67 Brook Street
Staten Island, NY 10301BBL 5-00035-0088Map
Owner of record: Hao Yun Dichan NY LLC
67 Brook Street is a two-family home built in 1935 in Staten Island, 10301. It has 2 residential units across 3 floors. The owner of record is Hao Yun Dichan NY LLC. HPD has recorded 51 housing violations here, most recently on February 6, 2018. 46 of the 50 most recent violations are still open.
- HPD violations
- 51
- DOB violations
- 4
- ECB violations
- 29
- HPD complaints
- 162
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 51
- CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2, 3rd story, 1st apartment from east at south
Feb 6, 2018 · Apt 2
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jun 15, 2017
Open — Info nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east yard
Jun 13, 2017
Open — Nov sent out - ANon-hazardous
Provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jun 13, 2017
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective drawers at base-cabinets in the kitchen located at apt 1, 2nd story
Jun 13, 2017 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles floor in the kitchen located at apt 1, 2nd story
Jun 13, 2017 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 2nd story, section ''#67''
Jun 13, 2017 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas-range in the kitchen located at apt 1, 2nd story
Jun 13, 2017 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1, 1st story
Nov 29, 2016 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at kitchen and bathroom in the entire apartment located at apt 1, 1st story
Apr 3, 2016 · Apt 1
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide adequate supply of hot water for the fixtures at kitchen in the entire apartment located at apt 1, 1st story
Apr 3, 2016 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures .. in the entire apartment located at apt 2, 2nd story
Mar 16, 2016 · Apt 2
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet toilet-bowl in the bathroom located at apt 1, 1st story, section ''side-ent''
Nov 12, 2015 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling and east wall in the kitchen located at apt 1, 1st story, section ''side-ent''
Nov 12, 2015 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 1, 1st story, section ''side-ent''
Nov 12, 2015 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective locking-vice at lower sash north window in the bathroom located at apt 2ndflr, 2nd story, section ''rear-ent''
May 7, 2015 · Apt 2NDFLR
Open — Nov sent out - BHazardous
Properly repair the broken or defective bottom sash window in the bathroom located at apt 2fl, 2nd story
Apr 29, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Repair or replace smoke detector .. in the entire apartment located at apt 2fl, 2nd story
Apr 29, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story
Apr 29, 2015 · Apt 2FL
Open — Nov sent out - ANon-hazardous
Replace with new the missing door bell in the entrance located at apt 2fl, 2nd story
Apr 29, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2fl, 2nd story
Apr 29, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective window lock in the 2nd room from east located at apt 2fl, 2nd story
Apr 29, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective locking-device at lower sash north window in the bathroom located at apt 2, 2nd story, section ''rear-ent''
Aug 7, 2014 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective door-bell located at apt 2, 2nd story, section ''rear-ent''
Aug 7, 2014 · Apt 2
Open — Nov sent out - ANon-hazardous
Provide a peep hole in entrance door of the dwelling unit so located as to permit a person inside the dwelling unit to view any person outside entrance door ...at rear located at apt 2, 2nd story
Aug 7, 2014 · Apt 2
Open — Nov sent out - BHazardous
Provide adequate lighting for west in the terrace located at apt 2fl, 2nd story
Jun 6, 2014 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective bottom sash window in the bathroom located at apt 2fl, 2nd story
Jun 6, 2014 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective window lock in the 1st room from east located at apt 2fl, 2nd story
Jun 6, 2014 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective top sash window glass in the 1st room from east located at apt 2fl, 2nd story
Jun 6, 2014 · Apt 2FL
Closed — Violation closed - BHazardous
Replace with new the missing door bell in the entrance located at apt 2fl, 2nd story
Jun 6, 2014 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective window lock in the 2nd room from east located at apt 2fl, 2nd story
Jun 6, 2014 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Replace with new the missing balusters at open space from 2 sty to 3 sty. stairs at rear - yard total 8
Mar 20, 2013
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls in the private hallway located at apt 69a, 2nd story
Mar 1, 2007 · Apt 69A
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ( toilet ) in the bathroom located at apt 69a, 2nd story
Mar 1, 2007 · Apt 69A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color southwall in the bathroom located at apt 69a, 2nd story
Mar 1, 2007 · Apt 69A
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 69a, 2nd story
