663 Bay Street
Staten Island, NY 10304BBL 5-00496-0110Map
Owner of record: 661 Bay St Ventures LLC
663 Bay Street is a mixed residential and retail building built in 1931 in Staten Island, 10304. It has 4 residential units across 3 floors. The owner of record is 661 Bay St Ventures LLC. HPD has recorded 268 housing violations here, most recently on May 7, 2026. 41 of the 50 most recent violations are still open.
- HPD violations
- 268
- DOB violations
- 41
- ECB violations
- 24
- HPD complaints
- 152
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 268
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective at building entrance at public hall, 1st story
Mar 4, 2024
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at north located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Mar 4, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 4, 2024
Open — Nov sent out - BHazardous
Properly secure the loose handrails at north at public hall stairs, 2nd story
Mar 4, 2024
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Mar 4, 2024
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Mar 4, 2024
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at south wall in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tile at floor in the private hallway located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at light fixture at ceiling in the 3rd room from east at north located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from east at north located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... approx 12sq ft at ceiling in the kitchen located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — First no access to re- inspect violation - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3r, 3rd story, 1st apartment from west at north
Mar 4, 2024 · Apt 3R
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots and household items at fire escape, 3rd story
May 4, 2022
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 2nd story
May 4, 2022
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and north wall at public hall, 3rd story
May 4, 2022
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retarded plaster at ceiling at public hall, 2nd story
May 4, 2022
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retarded plaster at ceiling and north wall at public hall, 3rd story
May 4, 2022
Open — Nov sent out - ANon-hazardous
Refit the door at the main entrance door from the street at public hall, 1st story
Apr 15, 2022
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective locking device at vestibule door at public hall, 1st story
Apr 15, 2022
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 2nd story
Apr 15, 2022
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots and household items at front at public hall, 3rd story
Apr 15, 2022
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling and north wall at public hall, 3rd story
Apr 15, 2022
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Apr 15, 2022 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Apr 15, 2022 · Apt 3R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Apr 15, 2022 · Apt 3R
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective .. in the entrance located at apt 3r, 3rd story, 1st apartment from east at south
Apr 15, 2022 · Apt 3R
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets washbasin in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south
Apr 15, 2022 · Apt 3R
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding the maximum allowable temperature of 130 degree fah in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south
Apr 15, 2022 · Apt 3R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Apr 15, 2022 · Apt 3R
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Apr 15, 2022
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Apr 15, 2022 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective and make operative the locking device at vestibule door at public hall, 1st story
Apr 7, 2022
Open — Nov sent out - CImmediately hazardous
Replace with new the missing balusters at public hall stairs, 1st story
Apr 7, 2022
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Apr 7, 2022
Open — Nov sent out - ANon-hazardous
Refit main entrance door to the building at public hall, 1st story
Apr 7, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 8, 2022
Closed — Violation dismissed
DOB building violations · 41
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Construction other optional
Exp2,1stfl wall around door was prtlly dtachd w/header inadequately supportd.walls inadequately bracd/shored.ownr to immed shore,brace,& temp wthrprf bldg undr fulltime nyspe onsite sprvsn&drctn.nyspe to submt means&methds to feu
Dec 23, 2024
Dob violation - active - Construction other optional
Full vacate/failure to maintain bldg in a safe condition 2nd&3rdfl, exp1 brck wall was dtachd&open apprx 20ft w.bldg open & exposd.rem
Dec 23, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 13, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 16, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2024
Dob violation - active - Construction other optional
Engineers report requested toverufy stability of facade due to partial facade collapse at exposure #1 with a 6'x10' section of brick facade at 2nd floor collapsing onto shed
Apr 13, 2024
Dob violation - dismissed - Construction other optional
Vio24-50319
Jan 24, 2024
Dob violation - active
Show 31 more ↓
- Construction other optional
Front wall on bay st and side walls at thompson st at second floor are bulging and cracked.
