1 Rockaway Point Blvd

Queens, NY 11697BBL 4-16340-0050Map

Owner of record: Breezy Point Co-Op

1 Rockaway Point Blvd is an one-family home built in 1938 in Queens, 11697. It has 411 residential units across 1 floor. The owner of record is Breezy Point Co-Op. HPD has recorded 66 housing violations here, most recently on November 26, 2025. 50 of the 50 most recent violations are still open.

HPD violations
66
DOB violations
132
ECB violations
116
HPD complaints
288

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Nov 26, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 66

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 26, 2025

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 26, 2025

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 5, 2024

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 5, 2024

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 30, 2023

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 30, 2023

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 21, 2022

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 18, 2022

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 22, 2021

    Open — Info nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 11a, 1st story, 1st apartment from south at west

    Nov 17, 2019 · Apt 11A

    Open — Nov sent out
Show 40 more ↓
  • B

    Abate the infestation consisting of bedbugs in the entire apartment located at apt 11a, 1st story, 1st apartment from south at west

    Nov 17, 2019 · Apt 11A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and south wall in the private hallway located at apt 11a, 1st story, 1st apartment from south at west

    Nov 17, 2019 · Apt 11A

    Open — Nov sent out
  • B

    Properly repair the broken or defective spring balance at 1st window at east upper sash in the 1st room from north at east located at apt 11a, 1st story, 1st apartment from south at west

    Nov 17, 2019 · Apt 11A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the east wall in the 1st room from north at east located at apt 11a, 1st story, 1st apartment from south at west

    Nov 17, 2019 · Apt 11A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door at east in the 1st room from north at east located at apt 11a, 1st story, 1st apartment from south at west

    Nov 17, 2019 · Apt 11A

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 11a, 1st story, 1st apartment from south at west

    Nov 17, 2019 · Apt 11A

    Open — Nov sent out
  • B

    Properly repair the broken or defective base cabinet at wash basin, broken inner and outer surfaces in the bathroom located at apt 11a, 1st story, 1st apartment from south at west

    Nov 17, 2019 · Apt 11A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame at west in the 2nd room from north at west located at apt 11a, 1st story, 1st apartment from south at west

    Nov 17, 2019 · Apt 11A

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 8, 2019

    Open — Info nov sent out
  • B

    Remove all obstructions and repair all defects in sink in the kitchen located at apt 1b, 2nd story, section ''216-01b''

    May 17, 2019 · Apt 1B

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Jan 11, 2018

    Open — Info nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north at east located at apt 23b, 2nd story, apartment at east

    Jun 24, 2017 · Apt 23B

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling in the 1st room from north at east located at apt 23b, 2nd story, apartment at east

    Jun 24, 2017 · Apt 23B

    Open — Nov sent out
  • B

    Provide an adequate supply of gas to the fixtures gas range in the entire apartment located at apt 29b, 2nd story

    May 19, 2017 · Apt 29B

    Open — Nov sent out
  • B

    Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 23b, 2nd story

    May 19, 2017 · Apt 23B

    Open — Nov sent out
  • A

    Trace and repair the source and abate the nuisance consisting of mold ... at west window sill in the bathroom located at apt 23b, 2nd story, 1st apartment from west at north , section ''214-23b''

    Jul 23, 2016 · Apt 23B

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at north wall in the 1st room from north at west located at apt 23b, 2nd story, 1st apartment from west at north , section ''214-23b''

    Jul 23, 2016 · Apt 23B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the kitchen located at apt 1b, 2nd story, section ''bldg 01''

    Jun 19, 2015 · Apt 1B

    Open — Nov sent out
  • A

    Refit front door in the entrance located at apt 1b, 1st story, section ''bldg 01''

    Jun 19, 2015 · Apt 1B

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling in the entire apartment located at apt 45b, 2nd story, apartment at north

    Feb 12, 2015 · Apt 45B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the entire apartment located at apt 45b, 2nd story, apartment at north

