roofy

281 Van Duzer Street

Staten Island, NY 10304BBL 5-00508-0017Map

Owner of record: Krikunov, Sergey

281 Van Duzer Street is a mixed residential and retail building built in 1930 in Staten Island, 10304. It has 6 residential units across 3 floors. The owner of record is Krikunov, Sergey. HPD has recorded 167 housing violations here, most recently on September 1, 2026. 22 of the 50 most recent violations are still open.

HPD violations
167
DOB violations
22
ECB violations
0
HPD complaints
115

What to know

Concern
22 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 1, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 167

  • C

    Provide ready access to buildings heating system boiler room door locked at cellar at boiler room

    Sep 1, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from east at south

    Sep 1, 2026 · Apt 1

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the foyer located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Open — Defect letter issued
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall, west wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, 1st door frame from west at north wall, 1st door frame from west at north wall, 1st door from west at north wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective wall cabinet at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective door at the north wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective door at the north wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Open — Defect letter issued
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south

    Feb 20, 2026 · Apt 2

    Closed — Violation closed
  • C

    Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    Jun 23, 2025

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective counter top at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Jun 23, 2025 · Apt 2

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective door frame at east wall in the foyer located at apt 2, 2nd story, 1st apartment from east at south

    Jun 23, 2025 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jun 23, 2025 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jun 23, 2025 · Apt 2

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jun 23, 2025 · Apt 2

    Open — Defect letter issued
  • B

    Properly repair or replace the broken or defective wall cabinet door at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Jun 23, 2025 · Apt 2

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jun 23, 2025 · Apt 2

    Open — Defect letter issued
  • C

    Correct failure to notify occupants and/or to investigate lead-based paint hazards.

    Jun 23, 2025

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, 1st door from west at north wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the south wall in the foyer located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st door from west at north wall in the foyer located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, 1st door from west at north wall, south wall, east wall in the 3rd room from east at south located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at north wall and at west wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective baseboard radiator at south wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Open — Defect letter issued
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at south, the kitchen , the bathroom located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 3rd room from east at south located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, south wall, west wall in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the foyer located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the foyer located at apt 2, 2nd story, 1st apartment from east at south

    Mar 31, 2025 · Apt 2

    Open — Defect letter issued
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Mar 26, 2025 · Apt 2

    Open — Defect letter issued
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Mar 26, 2025 · Apt 2

    Open — Defect letter issued
  • B

    Properly repair or replace the broken or defective counter top at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Mar 26, 2025 · Apt 2

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor at west wall and at east wall in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from east at south

    Mar 26, 2025 · Apt 2

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective base cabinet doors at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from east at south

    Mar 26, 2025 · Apt 2

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2, 2nd story, 1st apartment from east at south

    Mar 26, 2025 · Apt 2

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Mar 26, 2025 · Apt 2

    Closed — Violation closed

DOB building violations · 22

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
Show 12 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 4, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 4, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 4, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 4, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 4, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 4, 1993

    Dob violation - dismissed
  • Boiler boiler optional

    4a/18b store boilers need low water cut offs and manual reset aquistats

    Feb 13, 1990

    Dob violation - dismissed
  • Boiler boiler optional

    4a/18b store boiler needs low water cut off and manual reset aquistat

    Nov 22, 1989

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Appliance

    Electric/gas range

    Aug 28, 2026 · Apt 3

    Close
  • Heat/hot water

    Entire building

    Aug 28, 2026 · Apt 3

    Close
  • Appliance

    Refrigerator

    May 9, 2026 · Apt 2

    Close
  • Appliance

    Refrigerator

    May 9, 2026 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Feb 12, 2026 · Apt 1

    Close
  • Door/window

    Window frame

    Feb 12, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Feb 12, 2026 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Feb 12, 2026 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Feb 3, 2026 · Apt 2

    Close
  • Appliance

    Refrigerator

    Feb 3, 2026 · Apt 2

    Close
Show 40 more ↓
  • Water leak

    Slow leak

    Feb 3, 2026 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Feb 3, 2026 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Feb 3, 2026 · Apt 2

    Close
  • Paint/plaster

    Window/frame

    Feb 3, 2026 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2026 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Jan 29, 2026 · Apt 2

    Close
  • Water leak

    Slow leak

    Jan 29, 2026 · Apt 2

    Close
  • Appliance

    Refrigerator

    Jan 29, 2026 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Jan 29, 2026 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jan 29, 2026 · Apt 2

    Close
  • Door/window

    Window frame

    Jan 16, 2026 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Jan 16, 2026 · Apt 1

    Close
  • Paint/plaster

    Door/frame

    Jun 25, 2025 · Apt 2

    Close
  • Paint/plaster

    Door/frame

    Jun 18, 2025 · Apt 2

    Close
  • Appliance

    Refrigerator

    Jun 18, 2025 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Jun 18, 2025 · Apt 2

    Close
  • General

    Cabinet

    Jun 18, 2025 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Jun 18, 2025 · Apt 2

    Close
  • Paint/plaster

    Door/frame

    Mar 27, 2025 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Mar 24, 2025 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Mar 24, 2025 · Apt 2

    Close
  • General

    Cabinet

    Mar 24, 2025 · Apt 2

    Close
  • Appliance

    Refrigerator

    Mar 24, 2025 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Mar 24, 2025 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Mar 24, 2025 · Apt 2

    Close
  • Appliance

    Refrigerator

    Mar 7, 2025 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Mar 7, 2025 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Mar 7, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Mar 7, 2025 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Mar 7, 2025 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Mar 7, 2025 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Jan 31, 2025 · Apt 2NDFLO

    Close
  • General

    Cabinet

    Jan 31, 2025 · Apt 2NDFLO

    Close
  • Flooring/stairs

    Floor

    Jan 31, 2025 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Pests

    Jan 31, 2025 · Apt 2NDFLO

    Close
  • Flooring/stairs

    Floor

    Jan 31, 2025 · Apt 2NDFLO

    Close
  • Plumbing

    Radiator

    Jan 31, 2025 · Apt 2NDFLO

    Close
  • Appliance

    Refrigerator

    Jan 31, 2025 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Pests

    Jan 31, 2025 · Apt 2NDFLO

    Close
  • Appliance

    Refrigerator

    Oct 31, 2024 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S5)
Year built
1930
Floors
3
Residential units
6
Building area
4,995 ft²
Lot area
2,421 ft²
Zoning
R6B
Community board
501
Council district
49
Block / lot
508 / 17
Assessed value
$198,900
Landmark / historic district
No

HPD registration #500699, last renewed Aug 25, 2025.

Questions about 281 Van Duzer Street

Who owns 281 Van Duzer Street?

The owner of record in NYC Department of City Planning PLUTO data is Krikunov, Sergey.

Does 281 Van Duzer Street have violations?

Yes. NYC HPD has recorded 167 housing violations at this property.

Is 281 Van Duzer Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 281 Van Duzer Street built?

City records list 1930 as the year it was built.

How many apartments are in 281 Van Duzer Street?

It has 6 residential units and 7 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.