Aug 9, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 1, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 28, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 8, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 4, 1993
Dob violation - dismissed
ECB violations · 24
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39120347z as of 6/10/2026., file a certificate
Jun 10, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39120348k as of 6/10/2026., file a certificate
Jun 10, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39119013k as of 6/10/2026., file a certificate
Jun 10, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39116132j as of 6/10/2026., file a certificate
Jun 10, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39111585j as of 6/10/2026., file a certificate
Jun 10, 2026 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. no certificate of correction on file for vio#39092245m as of 6/10/2026., file a certificate
Jun 10, 2026 · Penalty $6,250
Active - Class - 2
At time of inspection of a three-story mixed-use building alteration. a sidewalk shed was observed in place at exp# 1&2 without the required information panel on parapet. this condition creates a potential haza
Apr 10, 2025 · Penalty $1,250
Resolve - Class - 1
Bc.3314.1 at time of inspection of a three-story mixed-use building alt. supported scaffold was observed on top of sidewalk shed at exp#1, was not installed adequately as per bc. scaffold platform wasn't fully
Apr 10, 2025 · Penalty $10,000
Active - Class - 1
Unlawfully continued work while on notice of a stop work order. atoi, observed 2 workers on the sws passing down tools/materials to 1 worker below from demo operation of the exterior wall at exp1. partial stop
Jul 30, 2024 · Penalty $25,000
Active - Class - 1
Tampered with, removed or defaced a written posted stop work order. at time of inspection, observed stop work order issued on 1/24/2024, notice removed, no longer posted to the exterior of the building., comply
Jul 30, 2024 · Penalty $12,500
Active
Show 14 more ↓
- Class - 1
At time of inspection observed at exp#1 at 2nd floor level section of bricks missing an exposed rotted wood and opening. previously summons issued under complain# 5183638, maintain exterior building wall
Jul 12, 2024 · Penalty $25,000
Active - Class - 1
Atoi observed debris on sidewalk shed from partial facade collapse on 4/13/24. as of 6/6/24 engineers report requested under comp #5183639 has not been submitted to dob within the allotted 30 days from incident
Jun 6, 2024 · Penalty $6,250
Active - Class - 1
Failure to maintain building: the front masonry facade section at the 2nd floor level partially collapsed to the sidewalk shed at time of inspection, repair and/replace
Apr 13, 2024 · Penalty $1,250
Active - Class - 2
Inadequate supported scaffold bc-3314.1.atoi i observed installed supported scaffold at exp. # 2 does not meet code specification: inadequate debris netting and missing guardrails system in multiple location.
Jan 24, 2024 · Penalty $2,500
Active - Class - 2
At the time of inspection i observed a sidewalk shed in place at exp. # 1 and exp. # 2.also, i observed damaged parapet panel sws. this creates unsafe hazardous conditions for all pedestrians and vehicular pas
Jan 24, 2024 · Penalty $2,400
Active - Class - 1
Front wall on bay st and side walls at thompson st at second floor are bulging and cracked., repair and/replace; provide protection for public tenants and make all necessary repairs.
Aug 9, 2023 · Penalty $1,250
Active - Class - 1
Operation of a place of assembly w/o a current certificate of operation-premise occupied as an eating & drinking establishment with a postedoccupancy of 197 persons-arranged for occupancy>75 (see count attached
Mar 12, 2011 · Penalty $16,000
Active - Class - 2
Fail to maintain bldg in code compliant manner. use of prohibited hardware as per bc 1008.1.8.27-371(j) at side door legal lock at front door @ 663 side bolt lock on top of panic bans at both locations & locked
Nov 6, 2010
Resolve - Class - 1
Operation of a place of assembly w/o a current certificate of operation premises conducting business as a pa for 197 persons eating & drinking establishment & musical entertainment as per c o 500235083 no place
Nov 6, 2010 · Penalty $1,600
Active - Class - 2
Fail to maintain bldg in code compliant manner. lack of emergency lighting in exits as per bc 1006.1-27-384 (c) emergency exit light at sidedock not at time of inspection. remedy: repair/replace lighting
Nov 6, 2010
Resolve - Class - 2
Failure to provide approved accepted construction documents noted no plans provided for public assembly space on ground fl d/b/a "lions lair" according to sinage over bar interior pa#4/85 rem: provide plans
Jan 9, 2009
Resolve - Hazardous
4a, 19b, b4b.
