41 Seneca Street
Staten Island, NY 10310BBL 5-00180-0075Map
Owner of record: Anthony B. Ebisike
41 Seneca Street is a two-family home built in 1915 in Staten Island, 10310. It has 2 residential units across 2.5 floors. The owner of record is Anthony B. Ebisike. HPD has recorded 57 housing violations here, most recently on January 14, 2022. 39 of the 50 most recent violations are still open.
- HPD violations
- 57
- DOB violations
- 1
- ECB violations
- 2
- HPD complaints
- 55
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 57
- CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Lead docs submitted, acceptable - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall in the foyer located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective inner and outer glass panes at lower window sash at west wall in the 2nd room from north at west located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Closed — Violation closed - ANon-hazardous
Refit door at east wall in the foyer located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at east, the private hallway , the kitchen , the 2nd room from north at west, the 4th room from north located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the bathroom located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Closed — Violation closed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). - defective located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective light fixture at ceiling in the foyer located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall, north wall in the kitchen located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south wall, north wall, west wall, 1st window frame from south at west wall in the 2nd room from north at west located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall, west wall in the private hallway located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south wall, west wall, east wall, north wall in the 3rd room from north at east located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at north wall in the 4th room from north located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall in the bathroom located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall, north wall, ceiling in the bathroom located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... (approx. 10 sq ft) at north wall, ceiling in the bathroom located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from east at south wall, 1st door frame from west at north wall in the foyer located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at east wall, south wall, west wall in the foyer located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective inner glass pane at lower window sash at north wall in the kitchen located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 2nd apartment from west at north
Jan 14, 2022 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective 4th concrete tread up from bottom at stoop, 1st story
Mar 12, 2021
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north at east located at apt 1stflo, 1st story, 2nd apartment from west at north
Mar 12, 2021 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1stflo, 1st story, 2nd apartment from west at north
Mar 12, 2021 · Apt 1STFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color all walls in the entire apartment located at apt 1stflo, 1st story, 2nd apartment from west at north
Mar 12, 2021 · Apt 1STFLO
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 21, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1, 1st story
Jan 19, 2021 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story
Jan 19, 2021 · Apt 1
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilings in the entire apartment located at apt apt1, 1st story
Nov 27, 2019 · Apt APT1
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt apt1, 1st story
Nov 27, 2019 · Apt APT1
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective wood doors in the entire apartment located at apt apt1, 1st story
Nov 27, 2019 · Apt APT1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story
Nov 13, 2012 · Apt 1
Closed — Violation closed - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1, 1st story
Nov 13, 2012 · Apt 1
Closed — Violation closed - BHazardous
Properly secure the loose 3rd wood tread from bottom of stairs at west side entrance at cellar
Oct 25, 2012
Open — Nov sent out - CImmediately hazardous
Replace with new the missing 2nd wood tread from bottom of stairs at west side entrance at cellar
Oct 25, 2012
Closed — Violation closed - CImmediately hazardous
Cleanse and disinfect to the satisfaction of this department after removing the accumulation of water and sewage throughout at cellar
Oct 25, 2012
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... present at ceiling ( approx- 2 sq,ft ) in the bathroom located at apt 1, 1st story
Oct 25, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor inside base cabinets under washbasin in the bathroom located at apt 1, 1st story
Oct 25, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sheet-rock walls inside base cabinets under washbasin in the bathroom located at apt 1, 1st story
Oct 25, 2012 · Apt 1
Open — Nov sent out - BHazardous
Provide adequate lighting for ceiling light fixture at front porch , 1st story
Oct 25, 2012
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood and vinyl tiles floor in the bathroom located at apt 1, 1st story
Oct 25, 2012 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 1, 1st story
Oct 12, 2011 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood and vinyl tiles floor in the bathroom located at apt 1, 1st story
Oct 12, 2011 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective east wall inside base cabinet in the bathroom located at apt 1, 1st story
Oct 12, 2011 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line at wash basin in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Jun 29, 2010 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor thru-out in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Jun 29, 2010 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl tiles floor in the kitchen located at apt 1a, 1st story
Apr 6, 2010 · Apt 1A
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at cellar
Apr 6, 2010
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective rotted wood and vinyl tiles floor in the bathroom located at apt 1a, 1st story
Apr 6, 2010 · Apt 1A
Open — Not complied with
DOB building violations · 1
- Plumbing none
P-plumbing none
Feb 26, 2008
Dob violation - dismissed
ECB violations · 2
- Non-hazardous
Failure to maintain bldg noted gutters at 1 side of bldg pulling away from facia (approx 20ft) gutter at right side of bldg has fallen off bldg and is dangeling down suceptible to wind gusts remedy: repair or
Mar 18, 2008 · Penalty $180
Resolve - Hazardous
Failure to maintain bldg. defect noted. brick & masonry chimney has cracks & partitions of chimney missing at roof of 2 1/2 sty bldg. remedy: maintain bldg., repair chimney.