Mar 1, 2007 · Apt 69A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective 2nd and 3rd concrete tread from bottom stairs at side of building
Mar 1, 2007
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color northwall in the 1st room from east at south located at apt 69a, 2nd story
Dec 22, 2006 · Apt 69A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color northwall in the 2nd room from east at south located at apt 69a, 2nd story
Dec 22, 2006 · Apt 69A
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ( toilet ) in the bathroom located at apt 69a, 2nd story
Dec 22, 2006 · Apt 69A
Open — Nov sent out - BHazardous
Properly repair the broken or defective inoperative oven at gas-range in the kitchen located at apt 69a, 2nd story
Dec 22, 2006 · Apt 69A
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 69a, 2nd story
Dec 22, 2006 · Apt 69A
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 67b, 2nd story
Jan 19, 2006 · Apt 67B
Open — Nov sent out - BHazardous
Provide adequate lighting for rear entrance to building ( 60 watts minimum )
Jan 19, 2006
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color holes in walls at center room located at apt 67b, 2nd story
Jan 19, 2006 · Apt 67B
Open — Nov sent out - BHazardous
Replace with new the missing handrail at lower stairs at side entrance to building
Jan 19, 2006
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 67b, 2nd story
Jan 19, 2006 · Apt 67B
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key-operated lock installed at entrance door located at apt 67b, 2nd story
Jan 19, 2006 · Apt 67B
Open — Nov sent out - BHazardous
Properly repair the broken or defective inner and outer wood frames at entrance door located at apt 67b, 2nd story
Jan 19, 2006 · Apt 67B
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical wall outlet in the bathroom located at apt 67b, 2nd story
Jan 19, 2006 · Apt 67B
Open — Nov sent out
DOB building violations · 4
- Construction other optional
Ftm bldg.at bsmt of premises there is a single line of non engineered shoring in place.shoring doesnt have positive connection to joists or ground&lack of any cross bracing.remedy:owner engage nyspe eng'r eval bldg.obtain perm for repair/shoring no later 8/21/17.signed off repair/shoring jobs no later 9/11/17
Aug 1, 2017
Dob violation - active - Construction other optional
C-construction other optional
Jul 31, 2017
Dob violation - active - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Dec 6, 1999
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Apr 20, 1994
Dob violation - dismissed
ECB violations · 29
- Class - 2
Failure to maintain bldg walls or appurtenances in that exterior masonry stucco walls are cracked bulging & in disrepair. on right side of bldg a section of masonry stucco had fallen off of bldg. rem: maintain
Jul 31, 2017 · Penalty $250
Active - Class - 2
Occupancy contrary to that allowed by the bldg dept records. noted: bldg dept records indicates lno 1363 use as 1 store & 2 family dwelling.presently store is removed & studio apt created by kitchen w/gas stove
Nov 2, 2016 · Penalty $1,200
Active - Class - 2
Failure to maintain bldg in a code compliant manner noted loose and cracked brick work w/ missing mortar at lintle packets above windows at 2nd & 3rd floor on front facade rem: repair all defects
Nov 23, 2010 · Penalty $500
Resolve - Hazardous
Failure to maintain bldg noted bldg is vacant open and uguarded at 3rdfl rear entry door to apt on cls accessed thru sipe yard rear entry e ntry stair. remedy: seal all openings as per reference standard 3-01
Nov 26, 2007 · Penalty $2,500
Resolve - Hazardous
Failure to maintain bldg. boiler room is in severe disrepair - concrete wall removed. beams are cracked & water soaked from water lines. remedy: maintain boiler room. make all necessary repairs forthwith.
Oct 1, 2007 · Penalty $2,500
Resolve - Hazardous
Failure to maintain exterior bldg wall. note front exterior wall is bowed towards street at 1st & 2nd floors. facade is cracked & bulging. remedy: make all necessary repairs forthwith install sidewalk shed.
Oct 1, 2007 · Penalty $2,500
Resolve - Hazardous
Residence altered for more than the legally approved # of families. dob records state residence is legally approved for store & 2 families. residence has been altered for 6 families. note - 1st floor - store
Oct 1, 2007 · Penalty $20,500
Active - Hazardous
Failure to maintain bldg.noted:at north side of bldg door leading intoboiler rm open & unguarded.4 1/2 x 4 1/2 & 2 x 4 1/2 inadequately holding weight of 1st fl,fl joists.no cover on boiler & flame to boiler
Mar 8, 2007 · Penalty $2,500
Resolve - Hazardous
Occupancy contrary to that allowed by the dob records.noted:finance occupancy code indicate bldg to be a b1-(2)family dwelling,but now occu pied as(4)class"a"& (1)class"b"dwelling.eg:2class"a" @ 2nd flr
Feb 20, 2007 · Penalty $10,000
Active - Hazardous
Work w/o a permit hazardous!noted:interior partitions @ basement 1st &2nd flr creating 2 apts on 2nd flr w/3pc bath,kitchen w/gas piping & 2 apts on the 1st flr w/similar arrangements &(1)studio apt @ base
Feb 20, 2007 · Penalty $10,000
Active
Show 19 more ↓
- Hazardous
Failure to maintain.defect noted window lintels are severely deteriorated causing spalling bricks & masonry joints also stress cracks.remedymake all repairs.