Mar 10, 1995 · Penalty $250
Resolve - Hazardous
4a,18b
Nov 8, 1993
Resolve - Hazardous
18b,4a
Nov 8, 1993
Resolve
Complaints
- Paint/plaster
Wall
Apr 16, 2024 · Apt 3L
Close - Paint/plaster
Wall
Feb 27, 2024 · Apt 3R
Close - Appliance
Refrigerator
Feb 27, 2024 · Apt 3R
Close - Appliance
Electric/gas range
Feb 27, 2024 · Apt 3R
Close - Plumbing
Toilet
Feb 27, 2024 · Apt 3R
Close - Paint/plaster
Wall
Feb 27, 2024 · Apt 3R
Close - Appliance
Electric/gas range
Feb 26, 2024 · Apt 3L
Close - Safety
Fire escape
Aug 11, 2023 · Apt BLDG
Close - Safety
Fire escape
Aug 11, 2023 · Apt BLDG
Close - Electric
Lighting
Aug 11, 2023 · Apt BLDG
Close
Show 40 more ↓
- Electric
Wiring
Apr 21, 2022 · Apt BLDG
Close - Safety
Window guard broken/missing
Apr 14, 2022 · Apt 3R
Close - Plumbing
Boiler
Apr 14, 2022 · Apt 3R
Close - Unsanitary condition
Pests
Apr 14, 2022 · Apt 3R
Close - Unsanitary condition
Pests
Apr 14, 2022 · Apt 3R
Close - Door/window
Door
Apr 14, 2022 · Apt 3R
Close - Safety
Fire escape
Apr 14, 2022 · Apt 3R
Close - Plumbing
Basin/sink
Apr 14, 2022 · Apt 3R
Close - Plumbing
Water supply
Apr 14, 2022 · Apt 3R
Close - Safety
Smoke detector
Apr 14, 2022 · Apt 3R
Close - Safety
Carbon monoxide detector
Apr 14, 2022 · Apt 3R
Close - Electric
No lighting
Apr 7, 2022 · Apt BLDG
Close - Paint/plaster
Wall
Apr 7, 2022 · Apt BLDG
Close - Paint/plaster
Ceiling
Apr 7, 2022 · Apt BLDG
Close - Flooring/stairs
Stairs
Apr 7, 2022 · Apt BLDG
Close - Safety
Window guard broken/missing
Apr 7, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 7, 2022 · Apt BLDG
Close - Safety
Fire escape
Apr 7, 2022 · Apt BLDG
Close - Door/window
Door
Apr 7, 2022 · Apt BLDG
Close - Safety
Fire escape
Oct 23, 2019 · Apt BLDG
Close - General
Bell/buzzer/intercom
Oct 23, 2019 · Apt BLDG
Close - Flooring/stairs
Stairs
Oct 23, 2019 · Apt BLDG
Close - Electric
No lighting
Oct 23, 2019 · Apt BLDG
Close - Paint/plaster
Ceiling
Oct 23, 2019 · Apt BLDG
Close - Door/window
Door
Oct 23, 2019 · Apt BLDG
Close - Door/window
Door
Oct 23, 2019 · Apt BLDG
Close - Water leak
Slow leak
Oct 11, 2019 · Apt 3R
Close - Water leak
Slow leak
Oct 11, 2019 · Apt 3R
Close - Paint/plaster
Ceiling
Oct 11, 2019 · Apt 3R
Close - Door/window
Door frame
Oct 11, 2019 · Apt 3R
Close - Safety
Fire escape
Oct 11, 2019 · Apt 3R
Close - Paint/plaster
Ceiling
Oct 11, 2019 · Apt 3R
Close - Safety
Window guard broken/missing
Oct 11, 2019 · Apt 3R
Close - Safety
Smoke detector
Oct 11, 2019 · Apt 3R
Close - Safety
Carbon monoxide detector
Oct 11, 2019 · Apt 3R
Close - Flooring/stairs
Stairs
Oct 3, 2018 · Apt 3R
Close - Safety
Smoke detector
Oct 3, 2018 · Apt 3R
Close - Water leak
Slow leak
Oct 3, 2018 · Apt 3R
Close - Water leak
Slow leak
Oct 3, 2018 · Apt 3R
Close - Paint/plaster
Door/frame
Oct 3, 2018 · Apt 3R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S4)
- Year built
- 1931
- Floors
- 3
- Residential units
- 4
- Building area
- 7,650 ft²
- Lot area
- 3,182 ft²
- Zoning
- R4
- Community board
- 501
- Council district
- 49
- Block / lot
- 496 / 110
- Assessed value
- $325,350
- Landmark / historic district
- No
HPD registration #500376, last renewed Aug 28, 2025.
Questions about 663 Bay Street
Who owns 663 Bay Street?
The owner of record in NYC Department of City Planning PLUTO data is 661 Bay St Ventures LLC.
Does 663 Bay Street have violations?
Yes. NYC HPD has recorded 268 housing violations at this property.
Is 663 Bay Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 663 Bay Street built?
City records list 1931 as the year it was built.
How many apartments are in 663 Bay Street?
It has 4 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.