    Feb 12, 2015 · Apt 45B

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 45b, 2nd story, apartment at north

    Feb 12, 2015 · Apt 45B

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the bathroom located at apt 23b, 2nd story

    Jun 24, 2014 · Apt 23B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the bathroom located at apt 23b, 2nd story

    Jun 24, 2014 · Apt 23B

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department walls, ceilings, and trim throughout in the entire apartment located at apt 23b, 2nd story

    Jun 24, 2014 · Apt 23B

    Open — Nov sent out
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... and mildew at west wall in the 1st room from north at west located at apt 23b, 2nd story

    Jun 24, 2014 · Apt 23B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling(aka214-31a hillside ave) in the bathroom located at apt 31a, 1st story

    Oct 20, 2010 · Apt 31A

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of concealed water leakceiling(214-31a hillside ave) in the kitchen located at apt 31a, 1st story

    Oct 20, 2010 · Apt 31A

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of concealed water leak at ceiling(aka214-31a hillside ave) in the bathroom located at apt 31a, 1st story

    Oct 20, 2010 · Apt 31A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling(aka 214-31ahillside ave) in the kitchen located at apt 31a, 1st story

    Oct 20, 2010 · Apt 31A

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 31a, 1st story

    Oct 20, 2010 · Apt 31A

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing(aka214-31a hillside ave) in the entire apartment located at apt 31a, 1st story

    Oct 20, 2010 · Apt 31A

    Open — Nov sent out
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 31a, 1st story

    Oct 20, 2010 · Apt 31A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceiling(214-31a) in the entire apartment located at apt 31a, 1st story

    Oct 20, 2010 · Apt 31A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective door jamb east side in the entrance located at apt a, 1st story

    Oct 9, 2009 · Apt A

    Open — Nov sent out
  • B

    Properly repair the broken or defective counter balance at lower window sahes throughout in the entire apartment located at apt a, 1st story

    Oct 9, 2009 · Apt A

    Open — Nov sent out
  • B

    Replace with new the missing cover at radiator in the kitchen located at apt a, 1st story

    Oct 9, 2009 · Apt A

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in wasteline at wash basin in the bathroom located at apt a, 1st story

    Oct 9, 2009 · Apt A

    Open — Nov sent out
  • B

    Properly repair the broken or defective ceiling light fixture in the private hallway located at apt 01s, 1st story, apartment at south

    Sep 18, 2007 · Apt 01S

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 01s, 1st story, apartment at south

    Sep 18, 2007 · Apt 01S

    Open — Nov sent out

DOB building violations · 132

  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Construction other optional

    Bc has issued swo for job #420651681 due to contractor withdrawal

    Jun 16, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 27, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 27, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 27, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 27, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 27, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 27, 2019

    Dob violation - resolved
Show 40 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 27, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 27, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 27, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 16, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 16, 2019

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator - failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Fully demolish the building,provide full time nys professional engineer on-site during the demolition operation

    Dec 19, 2018

    Dob violation - dismissed
  • Construction other optional

    Ftm:1sty+base det resid bldg on int lot adj bldg at 72 hillside ave was being lifted&cribbing coll resultwith adj2sty bldg leaning on 71 hillside ave on 12/12/18 cracks@north&south&east found wallsbldg racked east with cracks thru out int remedy:own retain nyspe eval ent bldg&sub rptby 1/21/19 repair or demo bldg under prmt wrk st 3/18/19

    Dec 17, 2018

    Dob violation - active
  • Construction other optional

    E/w 1story+b deta w/frm resi bldg.adj.bdlg collapse,resulting leaning on this bdlg.rem:own immediately brace east wall.bracing designed by & installed u/direct cont.supervision of nyc licensed p.e.start work by 12/13/2018.file for permit within 2 days of work start

