roofy

156 Hendricks Avenue

Staten Island, NY 10301BBL 5-00044-0011Map

Owner of record: 156 Hendricks LLC

156 Hendricks Avenue is a walk-up apartment building built in 2008 in Staten Island, 10301. It has 3 residential units across 3 floors. The owner of record is 156 Hendricks LLC. HPD has recorded 162 housing violations here, most recently on October 12, 2026. 50 of the 50 most recent violations are still open.

HPD violations
162
DOB violations
1
ECB violations
2
HPD complaints
81

What to know

Concern
13 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 12, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 162

  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 3, 2nd story, 2nd apartment from east at south

    Oct 12, 2026 · Apt 3

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling in the private hallway located at apt 3, 2nd story, 2nd apartment from east at south

    Oct 12, 2026 · Apt 3

    Open — Nov sent out
  • C

    Trace and repair the source and abate the visible mold condition... more than 30 sq ft observed at west wall in the 6th room from north located at bsmt-apt 1, 1st bsmt-apt from north at east

    Oct 12, 2026 · Apt 1

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective vinyl floor in the private hallway located at bsmt-apt 1, 1st bsmt-apt from north at east

    Oct 12, 2026 · Apt 1

    Open — Nov sent out
  • C

    Properly secure the loose washbasin in the bathroom located at bsmt-apt 1, 1st bsmt-apt from north at east

    Oct 12, 2026 · Apt 1

    Open — Nov sent out
  • B

    Replace the broken or defective washbasin in the bathroom located at bsmt-apt 1, 1st bsmt-apt from north at east

    Oct 12, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective grout around bathtub in the bathroom located at bsmt-apt 1, 1st bsmt-apt from north at east

    Oct 12, 2026 · Apt 1

    Open — Nov sent out
  • B

    Replace the broken or defective bathtub in the bathroom located at bsmt-apt 1, 1st bsmt-apt from north at east

    Oct 12, 2026 · Apt 1

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at bsmt-apt 1, 1st bsmt-apt from north at east

    Oct 12, 2026 · Apt 1

    Open — Nov sent out
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at bsmt-apt 1, 1st bsmt-apt from north at east

    Oct 12, 2026 · Apt 1

    Open — Nov sent out
Show 40 more ↓
  • C

    Trace and repair the source and abate the visible mold condition... more than 30 sq ft observed at ceiling and south wall in the bathroom located at bsmt-apt 1, 1st bsmt-apt from north at east

    Oct 12, 2026 · Apt 1

    Open — Notice of issuance sent to tenant
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 5 in the entire apartment located at bsmt-apt 1, 1st bsmt-apt from north at east

    Oct 12, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor in the foyer located at bsmt-apt 1, 1st bsmt-apt from north at east

    Oct 12, 2026 · Apt 1

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at bsmt-apt 1, 1st bsmt-apt from north at east

    Oct 12, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood door frame in the entrance located at bsmt-apt 1, 1st bsmt-apt from north at east

    Oct 12, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor in the foyer located at apt 2, 1st story, 1st apartment from east at south

    Oct 12, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor in the private hallway located at apt 2, 1st story, 1st apartment from east at south

    Oct 12, 2026 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 2, 1st story, 1st apartment from east at south

    Oct 12, 2026 · Apt 2

    Open — Nov sent out
  • C

    Trace and repair the source and abate the visible mold condition... more than 30 sq ft observed at north wall in the 5th room from north located at apt 2, 1st story, 1st apartment from east at south

    Oct 12, 2026 · Apt 2

    Open — Notice of issuance sent to tenant
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 sq ft observed at ceiling in the kitchen located at apt 2, 1st story, 1st apartment from east at south

    Oct 12, 2026 · Apt 2

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective formica countertop in the kitchen located at apt 2, 1st story, 1st apartment from east at south

    Oct 12, 2026 · Apt 2

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets sink in the kitchen located at apt 2, 1st story, 1st apartment from east at south

    Oct 12, 2026 · Apt 2

    Open — Nov sent out
  • B

    Abate the nuisance consisting of pests. evidence of gnats in the entire apartment located at apt 2, 1st story, 1st apartment from east at south

    Oct 12, 2026 · Apt 2

    Open — Nov sent out
  • B

    Abate the nuisance consisting of pests. evidence of ants in the entire apartment located at apt 2, 1st story, 1st apartment from east at south

    Oct 12, 2026 · Apt 2

    Open — Nov sent out
  • B

    Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 2, 1st story, 1st apartment from east at south

    Oct 12, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective grout around bathtub in the bathroom located at apt 2, 1st story, 1st apartment from east at south

    Oct 12, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective reglaze enamel porcelain at bathtub in the bathroom located at apt 2, 1st story, 1st apartment from east at south

    Oct 12, 2026 · Apt 2

    Open — Nov sent out
  • C

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2, 1st story, 1st apartment from east at south

