 4

    Close
  • General

    Windows

    Nov 25, 2011 · Apt 4

    Close
  • Paint/plaster

    Ceiling

    Sep 14, 2011 · Apt 4

    Close
  • General

    Stairs

    Sep 14, 2011 · Apt 4

    Close
  • General

    Windows

    Sep 14, 2011 · Apt 4

    Close
  • General

    Stairs

    Sep 14, 2011 · Apt 4

    Close
  • Paint/plaster

    Ceiling

    Sep 14, 2011 · Apt 4

    Close
  • Plumbing

    Basin/sink

    Sep 14, 2011 · Apt 4

    Close
  • General

    Mold

    Sep 6, 2011 · Apt 2

    Close
  • Nonconst

    Vermin

    Sep 6, 2011 · Apt 2

    Close
  • Nonconst

    Vermin

    Sep 6, 2011 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1931
Floors
3
Residential units
4
Building area
1,350 ft²
Lot area
1,100 ft²
Zoning
R3-2
Community board
501
Council district
49
Block / lot
544 / 96
Assessed value
$136,350
Landmark / historic district
No

HPD registration #500312, last renewed Jul 22, 2025.

Questions about 521 Van Duzer Street

Who owns 521 Van Duzer Street?

The owner of record in NYC Department of City Planning PLUTO data is Chen&C&F LLC.

Does 521 Van Duzer Street have violations?

Yes. NYC HPD has recorded 68 housing violations at this property.

Is 521 Van Duzer Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 521 Van Duzer Street built?

City records list 1931 as the year it was built.

How many apartments are in 521 Van Duzer Street?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.