55 Layton Avenue
Staten Island, NY 10301BBL 5-00049-0182Map
Owner of record: NYC Department Of Education
55 Layton Avenue is a school building built in 1965 in Staten Island, 10301. The owner of record is NYC Department Of Education. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 16
- ECB violations
- 38
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 16
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Oct 10, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed
Show 6 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 38
- Class - 2
Re-issue #35692182h. failure to maintain building in code-compliant manner. noted: the 2 doors leading to the cafeteria from the main entry and the exit door at exit #7 are not operating correctly. remedy: repa
Feb 12, 2026 · Penalty $3,125
Active - Class - 2
Re-issue #35692181x. failure to maintain buildings in code-compliant manner. noted: rotted trees at rear neighboring property, exposure 3 have fallen and damaged schools fence. remedy: repair/replace fence.
Feb 12, 2026 · Penalty $3,125
Active - Class - 2
Re-issue #35692180y. failure to maintain building in code-compliant manner. illumination for exits, exit discharges and public corridors perbc 1006.1; 27-381. at t. o. i. there were several emergency lights tha
Feb 12, 2026 · Penalty $3,125
Active - Class - 2
Re-issue #35678830x. failure to maintain building in code-compliant manner: illumination for exits, exit discharges and public corridors perbc 1006.1; 27-381. at time of inspection observed several emergency li
Feb 24, 2025 · Penalty $3,125
Active - Class - 2
Failure to maintain buildings in code-compliant manner. noted at t. o.i. obsersed, a large dry rotted tree at neighbors property at exposure3 has fallen and caused severe damaged to the schools fence adjacenet
Feb 24, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code-compliant manner. noted: at t. o.i. there are 2 doors not closing properly. one the entry to cafeteria door off main school entry, and the exit door at exit 7, stair b. both
Feb 24, 2025 · Penalty $1,250
Active - Class - 2
Reissue#35672811n failure to maintain building in code-compliant manner:illumination for exits,exit discharges and public corridors per bc 1006.1;27-381.noted:at t.o.i.there were several emergency lights throug
Jun 27, 2024 · Penalty $1,562
Active - Class - 2
Failure to maintain building in code compliant manner:illumination forexits,exit discharges and public corridors per bc 1006.1;27-381.several emergency lites throughout the building wore not operational when te
May 9, 2023 · Penalty $625
Active - Class - 2
Failure to maintain bldg in codecompliant manner:observed atoi there are several classrm doors&other doors thatre covered or decorated w/combustible materials.this causes fire hazard&negates firerating of doors
May 4, 2022 · Penalty $625
Resolve - Class - 2
Re-issue ecb# 35093419m plexi glass vision panels.2 main entry doors on layton ave side,have plexi glass vision panels instead of wire glass vision panels.rem:install glass wired vision panels.
Feb 11, 2015
Resolve
Show 28 more ↓
- Class - 2
Illegal door hardware.@ rear of exit of library,a turn latch(dark)bolt installed.rem:remove and replace with correct door hardware.
Feb 11, 2015
Resolve - Class - 2
Re-issue ecb.350934205 blocked exit door.@ 2nd fl.library,2nd means of egress,door @ rear of library,blocked by rolling panel door + 1 self locking steel door.rem:remove obstructions of exit door.
Feb 11, 2015
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner: interior. at 2nd floor library, second means of egress blocked by 1 rolling panel door & 1 self locking steel door. second means of egress of library located
Mar 21, 2014
Resolve - Class - 2
Re-issue # 35018259m.miscellaneous violations: interior. at main entr y doors on 1st floor, exit doors have plexi-glass vision panels instead of the wired glass vision panels. remedy: replace plexi-glass vision
Mar 21, 2014
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner: use of prohibited door &/or hardware per bc 1008.1.8; 27-371(j). at 2nd floor library, rear steel door has self locking mechanism which requires a key to open
Mar 21, 2014
Resolve - Class - 2
Auditorium exit f used for storage of rolling cart & school furniture.remedy: provide proper corridor width.
May 15, 2013
Resolve - Class - 2
Sec. 27-371(b) main entry doors at layton ave have plexi vision panelsinstalled in lieu of wire glass. remedy: use code compliant hardware.
May 15, 2013
Resolve - Class - 2
Bulkhead door above auditorium has slide bolt in (lieu) of hook & eye per bc 1008.1.8. remedy: use code compliant hardware.