Sep 20, 2006 · Penalty $10,000
Resolve - Non-hazardous
Occupancy contrary to that allowed by the building department records.noted:finance occupancy code indicate bldg to be a b1-2 family dwelling but now occupied as 4 class "a"& one class "b" dwelling.
Jul 20, 2006 · Penalty $800
Active - Hazardous
Work w/out a permit hazardous! noted:interior partitions at basement 1st & 2nd floor. creating 2 apts on 2nd flr.with 3pcs bath, kitchen w/gas piping,and 2 apts on the 1st flr. with simeler arangements.
Jul 20, 2006 · Penalty $800
Active - Non-hazardous
Failure to maintain.defect noted:window lintels are severly deteriorated at 2nd & 3rd fl causing cracked & spalling bricks & masonry joints.remedy:make all repairs.
Jul 12, 2006 · Penalty $800
Resolve - Hazardous
Failure to maintain: defect noted- 1) window lintels are severly deteriorated causing stress cracks at front of bldg; 2) also spalling brickand masonry joints. remedy: make all repairs.
May 9, 2006 · Penalty $800
Resolve - Non-hazardous
Work without a permit, work noted. at 2nd fl. rear of bldg a wood deckwas constructed apprx. 10 x 18ft. with stairs to side yd grade level. remedy: obtain a permit.
Feb 22, 2006 · Penalty $500
Resolve - Hazardous
Failure to maintain. defect noted (1) window lintels are severely deteriorated causing stress cracks at front of bldg; also spalling brick &masonry joints. remedy: make all repairs
Dec 30, 2005 · Penalty $2,000
Resolve - Hazardous
Failure to maintain: defect noted- 1) window lintels are severely deteriorated causing stress cracks at front of bldg. also spalling brick and masonry joints. remedy: make all repairs//make safe.
Aug 30, 2005 · Penalty $2,000
Resolve - Hazardous
20050817yor are severely deteriorated causing stress cracks at front of bldg; also spalling brick masonry joints. remedy: make all repairs//make safe
Apr 12, 2005 · Penalty $2,000
Resolve - Non-hazardous
Failure to comply with the commissioners order to correct the violating condition and file a certificate of correction with the nyc department of building for notice of violation #34429061r/ 062204c01fc04 remed
Feb 9, 2005 · Penalty $500
Active - Hazardous
Failure to maintain defect noted (1)steel lintels at 2nd & 3rd floor windows are deteriorated causing horizontal joints at front of bldg re medy:make all repairs /make safe
Nov 17, 2004 · Penalty $2,000
Resolve - Non-hazardous
Residence altered fo occupancy as a dwelling for more than the legallyapproved number of families nb# 2056/27 lists 1st fl as store & 2nd & 3rd as 1 family per floor presently 1st fl store converted to a class
Jun 22, 2004 · Penalty $3,050
Active - Non-hazardous
Work without a permit work noted @ 1st floor store as per nb# 5056/27 inidcates # 67 as 12ft 6'& 69 joined # 67 as store & 2 family # 69 as 2 family at 1st dividing partition removed from front to rear & instal
Jun 22, 2004 · Penalty $800
Active - Hazardous
Failure to maintain:defect noted.(1)steel lintels at 2nd and 3rd floors are deteriorated causing horizontal stress cracks,spalling brick and masonary joints at front of bldg.remedy:make all repairs/make safe
Jun 10, 2004 · Penalty $800
Resolve - Non-hazardous
Failure to maintain defect are no smoke detectors at apts 1st fl front of 2nd fl side remedy provide smoke detectors immediately
Dec 12, 2003 · Penalty $350
Resolve - Non-hazardous
Work w/o apermit work noted wood deck built at 3 fl rear 2 entrance door at 3rd fl rear lead to deck approx 20'l x15'w and wood stairway to ground at side of wood stairway to ground at side of bldg deck and st
Dec 12, 2003 · Penalty $500
Resolve - Hazardous
Work w/o a permit work noted interior partiton walls ceiling built with plumbing work including gas stoves at 1st fl front and 2 fl right side of bldg to make apartment dwelling contrary to dept records remedy
Dec 12, 2003 · Penalty $800
Active - Hazardous
