210 Van Duzer Street
Staten Island, NY 10301BBL 5-00506-0011Map
Owner of record: Passi, Umesh
210 Van Duzer Street is a two-family home built in 1899 in Staten Island, 10301. It has 2 residential units across 2.5 floors. The owner of record is Passi, Umesh. HPD has recorded 51 housing violations here, most recently on November 26, 2025. 21 of the 50 most recent violations are still open.
- HPD violations
- 51
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 127
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 51
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 26, 2025
Open — Info nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 aq ft at north window frame window frame from west at north wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south original violation 17726290 issued 27-feb-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Feb 27, 2025 · Apt 2
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 2nd window frame from north at east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2025 · Apt 2
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2025 · Apt 2
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, 1st door frame from south at west wall in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, ceiling in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective connection at wasteline at sink in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 aq ft at north window frame 1st window frame from west at north wall in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Feb 27, 2025 · Apt 2
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 5, 2024
Closed — Violation dismissed
Show 40 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 30, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2022
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Nov 9, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 7, 2019
Closed — Violation dismissed - ANon-hazardous
Refit doors at wood cabinets at north. south and west walls in the kitchen located at apt 2, 2nd story, 1st apartment from east at south
Jun 14, 2019 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Jun 14, 2019 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of uncapped steam pipe at radiator shut valve in the bathroom located at apt 2ndfl, 2nd story
Sep 28, 2018 · Apt 2NDFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east at north located at apt 2ndfl, 2nd story
Sep 28, 2018 · Apt 2NDFL
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line at wash basin in the bathroom located at apt 2ndfl, 2nd story
Sep 28, 2018 · Apt 2NDFL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 2ndfl, 2nd story
Sep 28, 2018 · Apt 2NDFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east at south located at apt 2ndfl, 2nd story
Sep 28, 2018 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Replace with new the missing electric outlet cover at south wall in the 1st room from east at north located at apt 2ndfl, 2nd story
Sep 28, 2018 · Apt 2NDFL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 2ndfl, 2nd story
Sep 28, 2018 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective entrance door in the bathroom located at apt 2ndfl, 2nd story
Sep 28, 2018 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tile in the kitchen located at apt 2ndfl, 2nd story
Sep 28, 2018 · Apt 2NDFL
Open — Nov sent out - BHazardous
Properly repair the broken or defective upper cabinets at south and west walls in the kitchen located at apt 2ndfl, 2nd story
Sep 28, 2018 · Apt 2NDFL
Open — Nov sent out - BHazardous
Replace with new the missing ( 2 ) balusters at stairs at public hall, 1st story
Aug 27, 2015
Closed — Violation closed - CImmediately hazardous
Replace with new the missing handrails at north and south at stairs front entrance to building
Aug 27, 2015
Closed — Violation closed - BHazardous
Abate the nuisance consisting of concealed water leak over ceiling in the bathroom located at apt 1, 1st story
Aug 2, 2010 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... 1 sq, ft. ceiling in the 1st room from east located at apt 1, 1st story
Aug 2, 2010 · Apt 1
Closed — Violation closed - ANon-hazardous
And department rules and regulations: scrape and remove rust scales and paint with two coats of paint the radiators throughtout in the entire apartment located at apt 1, 1st story
Aug 2, 2010 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east located at apt 1, 1st story
Aug 2, 2010 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective connection wasteline at sink in the kitchen located at apt 1, 1st story
Aug 2, 2010 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective door bell in the entrance located at apt 1, 1st story
Aug 2, 2010 · Apt 1
Closed — Violation closed - ANon-hazardous
Refit wood door at lobby, 1st story
Aug 2, 2010
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall in the kitchen located at apt 1, 1st story
Aug 2, 2010 · Apt 1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of over grown weeds rear yard
Aug 2, 2010
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective top brick step at stoop
