506 Richmond Terrace
Staten Island, NY 10301BBL 5-00052-0076Map
Owner of record: Four Properties Corp.
506 Richmond Terrace is a walk-up apartment building built in 1931 in Staten Island, 10301. It has 8 residential units across 3 floors. The owner of record is Four Properties Corp.. HPD has recorded 102 housing violations here, most recently on May 7, 2026. 13 of the 50 most recent violations are still open.
- HPD violations
- 102
- DOB violations
- 27
- ECB violations
- 19
- HPD complaints
- 163
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 102
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ( missing frame ) at public hall, 1st story
Jan 23, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 23, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at front entrance door to the building , 1st story
Jan 23, 2023
Closed — Violation closed - CImmediately hazardous
Replace with new the missing locking device at front entrance door to the building , 1st story
Jan 23, 2023
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective entrance door to building , 1st story
Jan 11, 2023
Closed — Violation closed - CImmediately hazardous
Replace with new the missing lock at entrance door to building , 1st story
Jan 11, 2023
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Replace with new the missing wired glass at entrance door to building , 1st story
Jan 11, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall at public hall, 2nd story
Jan 11, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 2nd story
Jan 11, 2023
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jan 11, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor ( sloping ) at public hall, 1st story
Jan 11, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
Jan 11, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 11, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 11, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective brick facade at front of building , 1st story
Jan 11, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor (missing frame) at public hall, 1st story
Jan 11, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & all walls in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Jan 3, 2020 · Apt 2
Open — Nov certified late - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 1st story, 1st apartment from east at south
Jan 3, 2020 · Apt 2
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls & ceilings in the entire apartment located at apt 2, 1st story, 1st apartment from east at south
Jan 3, 2020 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2, 1st story, 1st apartment from east at south
Jan 3, 2020 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2, 1st story, 1st apartment from east at south
Jan 3, 2020 · Apt 2
Open — Nov certified late - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 1st story, 1st apartment from east at south
Jan 3, 2020 · Apt 2
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2, 1st story, 1st apartment from east at south
Jan 3, 2020 · Apt 2
Open — Nov certified late - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 2, 1st story, 1st apartment from east at south
Jan 3, 2020 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north located at apt 2, 2nd story, 1st apartment from east at south
Jan 3, 2020 · Apt 2
Open — Nov certified late - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 2, 2nd story, 1st apartment from east at south
Jan 3, 2020 · Apt 2
Open — Nov certified late - CImmediately hazardous
Replace with new the broken or defective locking assembly at building entrance door at public hall, 1st story
Dec 10, 2019
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 6, 2017
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall at public hall, 3rd story
Jan 26, 2017
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of offensive oders emanating from the 1st story rear apartment into the public hall , 1st story
Sep 13, 2016
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2015
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of plexi-glass installed at lower sash east window in the kitchen located at apt 4l, 3rd story, 2nd apartment from south at west
Feb 9, 2015 · Apt 4L
Closed — Violation closed - BHazardous
Properly repair the broken or defective leaking shut-off valve at radiator in the 2nd room from north at west located at apt 4l, 3rd story, 2nd apartment from south at west
Feb 9, 2015 · Apt 4L
Closed — Violation closed - BHazardous
Replace with new the missing control-knob at shut-off valve at radiator in the 2nd room from north at west located at apt 4l, 3rd story, 2nd apartment from south at west
Feb 9, 2015 · Apt 4L
Closed — Violation closed - BHazardous
Properly repair the broken or defective leaking shut-off valve at radiator in the 2nd room from north at east located at apt 4l, 3rd story, 2nd apartment from south at west
Feb 9, 2015 · Apt 4L
Closed — Violation closed - BHazardous
Replace with new the missing control-knob at shut-off valve at radiator in the 2nd room from north at east located at apt 4l, 3rd story, 2nd apartment from south at west
Feb 9, 2015 · Apt 4L
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarding ceiling and walls at all stories at public hall
Nov 3, 2014
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
Nov 3, 2014
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at wood floor at public hall, 3rd story
Nov 3, 2014
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at wood floor at public hall, 2nd story
Nov 3, 2014
Closed — Violation closed - BHazardous
Properly secure the loose light fixture at ceiling at public hall, 3rd story
Nov 3, 2014
Closed — Violation closed - CImmediately hazardous
Properly secure the loose 5th, 6th, 7th, 8th and 9th wood treads from bottom of stairs at intermediate landing at bulkhead to roof
Nov 3, 2014
Closed — Violation closed
DOB building violations · 27
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Construction other optional
At time of inspection observed damage sustained to building ingress/egress where approx. 10 feet x 5 feet section of brick wall collapse bellow porch and rest of wall in danger to future collapse. vacate front porch (ingress/egress)
Apr 13, 2023
Dob violation - active - Construction other optional
At time of inspection observed damage sustained to building ingress/egress where approx. 10 feet x 5 feet section of brick wall collapse bellow porch and rest of wall in danger to future collapse.
