216 Jersey Street
Staten Island, NY 10301BBL 5-00052-0133Map
Owner of record: Fairway Richmond Housing Devel Fund Co. , INC
216 Jersey Street is a walk-up apartment building built in 1984 in Staten Island, 10301. It has 20 residential units across 1 floor. The owner of record is Fairway Richmond Housing Devel Fund Co. , INC. HPD has recorded 196 housing violations here, most recently on July 14, 2026. 44 of the 50 most recent violations are still open.
- HPD violations
- 196
- DOB violations
- 2
- ECB violations
- 3
- HPD complaints
- 285
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 196
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 4th room from east at south located at apt 226a, 1st apartment from west at north
Jul 14, 2026 · Apt 226A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at north wall in the bathroom located at apt 226a, 1st apartment from west at north
Jul 14, 2026 · Apt 226A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 232a, 1st story, 1st apartment from east at south
Jun 12, 2026 · Apt 232A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 232a, 1st story, 1st apartment from east at south
Jun 12, 2026 · Apt 232A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 232a, 1st story, 1st apartment from east at south
Jun 12, 2026 · Apt 232A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Jun 10, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 220b, 2nd story, 8th apartment from south at west
Jun 10, 2026 · Apt 220B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at . in the entrance located at apt 218b, 2nd story, 9th apartment from south at west
Apr 25, 2026 · Apt 218B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the private hallway located at apt 218b, 2nd story, 9th apartment from south at west
Apr 25, 2026 · Apt 218B
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from east located at apt 218b, 2nd story, 9th apartment from south at west
Apr 25, 2026 · Apt 218B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 218b, 2nd story, 9th apartment from south at west
Apr 25, 2026 · Apt 218B
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at washbasin in the bathroom located at apt 218b, 2nd story, 9th apartment from south at west
Apr 25, 2026 · Apt 218B
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective water supply pipe under washbasin in the bathroom located at apt 218b, 2nd story, 9th apartment from south at west
Apr 25, 2026 · Apt 218B
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of slidebolt capable of padlock at door in the entrance located at apt 218b, 2nd story, 9th apartment from south at west
Apr 25, 2026 · Apt 218B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 4th room from east located at apt 218b, 2nd story, 9th apartment from south at west
Apr 25, 2026 · Apt 218B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 4th room from north located at apt 230a, 1st story, 2nd apartment from west at north
Apr 25, 2026 · Apt 230A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 3rd room from north located at apt 230a, 1st story, 2nd apartment from west at north
Apr 25, 2026 · Apt 230A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from north located at apt 230a, 1st story, 2nd apartment from west at north
Apr 25, 2026 · Apt 230A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the foyer located at apt 230a, 1st story, 2nd apartment from west at north
Apr 25, 2026 · Apt 230A
Open — Nov sent out - BHazardous
Properly secure the loose washbasin in the 1st bathroom from north located at apt 230a, 1st story, 2nd apartment from west at north
Apr 25, 2026 · Apt 230A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt 230a, 1st story, 2nd apartment from west at north
Apr 25, 2026 · Apt 230A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 230a, 1st story, 2nd apartment from west at north
Apr 25, 2026 · Apt 230A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 230a, 1st story, 2nd apartment from west at north
Apr 25, 2026 · Apt 230A
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 230a, 1st story, 2nd apartment from west at north