Aug 2, 2010
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1, 1st story
Mar 22, 2010 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective door bell in the entrance located at apt 1, 1st story
Mar 22, 2010 · Apt 1
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 1, 1st story
Mar 22, 2010 · Apt 1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of concealed water leak over ceiling in the bathroom located at apt 1, 1st story
Mar 22, 2010 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wastline at wash basin in the kitchen located at apt 1, 1st story
Mar 22, 2010 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective radiator vale at west wall in the 2nd room from north located at apt 1, 1st story
Nov 20, 2009 · Apt 1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of concealed leak over ceiling in the bathroom located at apt 1, 1st story
Nov 20, 2009 · Apt 1
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin ants in the entire apartment located at apt 2, 2nd story
Aug 24, 2009 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2, 2nd story
Aug 24, 2009 · Apt 2
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective shelves inside wall cabinets in the kitchen located at apt 1, 1st story
Aug 19, 2008 · Apt 1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of concealed water leak over ceiling in the bathroom located at apt 1, 1st story
Jul 24, 2008 · Apt 1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1, 1st story
Jun 12, 2008 · Apt 1
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Apartment only
Jan 4, 2026 · Apt 1STFLO
Close - Unsanitary condition
Mold
Jan 4, 2026 · Apt 1STFLO
Close - Plumbing
Steam pipe/riser
Jan 4, 2026 · Apt 1STFLO
Close - Water leak
Slow leak
Jan 4, 2026 · Apt 1STFLO
Close - Paint/plaster
Ceiling
Jan 4, 2026 · Apt 1STFLO
Close - Electric
Wiring
Jan 4, 2026 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Jan 4, 2026 · Apt 1STFLO
Close - Unsanitary condition
Sewage
Jan 4, 2026 · Apt 1STFLO
Close - Safety
Window guard broken/missing
Mar 6, 2025 · Apt 2
Close - Unsanitary condition
Mold
Mar 6, 2025 · Apt 2
Close
Show 40 more ↓
- Plumbing
Basin/sink
Feb 27, 2025 · Apt 2
Close - Appliance
Electric/gas range
Feb 27, 2025 · Apt 2
Close - Paint/plaster
Wall
Feb 27, 2025 · Apt 2
Close - Appliance
Electric/gas range
Feb 27, 2025 · Apt 2
Close - Electric
Power outage
Sep 12, 2023 · Apt 2
Close - Heat/hot water
Apartment only
Aug 2, 2023 · Apt 2
Close - Door/window
Door frame
Aug 2, 2023 · Apt 2
Close - General
Cabinet
Aug 2, 2023 · Apt 2
Close - Unsanitary condition
Mold
Aug 2, 2023 · Apt 2
Close - Paint/plaster
Ceiling
Aug 2, 2023 · Apt 2
Close - Flooring/stairs
Floor
Jun 13, 2019 · Apt 2
Close - Paint/plaster
Ceiling
Sep 26, 2018 · Apt 2NDFL
Close - Plumbing
Basin/sink
Sep 26, 2018 · Apt 2NDFL
Close - Appliance
Electric/gas range
Sep 26, 2018 · Apt 2NDFL
Close - General
Cabinet
Sep 26, 2018 · Apt 2NDFL
Close - Appliance
Refrigerator
Sep 26, 2018 · Apt 2NDFL
Close - Flooring/stairs
Floor
Sep 26, 2018 · Apt 2NDFL
Close - Unsanitary condition
Pests
Sep 26, 2018 · Apt 2NDFL
Close - Flooring/stairs
Floor
Sep 26, 2018 · Apt 2NDFL
Close - Unsanitary condition
Pests
Sep 26, 2018 · Apt 2NDFL
Close - Door/window
Door
Sep 26, 2018 · Apt 2NDFL
Close - Electric
Outlet/switch
Sep 26, 2018 · Apt 2NDFL
Close - Paint/plaster
Wall
Sep 26, 2018 · Apt 2NDFL
Close - Water leak
Heavy flow
Sep 26, 2018 · Apt 2NDFL
Close - Unsanitary condition
Mold
Sep 26, 2018 · Apt 2NDFL
Close - Plumbing
Basin/sink
Sep 26, 2018 · Apt 2NDFL
Close - Paint/plaster
Ceiling
Sep 26, 2018 · Apt 2NDFL
Close - Flooring/stairs
Floor
Sep 26, 2018 · Apt 2NDFL
Close - Plumbing
Steam pipe/riser
Sep 26, 2018 · Apt 2NDFL
Close - Flooring/stairs
Stairs
Aug 26, 2015 · Apt BLDG
Close - Electric
No lighting
Aug 26, 2015 · Apt BLDG
Close - General
Window guards
Apr 22, 2013 · Apt 2
Close - General
Stairs
Apr 22, 2013 · Apt 2
Close - General
Stairs
Apr 22, 2013 · Apt 2
Close - Electric
Bell-buzzer/intercom
Jul 28, 2010 · Apt 1
Close - General
Doors
Jul 28, 2010 · Apt 1
Close - Plumbing
Basin/sink
Jul 28, 2010 · Apt 1
Close - General
Floor
Jul 28, 2010 · Apt 1
Close - Plumbing
Water-leaks
Jul 28, 2010 · Apt 1
Close - Paint/plaster
Radiator
Jul 28, 2010 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1899
- Floors
- 2.5
- Residential units
- 2
- Building area
- 1,731 ft²
- Lot area
- 2,500 ft²
- Zoning
- R3X
- Community board
- 501
- Council district
- 49
- Block / lot
- 506 / 11
- Assessed value
- $34,020
- Landmark / historic district
- No
HPD registration #15247, last renewed Mar 17, 2025.
Questions about 210 Van Duzer Street
Who owns 210 Van Duzer Street?
The owner of record in NYC Department of City Planning PLUTO data is Passi, Umesh.
Does 210 Van Duzer Street have violations?
Yes. NYC HPD has recorded 51 housing violations at this property.
Is 210 Van Duzer Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 210 Van Duzer Street built?
City records list 1899 as the year it was built.
How many apartments are in 210 Van Duzer Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.