    Oct 12, 2026 · Apt 2

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the bathroom located at apt 2, 1st story, 1st apartment from east at south

    Oct 12, 2026 · Apt 2

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Oct 12, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at basement level at public hall

    Oct 12, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Oct 12, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Oct 12, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at basement level at public hall

    Oct 12, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household storage at basement level at public hall

    Oct 12, 2026

    Open — Nov sent out
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at south door at basement level at building front

    Oct 12, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at south door at basement level at building front

    Oct 12, 2026

    Open — Nov sent out
  • B

    Properly repair the broken or defective paving at building front

    Oct 12, 2026

    Open — Nov sent out
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at south yard

    Oct 12, 2026

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard

    Oct 12, 2026

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the west yard

    Oct 12, 2026

    Open — Nov sent out
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east yard

    Oct 12, 2026

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over the ceiling in the bathroom located at apt 3, 2nd story, 2nd apartment from east at south

    Oct 12, 2026 · Apt 3

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical light fixture at ceiling in the bathroom located at apt 3, 2nd story, 2nd apartment from east at south

    Oct 12, 2026 · Apt 3

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3, 2nd story, 2nd apartment from east at south

    Oct 12, 2026 · Apt 3

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective grout around bathtub in the bathroom located at apt 3, 2nd story, 2nd apartment from east at south

    Oct 12, 2026 · Apt 3

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor in the 1st room from north located at apt 3, 2nd story, 2nd apartment from east at south

    Oct 12, 2026 · Apt 3

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor in the kitchen located at apt 3, 2nd story, 2nd apartment from east at south

    Oct 12, 2026 · Apt 3

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective reglaze enamel porcelain at bathtub in the bathroom located at apt 3, 2nd story, 2nd apartment from east at south

    Oct 12, 2026 · Apt 3

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 3, 2nd story, 2nd apartment from east at south

    Oct 12, 2026 · Apt 3

    Open — Nov sent out

DOB building violations · 1

  • Construction other optional

    C-construction other optional

    Apr 9, 2008

    Dob violation - dismissed

ECB violations · 2

  • Class - 3

    Violation of parking regs in a residential district rs in that their is 2 vehicles being stored in driveway w.o license plates dead storage is not permitted in a residential district.rem:conform to parking regs

    Oct 17, 2016 · Penalty $500

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner.at the time of my inspection 10:35am on 10-12-16 at above address i observed in cellar/basement 3 water heaters and 3 boilers not on and working due to gas

    Oct 12, 2016

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Oct 8, 2026 · Apt 3

    Close
  • Plumbing

    Radiator

    Oct 8, 2026 · Apt 3

    Close
  • Appliance

    Refrigerator

    Oct 8, 2026 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Oct 8, 2026 · Apt 3

    Close
  • Plumbing

    Basin/sink

    Jul 24, 2025 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Jul 24, 2025 · Apt 3

    Close
  • Plumbing

    Toilet

    Jul 24, 2025 · Apt 3

    Close
  • Appliance

    Refrigerator

    Jul 24, 2025 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Jul 24, 2025 · Apt 3

    Close
  • Electric

    Wiring

    Jul 24, 2025 · Apt 3

    Close
Show 40 more ↓
  • Electric

    Lighting

    Jul 24, 2025 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Jul 3, 2024 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    May 22, 2024 · Apt 1

    Close
  • Water leak

    Slow leak

    May 22, 2024 · Apt 1

    Close
  • Electric

    Outlet/switch

    May 22, 2024 · Apt 1

    Close
  • Unsanitary condition

    Mold

    May 22, 2024 · Apt 1

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 17, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jun 13, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jun 1, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 31, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 30, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 30, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 29, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 29, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 29, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 27, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 27, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 26, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 26, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 24, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 22, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 21, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 21, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 21, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 21, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 21, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 19, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 14, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 12, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 12, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 11, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 10, 2017 · Apt 2

    Close
  • Heat/hot water

    Entire building

    May 9, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    May 8, 2017 · Apt 2

    Close
  • Heat/hot water

    Entire building

    May 5, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    May 5, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 5, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 5, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 5, 2017 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 5, 2017 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
2008
Floors
3
Residential units
3
Building area
2,160 ft²
Lot area
2,500 ft²
Zoning
R5
Community board
501
Council district
49
Block / lot
44 / 11
Assessed value
$46,020
Landmark / historic district
No

HPD registration #501418, last renewed Jul 23, 2024.

Questions about 156 Hendricks Avenue

Who owns 156 Hendricks Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 156 Hendricks LLC.

Does 156 Hendricks Avenue have violations?

Yes. NYC HPD has recorded 162 housing violations at this property.

Is 156 Hendricks Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 156 Hendricks Avenue built?

City records list 2008 as the year it was built.

How many apartments are in 156 Hendricks Avenue?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.