Apr 13, 2023
Dob violation - active - Immediate emergency anythingoptional
Erect an approximate total of 30 linear feet of construction fence along the sidewalk enclosing the residential porch in order to
Apr 13, 2023
Dob violation - active - Construction other optional
Emergency work.on 4/13/23 east wall was damaged due to carimpacting bldg.porch was not supported.there is no potential of cllpse.immed do: 1.install temp shoring undr drect&cntinous supervsn of pe.file for prmt w/in 48 hours.2.install fence@east wall.prm
Apr 13, 2023
Dob violation - active - Construction other optional
Ftm.east wall was damaged on 4/13/23 by car impacting the bldg.porch is not supported.lose brick noted@chimney lose&deterioratedcornice noted@east wall.owner to enagage nys pe&contractor to repair the bldg under permit.file for permit by 5/1/23 sign off by 7/1/23
Apr 12, 2023
Dob violation - active
Show 17 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Construction other optional
Stop all work- permit # 520258738 has been revoked remedy:stop all work-contact boro office
Jul 5, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Construction other optional
C-construction other optional
Jan 26, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Construction other optional
Location installed a sign w/o a permit
Jul 19, 2000
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active
ECB violations · 19
- Class - 1
Failure to maintain building in code-compliant manner..observed fire escape egress at york ave side of building obstructed with personal items littered along egress path to drop down ladder.., repair and/replac
Jan 12, 2026 · Penalty $3,125
Active - Class - 1
Unlawful acts. failure to comply with commissioner's order. failure to obtain engineers report concerning structurally deficient conditionscited in dob vio vio23-00979.., comply with commissioner's order
Jan 12, 2026 · Penalty $25,000
Active - Class - 1
Unlawful acts. failure to comply with commissioner's order. failure to obtain engineers report concerning structurally deficient conditions cited in dob vio vio23-00979., comply with commissioner's order
Feb 24, 2025
Resolve - Class - 1
Failure to maintain building in code compliant manner; observed fire escape egress at york ave side of building obstructed with ac units installed in windows and personal items littered along egress path to dro
Feb 24, 2025 · Penalty $1,250
Active - Class - 2
Work without permit. at time of inspection, observed the cmu masonry exterior wall below the porch at exp4 has been repaired without a work permit. no permit issued on bis, dob now. emergency work permit in app
Jul 11, 2024 · Penalty $1,250
Active - Class - 1
Failure to comply with the commissioner's order in dob violation vio23-00979,dated 4/13/2023.respondent was required to submit an engineer'sreport concerning structurally deficient conditions.as of 10/11/2023,a
Oct 11, 2023
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35343323r issued on 9/4/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.comply with commissioners
Oct 30, 2018
Resolve - Class - 2
Work w/o permit. i observed in cellar newly installed grease trap withsanitary piping and fittings and couplings. no permits on file. photos taken. rmdy: obtain permit.
Sep 12, 2018 · Penalty $1,250
Active - Class - 1
Unlawfully worked against stop work order.observed:this comm spce had a stop work order isssued 7/5/17 under job#520258738 and job is complete 100% and being operated as a deli fully operational.rem;comply with
Sep 4, 2018
Resolve - Class - 2
Failure to maintain bldg wall(s) or appurtenances.noted on main entry staircase,stucco peeling exposing brick staircase,bricks have disintegration of mortar,loose bricdks also noted at corner of stairs.at roof
Feb 6, 2015
Resolve
Show 9 more ↓
- Class - 2
Failure to maintain noted: ceiling at rear of 1st flr loose and defective.ceiling at cellar level in total disrepair w/loose and hanging furring/stucco.sections of said ceiling missing-exposing slanted floor
Feb 8, 2013
Resolve - Class - 1
Failure to maintain bldg in code compliant manner: no fire stopping per 712.3;27-345 noted: at cellar level,missing fire rated material in numerous sections,exposing wooden memeber in case of fire. noted 1st fl
Feb 8, 2013
Resolve - Class - 2
Work w/o permit. noted: at cellar installed wood structural support beam, columns and concrete footings/pads,wood floor joists & sub-flooring for 1st story. work 100%completed.rmdy: obtain permit(s)
Feb 8, 2013
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: at 1st story commercial space exposure 4 side exit obstructed by garbage & card board boxes (exit sign adjacent to door) remedy: remove obstructions.
Feb 8, 2013 · Penalty $1,200
Active - Hazardous
Failure to maintain: defect noted- 1) sheet metal facing at 3rd floor window (york ave side) is loose, with section already fallen onto fire-escape, 2) gutter at 1 story porch is loose and pulling away (york
Jun 30, 2004 · Penalty $800
Active - Hazardous
Failure to maintain bldg.defects are:interior stairways sagging thruout 2nd to 4th flrs and roof between 3rd and 4th fls stairway pulling away and approx: 1/2 foot from level handrail supports broken,missing
Mar 23, 2004 · Penalty $800
Active - Non-hazardous
No sign permit.work without a permit in that an advertising sign approx 12ft long x 1dt high with 2 sides triangular dimensioned 3ft hign against wall tapering to 1ft at front x4ft wide has been erected at fron
Nov 30, 2000 · Penalty $500
Active - Non-hazardous
Failure to maintain bulding(a)leaking pipe drains from 2nd fl.bath rm rear causes severe water leak on to rear of 1st fl.store where 2 buckets are placed to catch this drainage.(b)th area of lekage of ceiling
Nov 30, 2000 · Penalty $350
Active - Non-hazardous
Illegal use in residential district r-4 in that 6 unregistered cars are being stored on side of lot adjacent to garage. remedy: remove illegal cars.