Apr 25, 2026 · Apt 230A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 230a, 1st story, 2nd apartment from west at north
Apr 25, 2026 · Apt 230A
Open — Notice of issuance sent to tenant - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at . in the entrance located at apt 230a, 1st story, 2nd apartment from west at north
Apr 25, 2026 · Apt 230A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 232a, 1st story, 1st apartment from east at south
Mar 11, 2026 · Apt 232A
Open — Notice of issuance sent to tenant - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 218b, 2nd story, 9th apartment from south at west
Mar 11, 2026 · Apt 218B
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 218b, 2nd story, 9th apartment from south at west
Mar 11, 2026 · Apt 218B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 218b, 2nd story, 9th apartment from south at west
Mar 11, 2026 · Apt 218B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all ceilings and all walls in the entire apartment located at apt 218b, 2nd story, 9th apartment from south at west
Mar 11, 2026 · Apt 218B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt 218b, 2nd story, 9th apartment from south at west
Mar 11, 2026 · Apt 218B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 218b, 2nd story, 9th apartment from south at west
Mar 11, 2026 · Apt 218B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 218b, 2nd story, 9th apartment from south at west
Mar 11, 2026 · Apt 218B
Open — Notice of issuance sent to tenant - BHazardous
Remove all obstructions and repair all defects in waste line at washbasin in the bathroom located at apt 218b, 2nd story, 9th apartment from south at west
Mar 11, 2026 · Apt 218B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 232a, 1st story, 1st apartment from east at south
Mar 11, 2026 · Apt 232A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl tile at floor in the foyer located at apt a, 1st story, 1st apartment from east at south , section ''232''
Aug 26, 2025 · Apt A
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tile at floor in the kitchen located at apt a, 1st story, 1st apartment from east at south , section ''232''
Aug 26, 2025 · Apt A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a, 1st story, 1st apartment from east at south , section ''232''
Aug 26, 2025 · Apt A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt a, 1st story, 1st apartment from east at south , section ''232''
Aug 26, 2025 · Apt A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a, 1st story, 1st apartment from east at south , section ''232''
Aug 26, 2025 · Apt A
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt a, 1st story, 1st apartment from east at south , section ''232''
Aug 26, 2025 · Apt A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south and north walls in the foyer located at apt a, 1st story, 1st apartment from east at south , section ''232''
Aug 26, 2025 · Apt A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 220b, 2nd story, 2nd apartment from south at west
Jun 25, 2025 · Apt 220B
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jun 25, 2025
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling in the 1st bathroom from north located at apt 220b, 2nd story, 2nd apartment from south at west
Jun 25, 2025 · Apt 220B
Open — Defect letter issued - ANon-hazardous
Cleanse to the satisfaction of this department the mildew on grout around bathtub and between ceramic tile at all walls in the 1st bathroom from north located at apt 220b, 2nd story, 2nd apartment from south at west
Jun 25, 2025 · Apt 220B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the foyer located at apt 220b, 2nd story, 2nd apartment from south at west
Jun 25, 2025 · Apt 220B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north and east walls in the 1st room from east located at apt 220b, 2nd story, 2nd apartment from south at west
Jun 25, 2025 · Apt 220B
Open — Nov sent out
DOB building violations · 2
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 4, 1993
Dob violation - dismissed
ECB violations · 3
- Class - 2