    Dec 17, 2018

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Dec 14, 2018

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Dec 14, 2018

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Dec 13, 2018

    Dob violation - active
  • Construction other optional

    Structure rendered non-compliant at time of inspection 17 wa observed that the backyard is in a potential collapse zone due to 72 hillside avenue collapsing onto 71 hillside

    Dec 12, 2018

    Dob violation - active
  • Construction other optional

    Structure rendered non-compliant at the time of inspection it was observed that the mud/sun room was in potential collapse due to 72 hillside avenue collapsing onto 71 hillside avenue

    Dec 12, 2018

    Dob violation - active
  • Construction other optional

    Structure rendered non-compliant at the time of inspection it was observed that the mud/sun room was in potential collapse due to 72 hillside avenue collapsing onto 71 hillside avenue

    Dec 12, 2018

    Dob violation - active
  • Construction other optional

    Structure rendered non-compliant at the time of inspection damage was

    Dec 12, 2018

    Dob violation - active
  • Construction other optional

    Structure rendered non-compliant at the time of inspection it was observed that side yard (exposure #2) is in a potential collapse zone due to 72 hillside avenue collapse onto 71 hillside avenue *vacate side yard of 73 hillside ave at exposure #2*

    Dec 12, 2018

    Dob violation - active
  • Construction other optional

    Structure rendered non-compliant at the time of inspection damage was observed to the premises due to 72 hillside avenue collapse onto 71 hillside avenue

    Dec 12, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 30, 2018

    Dob violation - dismissed
  • Construction other optional

    Construction site open, no construction fence in place

    May 2, 2018

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Apr 16, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 4, 2018

    Dob violation - dismissed
  • Construction other optional

    Due to active jobsite damage adjacent property 9 bayside avenue, has p vc drain pipe and air vent broken also ac units concrete slab has been undermined will sand being washed away

    Jun 5, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 26, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 26, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 26, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 7, 2017

    Dob violation - active
  • Construction other optional

    Boro commissioner has ordered work stopped for job # 420653297

    Mar 1, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 11, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 24, 2016

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 16, 2015

    Dob violation - active

ECB violations · 116

  • Class - 2

    Failure to maintain building in safe & code compliant condition 28-301.1, at both entrances of property (hillside ave. & roxbury ave.) missing safety handrails, at hillside ave. side missing safety guardrails a

    Jul 30, 2026

    Resolve
  • Class - 2

    Failure of permit holder to provide inspection access to and/or exposeongoing construction or work on an active permitted c of c. at time ofinspection observed 2x workers exiting cellar level. access was denied

    Feb 5, 2026

    Resolve
  • Class - 1

    Proposed 1 story commercial nb/ active construction site failed to provide and maintain adequate guardrail system @ exp.1,2,3,& 4 under job # q00738436 bc. 3301.2 maintain safety equipment measures or temp. con

    Jun 20, 2025 · Penalty $5,000

    Active
  • Class - 1

    1 story commercial nb active site observed inadequate shoring @ exp. 1,2,3 shoring rests on sand fo and so posts nailed down without simpson strong ties /adequate use of pumpjack scaffold @ exp. 2 without provi

    Jun 20, 2025

    Resolve
  • Class - 1

    Proposed 1 story commerical nb active construction site upon request cs under job application # q00738436 failed to provide site safety plan on site under section law :3301.7 / stop all work under job # q0073

    Jun 20, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    Failed to identify and log unsafe conditions on the jobsite and how to correct them.identify and log unsafe conditions and provide correcting methods.