Sep 28, 1998 · Penalty $2,500
Resolve
Complaints
- General
Signage missing
May 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Dec 26, 2019 · Apt 2
Close - Unsanitary condition
Pests
Dec 9, 2019 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
Jul 27, 2018 · Apt BLDG
Close - Unsanitary condition
Pests
May 24, 2018 · Apt PH
Close - Unsanitary condition
Pests
May 24, 2018 · Apt PH
Close - Water leak
Heavy flow
May 24, 2018 · Apt PH
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jan 21, 2017 · Apt 3R
Close - Plumbing
Radiator
Jan 21, 2017 · Apt 3R
Close - Paint/plaster
Ceiling
Jan 21, 2017 · Apt 3R
Close - Water leak
Heavy flow
Jan 21, 2017 · Apt 2MID
Close - Unsanitary condition
Pests
Aug 23, 2016 · Apt BLDG
Close - Unsanitary condition
Mold
Aug 23, 2016 · Apt BLDG
Close - Plumbing
Water supply
Oct 12, 2015 · Apt 2FLMID
Close - Unsanitary condition
Pests
Sep 18, 2015 · Apt 2R
Close - Door/window
Window frame
Sep 18, 2015 · Apt 2R
Close - Paint/plaster
Ceiling
Sep 18, 2015 · Apt 4L
Close - Unsanitary condition
Pests
Feb 6, 2015 · Apt 1R
Close - Unsanitary condition
Pests
Feb 6, 2015 · Apt 1R
Close - Plumbing
Radiator
Feb 6, 2015 · Apt 4L
Close - Door/window
Window pane
Feb 6, 2015 · Apt 4L
Close - Plumbing
Radiator
Feb 6, 2015 · Apt 4R
Close - Safety
Fire escape
Feb 6, 2015 · Apt 1R
Close - Paint/plaster
Wall
Feb 6, 2015 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
Dec 23, 2014 · Apt BLDG
Close - Flooring/stairs
Floor
Oct 30, 2014 · Apt 4L
Close - Outside building
Roofing
Oct 30, 2014 · Apt 4L
Close - Electric
No lighting
Oct 30, 2014 · Apt 4L
Close - Electric
Lighting
Oct 30, 2014 · Apt 4L
Close - Door/window
Door frame
Oct 30, 2014 · Apt 4L
Close - Unsanitary condition
Pests
Oct 30, 2014 · Apt 4L
Close - Unsanitary condition
Pests
Oct 30, 2014 · Apt 4L
Close - Flooring/stairs
Floor
Oct 30, 2014 · Apt 4L
Close - Paint/plaster
Ceiling
Oct 30, 2014 · Apt 4L
Close - Paint/plaster
Wall
Oct 30, 2014 · Apt 4L
Close - Door/window
Window frame
Oct 30, 2014 · Apt 4L
Close - Appliance
Electric/gas range
Oct 30, 2014 · Apt 4L
Close - Paint/plaster
Ceiling
Oct 30, 2014 · Apt 4L
Close - Paint/plaster
Wall
Oct 30, 2014 · Apt 4L
Close - Unsanitary condition
Pests
Oct 30, 2014 · Apt 4L
Close - Door/window
Door frame
Oct 30, 2014 · Apt 4L
Close - Paint/plaster
Wall
Oct 30, 2014 · Apt 1L
Close - Paint/plaster
Ceiling
Oct 30, 2014 · Apt 1L
Close - Plumbing
Bathtub/shower
Oct 30, 2014 · Apt 1L
Close - Plumbing
Basin/sink
Oct 30, 2014 · Apt 1L
Close - Appliance
Electric/gas range
Oct 30, 2014 · Apt 1R
Close - Safety
Smoke detector
Oct 30, 2014 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1931
- Floors
- 3
- Residential units
- 8
- Building area
- 6,560 ft²
- Lot area
- 4,150 ft²
- Zoning
- R3X
- Community board
- 501
- Council district
- 49
- Block / lot
- 52 / 76
- Assessed value
- $350,100
- Landmark / historic district
- No
HPD registration #500198, last renewed Sep 17, 2025.
Questions about 506 Richmond Terrace
Who owns 506 Richmond Terrace?
The owner of record in NYC Department of City Planning PLUTO data is Four Properties Corp..
Does 506 Richmond Terrace have violations?
Yes. NYC HPD has recorded 102 housing violations at this property.
Is 506 Richmond Terrace rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 506 Richmond Terrace built?
City records list 1931 as the year it was built.
How many apartments are in 506 Richmond Terrace?
It has 8 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.