Occupancy contrary to that allowed by bldg dept record nb 2056-27 allows full apartment 1 family 2,3fls noted full apartment dwelling at 1st fl front and 2nd fl rightside at 1st fl 1 large room with bedroom and
Dec 12, 2003 · Penalty $800
Active - Non-hazardous
Failure to maintain exterior building wall defect is front exterior wall is bowed toward street at first and second floor level also a large crack had started. on front exterior wall. rear portion of building r
Dec 2, 1999 · Penalty $2,500
Resolve
Complaints
- Electric
Power outage
Aug 10, 2018 · Apt 2
Close - Door/window
Door
Jul 16, 2018 · Apt 2
Close - Safety
Window guard broken/missing
Jul 16, 2018 · Apt 2
Close - Door/window
Door
Jul 16, 2018 · Apt 1
Close - Electric
Wiring
May 21, 2018 · Apt 1STFL
Close - Electric
Power outage
May 21, 2018 · Apt 1STFL
Close - Electric
Power outage
May 17, 2018 · Apt 1STFL
Close - Electric
Power outage
Mar 19, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2018 · Apt 2
Close - Electric
No lighting
Feb 2, 2018 · Apt 2
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 2, 2018 · Apt 2
Close - Electric
No lighting
Jan 10, 2018 · Apt 1
Close - Electric
No lighting
Jan 10, 2018 · Apt 1
Close - Electric
No lighting
Jan 10, 2018 · Apt 1
Close - Electric
No lighting
Jan 10, 2018 · Apt 1
Close - Safety
Window guard broken/missing
Aug 5, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 12, 2017 · Apt 2
Close - General
Cooking gas
Jun 12, 2017 · Apt 2
Close - Heat/hot water
Entire building
Jun 12, 2017 · Apt 1
Close - Safety
Window guard broken/missing
Oct 26, 2016 · Apt 1
Close - Unsanitary condition
Pests
Oct 26, 2016 · Apt 1
Close - Plumbing
Water supply
Apr 3, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 3, 2016 · Apt BLDG
Close - Plumbing
Water supply
Apr 3, 2016 · Apt BLDG
Close - Plumbing
Water supply
Apr 3, 2016 · Apt PH
Close - Plumbing
Water supply
Apr 2, 2016 · Apt 2
Close - Plumbing
Water supply
Apr 2, 2016 · Apt 1
Close - Electric
Power outage
Mar 11, 2016 · Apt 2
Close - Heat/hot water
Entire building
Jan 18, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 19, 2015 · Apt BLDG
Close - Plumbing
Toilet
Oct 30, 2015 · Apt 2
Close - Paint/plaster
Ceiling
Oct 30, 2015 · Apt 2
Close - Unsanitary condition
Pests
Oct 30, 2015 · Apt 1
Close - Door/window
Window pane
Oct 30, 2015 · Apt 1
Close - Heat/hot water
Entire building
Oct 26, 2015 · Apt 1STFL
Close - Door/window
Door
May 5, 2015 · Apt 2NDFLR
Close - Electric
No lighting
May 5, 2015 · Apt 2NDFLR
Close - Safety
Smoke detector
May 5, 2015 · Apt 2NDFLR
Close - General
Bell/buzzer/intercom
May 5, 2015 · Apt 2NDFLR
Close - Door/window
Window frame
May 5, 2015 · Apt 2NDFLR
Close - Door/window
Window frame
May 5, 2015 · Apt 2NDFLR
Close - Unsanitary condition
Pests
May 5, 2015 · Apt 2NDFLR
Close - Safety
Carbon monoxide detector
May 5, 2015 · Apt 2NDFLR
Close - Safety
Smoke detector
Apr 20, 2015 · Apt 2FL
Close - Safety
Carbon monoxide detector
Apr 20, 2015 · Apt 2FL
Close - Door/window
Door
Apr 20, 2015 · Apt 2FL
Close - Door/window
Window frame
Apr 20, 2015 · Apt 2FL
Close - Unsanitary condition
Pests
Apr 20, 2015 · Apt 2FL
Close - Door/window
Window frame
Apr 20, 2015 · Apt 2FL
Close - General
Bell/buzzer/intercom
Apr 20, 2015 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1935
- Floors
- 3
- Residential units
- 2
- Building area
- 2,636 ft²
- Lot area
- 2,500 ft²
- Zoning
- R3A
- Community board
- 501
- Council district
- 49
- Block / lot
- 35 / 88
- Assessed value
- $50,520
- Landmark / historic district
- No
Questions about 67 Brook Street
Who owns 67 Brook Street?
The owner of record in NYC Department of City Planning PLUTO data is Hao Yun Dichan NY LLC.
Does 67 Brook Street have violations?
Yes. NYC HPD has recorded 51 housing violations at this property.
Is 67 Brook Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 67 Brook Street built?
City records list 1935 as the year it was built.
How many apartments are in 67 Brook Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.