    Apr 22, 2025

    Resolve
  • Class - 2

    Observed 1 story building under construction operations with piles of dirt blocking the entrance and obstructing the pathways on the jobsite, fence has been removed on the corner exp#3&4 and is used as an acces

    Apr 22, 2025

    Resolve
  • Class - 2

    Failure to comply with commissioner's order contained in summons #39041521j issued on 5/21/2021, and failure to file a certfiicate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable certi

    May 15, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Observed expired construction fence permit. construction fence with permit # 440362616 issued on 07/01/2019 and expired on 12/31/2020, renew permit

    May 21, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with commissioners order contained in summons/violation#35358047l issued on 05/31/19,and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2).an acceptible certifica

    Aug 3, 2020 · Penalty $625

    Resolve
Show 40 more ↓
  • Class - 2

    Jobsite fence not constructed or maintained as required note at time of my inspection observed active jobsite the construction jobsiet fenc was missing or not constructed at exp 1,2,4 side as required publc a

    Jan 13, 2020

    Resolve
  • Class - 3

    Work does not conform to approved construction documents and or amend-ments. job # 420533248 drawing dated 04/06/12 noted: 1)at hillside avenue new deck extended to property side line (planc shows 3' distace

    May 31, 2019 · Penalty $500

    Resolve
  • Class - 2

    Installed pews and created seating arrangements for approx. 140 people inside a building called "st. genevieve r c church". no public assembly permit in file or posted at premise at time of inspection., obtain

    May 28, 2019 · Penalty $800

    Active
  • Class - 2

    Temporary construction equipment on site-expired permit. noted: construction fence erected around property and permit has expired and unguarded on a stalled site. remedy: renew permit

    Apr 16, 2019 · Penalty $620

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation#35335002x issued on6/19/2018 & to file a certificate of corr ection pursuant to 28-201.1 and 1rcny 102-01(d)(2).an acceptible cert

    Apr 9, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    3307.3.2;failure to provide lot line construction fence.at time of inspection it was observed that no lot line fence was installed at exposure #4 the code stipulates that a construction site must be fully enclo

    Mar 21, 2019

    Resolve
  • Class - 2

    Failure to safeguard all persons and property affected by construtcion operations.at time of inspection itwas observed that the entry door of the construction at exposure #1(roxbury ave side) was open unsecured

    Mar 21, 2019 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. i observed on the 1st fl area in the waiting area of the mechanic shop a flexible connector being used on the space heater. which is prohibited space heater

    Feb 20, 2019 · Penalty $3,125

    Active
  • Class - 1

    Failure to safeguard public+property. observed,unsecured construction site,consisting of missing fence,site wide open w/ construction debris,materials scattered about site,also approx 2ft standing water in cell

    Dec 26, 2018 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to safeguard public and property. at time of inspection for a partial collapse upon arrival i observed builders was attepting to elevate 2 sty home building shifted off supports and tipped over against

    Dec 12, 2018 · Penalty $10,000

    Resolve
  • Class - 1

    Work w/o a permit. noted: at cellar level erected full height partition walls to create(1)room & bathroom. installed water & waste line for 3pc bathroom(sink,toilet,shower)& residential sink w/gas line for stov

    Dec 11, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Residence converted maintained or occupied as a dwelling for more thanthe legally approved # of families authorized by the c of o or officaldept records. c of o#114644 indicates residence as a 2 family 1st floo

    Dec 11, 2018 · Penalty $2,500

    Active
  • Class - 2

    Failed to post/properly post work permit. at time of inspection, noted: at exp #1 and #3 jobsite fence and did not have the required permit posted as per code, at time of demo signoff inspection. rem: comply wi

    Nov 7, 2018 · Penalty $312

    Resolve
  • Class - 2

    Jobsite fence not in place, maintained or inadequate. note: at the time of demolition sign-off inspection, i observed construction fence at exp #3 and #4 was not adequate at the time, panels were leaning toward

    Nov 7, 2018

    Resolve
  • Class - 2

    Viewing panels. at time of inspection, noted: at exp #1 and #3 jobsite fence did not have the required viewing panels as per code. at time of demo signoff inspection. rem: comply with code, provide viewing pane

    Nov 7, 2018 · Penalty $400

    Resolve
  • Class - 2

    Failure to comply w/ commissioner's order contained in summons/violation#35307117h issued on 12/6/17, and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certifica