Certificate of correction not on file with department of buildings for class 1 failure to maintain violation #39116817m issued on 06/13/2024 for facade damage and interior walls not being maintained to code., f
Feb 24, 2025 · Penalty $1,250
Resolve - Class - 1
At time of inspection observed facade at exp#1 right and left corner have cracks, at exp#1 space between building wall and ground. suite 226b bathroom and bedroom between ceiling and wall have separation at the
Jun 13, 2024 · Penalty $625
Active - Non-hazardous
49- must support expansion tank with correct support system string is not acceptable
Nov 17, 1999
Resolve
Complaints
- Plumbing
Toilet
Aug 9, 2026 · Apt A
Close - Unsanitary condition
Mold
Jul 13, 2026 · Apt A
Close - Heat/hot water
Entire building
Jun 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 23, 2026 · Apt A
Close - Heat/hot water
Entire building
Jun 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 6, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Jun 5, 2026 · Apt A
Close - Heat/hot water
Apartment only
Jun 5, 2026 · Apt A
Close - Plumbing
Water supply
Mar 16, 2026 · Apt 218B
Close
Show 40 more ↓
- Appliance
Electric/gas range
Mar 6, 2026 · Apt 218B
Close - Appliance
Refrigerator
Mar 6, 2026 · Apt 230A
Close - Unsanitary condition
Pests
Mar 6, 2026 · Apt 228A
Close - Safety
Smoke detector
Mar 6, 2026 · Apt 224A
Close - Safety
Carbon monoxide detector
Mar 6, 2026 · Apt 224A
Close - Flooring/stairs
Floor
Mar 6, 2026 · Apt 224A
Close - Door/window
Window frame
Mar 6, 2026 · Apt 224A
Close - Flooring/stairs
Floor
Mar 6, 2026 · Apt 224A
Close - Flooring/stairs
Floor
Mar 6, 2026 · Apt 224A
Close - General
Ventilation system
Mar 6, 2026 · Apt 224A
Close - Paint/plaster
Ceiling
Mar 6, 2026 · Apt 224A
Close - Unsanitary condition
Mold
Mar 6, 2026 · Apt 224A
Close - Plumbing
Basin/sink
Mar 6, 2026 · Apt 224A
Close - Plumbing
Water supply
Mar 6, 2026 · Apt 224A
Close - Unsanitary condition
Pests
Mar 6, 2026 · Apt 218B
Close - Unsanitary condition
Pests
Mar 6, 2026 · Apt 218B
Close - Flooring/stairs
Floor
Mar 6, 2026 · Apt 218B
Close - Electric
Outlet/switch
Mar 6, 2026 · Apt 218B
Close - Paint/plaster
Wall
Mar 6, 2026 · Apt 218B
Close - Electric
Outlet/switch
Mar 6, 2026 · Apt 218B
Close - Door/window
Door
Mar 6, 2026 · Apt 218B
Close - General
Ventilation system
Mar 6, 2026 · Apt 218B
Close - Flooring/stairs
Floor
Mar 6, 2026 · Apt 218B
Close - Plumbing
Basin/sink
Mar 6, 2026 · Apt 218B
Close - Appliance
Refrigerator
Mar 6, 2026 · Apt 218B
Close - General
Ventilation system
Mar 6, 2026 · Apt 218B
Close - General
Ventilation system
Mar 6, 2026 · Apt 230A
Close - General
Ventilation system
Mar 6, 2026 · Apt 232A
Close - Door/window
Door
Mar 6, 2026 · Apt 232A
Close - Plumbing
Toilet
Mar 6, 2026 · Apt 232A
Close - Flooring/stairs
Floor
Mar 6, 2026 · Apt 232A
Close - Electric
Outlet/switch
Mar 6, 2026 · Apt 232A
Close - Door/window
Window frame
Mar 6, 2026 · Apt 232A
Close - Flooring/stairs
Floor
Mar 6, 2026 · Apt 232A
Close - Door/window
Window frame
Mar 6, 2026 · Apt 232A
Close - Flooring/stairs
Floor
Mar 6, 2026 · Apt 232A
Close - Paint/plaster
Ceiling
Mar 6, 2026 · Apt 232A
Close - Paint/plaster
Wall
Mar 6, 2026 · Apt 232A
Close - Door/window
Door
Mar 6, 2026 · Apt 230A
Close - Flooring/stairs
Floor
Mar 6, 2026 · Apt 228B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C9)
- Year built
- 1984
- Floors
- 1
- Residential units
- 20
- Building area
- 9,450 ft²
- Lot area
- 63,239 ft²
- Zoning
- R5
- Community board
- 501
- Council district
- 49
- Block / lot
- 52 / 133
- Assessed value
- $905,850
- Landmark / historic district
- No
HPD registration #501155, last renewed Sep 5, 2025.
Questions about 216 Jersey Street
Who owns 216 Jersey Street?
The owner of record in NYC Department of City Planning PLUTO data is Fairway Richmond Housing Devel Fund Co. , INC.
Does 216 Jersey Street have violations?
Yes. NYC HPD has recorded 196 housing violations at this property.
Is 216 Jersey Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 216 Jersey Street built?
City records list 1984 as the year it was built.
How many apartments are in 216 Jersey Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.