roofy

78 Layton Avenue

Staten Island, NY 10301BBL 5-00046-0016Map

Owner of record: Cheng, Fong Wa

78 Layton Avenue is a two-family home built in 1905 in Staten Island, 10301. It has 2 residential units across 2.75 floors. The owner of record is Cheng, Fong Wa. HPD has recorded 42 housing violations here, most recently on December 2, 2016. 31 of the 42 most recent violations are still open.

HPD violations
42
DOB violations
2
ECB violations
3
HPD complaints
58

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Dec 2, 2016

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 42

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 2, 2016

    Closed — Violation closed
  • C

    § 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1fl, 1st story

    Nov 28, 2016 · Apt 1FL

    Closed — Violation dismissed
  • A

    Provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Nov 17, 2016

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east yard

    Nov 17, 2016

    Open — Nov sent out
  • C

    Properly repair the broken or defective locking-device at entrance door to building , 1st story

    Nov 17, 2016

    Open — Nov sent out
  • C

    Properly repair the broken or defective locking-device at entrance door to building , 1st story

    Oct 4, 2016

    Open — Nov sent out
  • C

    Provide temporary seal-up of all accessible openings in the entire apartment located at cellar apt cellar

    Mar 22, 2016 · Apt CELLAR

    Closed — Violation closed
  • B

    Repair the broken or defective connection the wasteline under washbasin in the bathroom located at apt 2, 2nd story

    Mar 15, 2016 · Apt 2

    Open — Nov sent out
  • B

    Properly repair the broken or defective inner wood frame and moulding at front eantrance door located at apt 2, 2nd story

    Mar 15, 2016 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 2, 2nd story

    Mar 15, 2016 · Apt 2

    Open — Nov sent out
Show 32 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 2nd room from north at east located at apt 2, 2nd story

    Mar 15, 2016 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles floor in the kitchen located at apt 2, 2nd story

    Mar 15, 2016 · Apt 2

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2, 2nd story

    Mar 15, 2016 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles floor in the bathroom located at apt 2, 2nd story

    Mar 15, 2016 · Apt 2

    Open — Nov sent out
  • B

    Replace with new the broken or defective base-cabinet at washbasin in the bathroom located at apt 2, 2nd story

    Mar 15, 2016 · Apt 2

    Open — Nov sent out
  • B

    Replace the broken or defective washbasin in the bathroom located at apt 2, 2nd story

    Mar 15, 2016 · Apt 2

    Open — Nov sent out
  • I

    The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for illegal apartment created in the attic , 3rd story

    Jan 25, 2016

    Open — Info nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story

    Jan 15, 2016 · Apt 2FL

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2fl, 2nd story

    Jan 15, 2016 · Apt 2FL

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures gas-range in the kitchen located at apt 2fl, 2nd story

    Jan 15, 2016 · Apt 2FL

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). '' missing '' in the entire apartment located at apt 2fl, 2nd story

    Jan 15, 2016 · Apt 2FL

    Open — Nov sent out
  • B

    Replace with new the missing cover-plate at light switch at west wall in the kitchen located at apt 1flr, 1st story

    Jan 11, 2016 · Apt 1FLR

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the private hallway located at apt 1flr, 1st story

    Jan 11, 2016 · Apt 1FLR

    Open — Nov sent out
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... present at ceiling ( approx- 10 sq,ft ) in the bathroom located at apt 1flr, 1st story

    Jan 11, 2016 · Apt 1FLR

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and walls in the bathroom located at apt 1flr, 1st story

    Jan 11, 2016 · Apt 1FLR

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1flr, 1st story

    Jan 11, 2016 · Apt 1FLR

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1flr, 1st story

    Jan 11, 2016 · Apt 1FLR

    Closed — Violation closed
  • C

    Provide adequate supply of hot water for the fixtures ...''no volume''... in the entire apartment located at apt 1flr, 1st story

    Jan 11, 2016 · Apt 1FLR

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1flr, 1st story

    Jan 11, 2016 · Apt 1FLR

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures gas-range in the kitchen located at apt 1flr, 1st story

    Jan 11, 2016 · Apt 1FLR

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story

    Dec 24, 2015 · Apt 1

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... present at ceiling ( approx- 6 sq,ft ) in the bathroom located at apt 1, 1st story

    Dec 24, 2015 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and north wall in the bathroom located at apt 1, 1st story

    Dec 24, 2015 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story

    Dec 24, 2015 · Apt 1

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). '' missing '' in the entire apartment located at apt 1, 1st story

    Dec 24, 2015 · Apt 1

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures gas-range in the kitchen located at apt 1, 1st story

    Dec 24, 2015 · Apt 1

    Open — Nov sent out
  • B

    Abate the nuisance consisting of illegal plumbing fixtures installed in the attic, the water-closet, washbasin, bathtub and kitchen sink

    Dec 18, 2015

    Open — Nov sent out
  • B

    Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible electric range installed in the attic

    Dec 18, 2015

    Open — Nov sent out
  • B

    Abate the nuisance consisting of illegal class ''a'' apartment created in the attic

    Dec 18, 2015

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective 1st, 2nd and 3rd concrete treads from bottom at stairs at front entrance of building