Feb 3, 2006 · Penalty $800
Resolve
Complaints
- Plumbing
Toilet
May 5, 2026 · Apt 1
Close - Flooring/stairs
Floor
May 5, 2026 · Apt 1
Close - Unsanitary condition
Pests
May 5, 2026 · Apt 1
Close - Plumbing
Bathtub/shower
May 5, 2026 · Apt 1
Close - Heat/hot water
Entire building
Jan 17, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 17, 2024 · Apt 1STFLO
Close - Electric
Power outage
Jul 17, 2022 · Apt BLDG
Close - Appliance
Electric/gas range
Mar 16, 2022 · Apt 1
Close - Plumbing
Steam pipe/riser
Jan 12, 2022 · Apt 1
Close - Heat/hot water
Apartment only
Jan 12, 2022 · Apt 1
Close
Show 40 more ↓
- Appliance
Refrigerator
Feb 20, 2021 · Apt 1FL
Close - Heat/hot water
Apartment only
Feb 20, 2021 · Apt 1FL
Close - Flooring/stairs
Floor
Jan 16, 2021 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Jan 16, 2021 · Apt 1STFLO
Close - Electric
No lighting
Nov 22, 2019 · Apt APT1
Close - Unsanitary condition
Pests
Nov 22, 2019 · Apt APT1
Close - Unsanitary condition
Mold
May 15, 2015 · Apt 1
Close - Plumbing
Water supply
May 15, 2015 · Apt 1
Close - Water leak
Heavy flow
May 15, 2015 · Apt 1
Close - Electric
No lighting
May 15, 2015 · Apt 1
Close - Electric
No lighting
May 15, 2015 · Apt 1
Close - Door/window
Window frame
May 15, 2015 · Apt 1
Close - Electric
No lighting
May 15, 2015 · Apt 1
Close - Heat/hot water
Apartment only
May 15, 2015 · Apt 1
Close - Heat/hot water
Apartment only
May 10, 2015 · Apt 1
Close - Electric
No lighting
May 10, 2015 · Apt 1
Close - Unsanitary condition
Mold
May 10, 2015 · Apt 1
Close - Water leak
Heavy flow
May 10, 2015 · Apt 1
Close - Paint/plaster
Ceiling
May 10, 2015 · Apt 1
Close - General
Cabinet
Nov 8, 2012 · Apt 1
Close - General
Floor
Nov 8, 2012 · Apt 1
Close - Plumbing
Sewer
Nov 8, 2012 · Apt 1
Close - Heating
Heat related
Nov 8, 2012 · Apt 1
Close - General
Cabinet
Oct 18, 2012 · Apt 1
Close - Electric
Lighting
Oct 18, 2012 · Apt 1
Close - General
Floor
Oct 18, 2012 · Apt 1
Close - Plumbing
Sewer
Oct 18, 2012 · Apt 1
Close - Plumbing
Water supply
Oct 18, 2012 · Apt 1
Close - Electric
Electric-supply
Oct 8, 2011 · Apt 1
Close - Plumbing
Sewer
Oct 8, 2011 · Apt 1
Close - General
Floor
Oct 8, 2011 · Apt 1
Close - General
Doors
Oct 8, 2011 · Apt 1
Close - Plumbing
Basin/sink
Oct 8, 2011 · Apt 1
Close - Nonconst
Vermin
Oct 8, 2011 · Apt 1
Close - Plumbing
Toilet
Oct 8, 2011 · Apt 1
Close - Plumbing
Bathtub/shower
Oct 8, 2011 · Apt 1
Close - Nonconst
Rubbish
Apr 2, 2010 · Apt 1A
Close - Plumbing
Water-leaks
Apr 2, 2010 · Apt 1A
Close - General
Floor
Apr 2, 2010 · Apt 1A
Close - Nonconst
Vermin
Apr 2, 2010 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1915
- Floors
- 2.5
- Residential units
- 2
- Building area
- 2,300 ft²
- Lot area
- 3,125 ft²
- Zoning
- R3A
- Community board
- 501
- Council district
- 49
- Block / lot
- 180 / 75
- Assessed value
- $47,340
- Landmark / historic district
- No
HPD registration #16907, last renewed Sep 25, 2025.
Questions about 41 Seneca Street
Who owns 41 Seneca Street?
The owner of record in NYC Department of City Planning PLUTO data is Anthony B. Ebisike.
Does 41 Seneca Street have violations?
Yes. NYC HPD has recorded 57 housing violations at this property.
Is 41 Seneca Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 41 Seneca Street built?
City records list 1915 as the year it was built.
How many apartments are in 41 Seneca Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.