May 15, 2013
Resolve - Class - 2
F.p.s.c. doors defective,racked,defective close at 1st fl stair a & c. remedy: maintain bldg.
May 15, 2013
Resolve - Class - 2
Roof leak. at auditorium ceiling, the roof has become porous allowing rain water to enter the auditorium. remedy: water proof roof.
Jul 24, 2012
Resolve - Class - 2
At various sections throughout exterior facade has become porous. water penetration into cafeteria. active water leak present. remedy: restore weather proof integrity at exterior facade where needed.
Feb 17, 2011
Resolve - Class - 2
Failure to provide a fai in gas meter room @ the cellar level. remedy:provide fresh air intake (ventilation) as required.
Feb 17, 2011
Resolve - Class - 2
@ gas meter room; no fire stopping @ pipe penetrations. school i.d r-031. prior nov 34792919p issued 6/18/2009. remedy: provide fire stopping.
Jan 14, 2010
Resolve - Class - 2
@ gas meter room; required fresh air. vent not provided. school id= r031. prior nov 34792918n, issued 06/18. remedy: provide required fresh air vent.
Jan 14, 2010
Resolve - Class - 2
Roof leaking @ centre of auditorium ceiling. remedy: repair roof.
Jun 18, 2009
Resolve - Class - 2
Loose/missing/peeling plaster @ ceiling. location: auditorium. remedy:scrape & repair plaster.
Jun 18, 2009
Resolve - Class - 2
Required vent not present/location: gas meter room. remedy: install fresh air ventilation.
Jun 18, 2009
Resolve - Class - 2
No fire stopping @ pipe penetrations. location: gas meter room. remedyprovide & maintain fire stopping.
Jun 18, 2009
Resolve - Non-hazardous
Failure to maintain building defects noted at boiler room sump pump pit frame & cover of steel potted & rusted also condensate pipe steel cover rotted also went to sump pit.remedy:repair defect.
Jan 7, 2004
Resolve - Non-hazardous
* re - issue * failure to maintain. noted : concrete is cracked - pieces broken off and steel " tread caps" are loose on stairs outside exit #8 remedy : repair steps
Jan 22, 2002
Resolve - Non-hazardous
Failure to provide emergency light fixture within crridor, all stair and vestibule on foor 1 to 3. failure to provide emergency power to light fixture within all stair, corridor and vestibule on floor 1 to 3.fa
Jun 21, 2001
Resolve - Non-hazardous
Failure to maintain. defect is: at the south west corner of the school, the stairs leading down, have concrete that is cracked and spalling remedy: maintain bldg; make all necessary repairs forth with
Apr 18, 2001
Resolve - Non-hazardous
Failure to maintain. defect is : the chmney has cracked, loose and missing motor joints remedy: maintain bldg, make all necessary repairs forth with
Apr 18, 2001
Resolve - Non-hazardous
Failure to maintain. defect is : there is ground water leaking into the bolier room and the oil storage rooms. remedy: maintian bldg, make all necessary repair forth with
Apr 18, 2001
Resolve - Non-hazardous
Failure to maintain. defect is: the ausitorium ceiling, has peeling paint and spailing remedy: maintain bldg, make all necessary repairs forth with
Apr 18, 2001
Resolve - Non-hazardous
Failure to maintain defect is:the bluestone paving stones at the main entry are cracked and uneven.the gate to the perimeter fence is missingat the north west corner.the chimney has cracked brick and mortor joi
May 31, 2000
Resolve - Non-hazardous
Failure to maintain.defect is:there is ground water leaking into the boiler and oil storage rooms.the ntire gymnasium ceiling has peeling paint.rem:maintain bldg,make all necessary repairs forthwith
May 31, 2000
Resolve - Non-hazardous
Failure to maintain. defect is. at main entrance uneven broken concrete slaps causes trip hazard. near entrance, chain link fence leaning out of plumb, also rusted. fininsh floor at auditorium is lifting in sev
Jun 8, 1999
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 1965
- Floors
- 3
- Residential units
- —
- Building area
- 294,125 ft²
- Lot area
- 105,907 ft²
- Zoning
- R3A
- Community board
- 501
- Council district
- 49
- Block / lot
- 49 / 182
- Assessed value
- $21,575,700
- Landmark / historic district
- No
Questions about 55 Layton Avenue
Who owns 55 Layton Avenue?
The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Education.
Does 55 Layton Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 55 Layton Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 55 Layton Avenue built?
City records list 1965 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.