    Dec 18, 2015

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story

    Feb 1, 2012 · Apt 2

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2, 2nd story

    Feb 1, 2012 · Apt 2

    Open — Nov sent out

DOB building violations · 2

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 27, 2016

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 5, 2016

    Dob violation - dismissed

ECB violations · 3

  • Class - 1

    Occupancy contrary to that allowed by cofo and dept of bldgs records. partitions erected creating illegal use of rooms for living in attic. full kitchen completed with electric cooking range and kitchen sink. a

    Dec 18, 2015 · Penalty $2,400

    Resolve
  • Class - 2

    Residence altered for occupancy as dwelling by more than the approved # of families bldg notive 232/45 lists occupancy as 2 fam dwelling noted 1st & 2nd arranged as class a apts cellar & attic have been convert

    Jul 16, 2008 · Penalty $1,200

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by c of o and dob records. class a apt created at cellar partitions creating rooms thru/out kitchen and bthrm fixtures present. remedy: discontinue illegal use of amended c of

    Jun 30, 2008 · Penalty $800

    Resolve

Complaints

  • Flooring/stairs

    Floor

    Feb 15, 2022 · Apt 1B

    Close
  • Paint/plaster

    Wall

    Feb 15, 2022 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Feb 15, 2022 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    Feb 15, 2022 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Nov 21, 2016 · Apt 1FL

    Close
  • Door/window

    Door

    Sep 22, 2016 · Apt 2B

    Close
  • Door/window

    Door

    Sep 18, 2016 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Mar 23, 2016 · Apt 2

    Close
  • Door/window

    Door frame

    Mar 23, 2016 · Apt 2

    Close
  • Safety

    Window guard broken/missing

    Mar 23, 2016 · Apt 2

    Close
Show 40 more ↓
  • Safety

    Smoke detector

    Mar 23, 2016 · Apt 2

    Close
  • Safety

    Carbon monoxide detector

    Mar 23, 2016 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Mar 23, 2016 · Apt 2

    Close
  • Door/window

    Door

    Mar 9, 2016 · Apt 2B

    Close
  • Plumbing

    Basin/sink

    Mar 9, 2016 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Mar 9, 2016 · Apt 2B

    Close
  • Plumbing

    Basin/sink

    Mar 9, 2016 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2016 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2016 · Apt 2FLOOR

    Close
  • Heat/hot water

    Apartment only

    Jan 19, 2016 · Apt 2FL

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2016 · Apt 2NDFL

    Close
  • Plumbing

    Water supply

    Jan 14, 2016 · Apt 1FL

    Close
  • Plumbing

    Boiler

    Jan 14, 2016 · Apt 1FL

    Close
  • Water leak

    Heavy flow

    Jan 14, 2016 · Apt 1FL

    Close
  • Water leak

    Heavy flow

    Jan 14, 2016 · Apt 1FL

    Close
  • Heat/hot water

    Apartment only

    Jan 14, 2016 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Jan 14, 2016 · Apt 1FLR

    Close
  • General

    Cooking gas

    Jan 14, 2016 · Apt 1FL

    Close
  • Heat/hot water

    Apartment only

    Jan 13, 2016 · Apt 2FL

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2016 · Apt 1FL

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2016 · Apt 1FLR

    Close
  • General

    Cooking gas

    Jan 4, 2016 · Apt 1FLR

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2016 · Apt BLDG

    Close
  • General

    Cooking gas

    Dec 21, 2015 · Apt 2FL

    Close
  • Heat/hot water

    Apartment only

    Dec 21, 2015 · Apt 2FL

    Close
  • Electric

    Power outage

    Dec 17, 2015 · Apt 3

    Close
  • Heating

    Heat related

    Jan 29, 2012 · Apt 2

    Close
  • Plumbing

    Sewer

    Jan 29, 2012 · Apt 2

    Close
  • Heating

    Heat related

    Jan 29, 2012 · Apt 2

    Close
  • Plumbing

    Sewer

    Jan 26, 2012 · Apt TOP

    Close
  • Heating

    Heat related

    Jan 26, 2012 · Apt TOP

    Close
  • Electric

    Wiring

    Jun 28, 2008 · Apt BSMT

    Close
  • Plumbing

    Sewer

    Jun 28, 2008 · Apt BSMT

    Close
  • Paint/plaster

    Ceiling

    Jun 28, 2008 · Apt BSMT

    Close
  • Nonconst

    Vermin

    Jun 28, 2008 · Apt BSMT

    Close
  • Nonconst

    Vermin

    Jun 28, 2008 · Apt BSMT

    Close
  • Nonconst

    Vermin

    Jun 28, 2008 · Apt BSMT

    Close
  • General

    Floor

    Jun 23, 2008 · Apt BSMT

    Close
  • General

    Floor

    Jun 23, 2008 · Apt BSMT

    Close
  • General

    Floor

    Jun 23, 2008 · Apt BSMT

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B2)
Year built
1905
Floors
2.75
Residential units
2
Building area
2,299 ft²
Lot area
5,000 ft²
Zoning
R3A
Community board
501
Council district
49
Block / lot
46 / 16
Assessed value
$40,260
Landmark / historic district
No

Questions about 78 Layton Avenue

Who owns 78 Layton Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Cheng, Fong Wa.

Does 78 Layton Avenue have violations?

Yes. NYC HPD has recorded 42 housing violations at this property.

Is 78 Layton Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 78 Layton Avenue built?

City records list 1905 as the year it was built.

How many apartments are in 78 Layton Avenue?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.