    Aug 30, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain fence. at time of inspection i observed fence not adequately maintained w/multiple panel missing throughout property fence. in response to complaint kids were observed playing inside jobsite

    Aug 15, 2018

    Resolve
  • Class - 2

    Work w/out a permit. noted: 1 story frame bldg constructed a 1 story horizontal extension @ front of cmu pillars, approx 4' high w/ new windows. new electrical & plumbing work in progress. all roof shingles & s

    Jun 19, 2018 · Penalty $1,250

    Resolve
  • Class - 3

    Work does not conform to approved construction documents and/or approved amendments. noted: (1) front terrace found south side stair (5) risers not shown on terrace floor plan & plot plan dated apr. 27, 2012. j

    Dec 6, 2017 · Penalty $200

    Resolve
  • Class - 1

    Work w/o permit. i observed on the first floor area 7 new sprinkler heads and new rpi backflow preventer installed....lmp stated he did not do any work at this premises, work was perform by unlicensed contracto

    Nov 24, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. noted: inadequate handrails on upper wooden deck at side entrance & rear yyard-handrail below code specification at a height of 36"inches. code is 42"inches at

    Nov 13, 2017

    Resolve
  • Class - 2

    Work without a permit:expired permit noted:a check of dept. records attime of inspection, indicates that the bulding permit (nb)42187673-01nbdissued on 02/29/2016,expired on 10/26/2016 and has not been renewed

    Mar 28, 2017

    Resolve
  • Class - 2

    Job site fence not constructed pursuant to subsection. noted: premises2.5 sty frame bldg under construction. construction fence around the property line erected but no proper support. not erected properly. fenc

    Mar 10, 2017 · Penalty $400

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans at job site at time of inspection. under alt-2 #421384086 at time of inspection,no plans were provided. remedy: provide approved/accepted plans. contact sep unit at

    Jan 11, 2017

    Resolve
  • Class - 1

    Failure to take and provide safety measures, sidewalk shed, netting, etc where required to protect and secure public safety from documentedunsafe facade as per 1rcny 103-04. facade technical report filed unsaf

    Nov 17, 2016

    Resolve
  • Class - 1

    Failure to provide required notification prior to the commencement of demo. noted: upon review of dept records @ time of insp, there is no notification noted in system (bis). rem: notify the dept.

    Oct 13, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    B101 50 weil mclain eg45 gas fired steam boiler has no proper permits.

    May 25, 2016 · Penalty $1,630

    Active
  • Class - 2

    Failure to comply w/the comm's order contained in nov 35029032l on 11-6-13 & to file a c of c pursuant to 28-201.1'28-204.4 & 1rcny 102-01. remedy: comply w/comm's orders.

    Oct 9, 2015 · Penalty $400

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in nov 35019626j issuedon 5/4/13 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny 102-01. remedy: comply w/comm's order.

    Oct 9, 2015 · Penalty $800

    Resolve
  • Class - 1

    Work does not conform to court docs and/or amendments. observed on 8/24/15 at osp exterior gas meter bar and piping not installed as per appl #420955452 inspt ref 1-341671 5/15/15. perform new insps. inspt sel

    Aug 24, 2015 · Penalty $1,000

    Active
  • Class - 2

    Exit doors not self closing. noted: at 3r,3p and smoke door adjacent to room n367. the door closers do not allow doors to adequately self close. rmdy: comply with code.

    May 8, 2015

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35019626j issued on 5/4/13,for work w/o permit - new 5' high cmu foundation. remedy: comply w/the comm's order.

    Nov 8, 2014 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35019625h issued on 5/4/13,for work w/o permit - new 5' cmu foundation & wood deck. remedy: comply w/the comm's order.

    Nov 8, 2014 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35019626j issued on 5/4/13,for work w/o permit - new 5'high cmu foundation. remedy: comply w/the comm's order.

    Sep 13, 2014 · Penalty $24,000

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35019625h issued on 5/4/13,for work w/o permit - new cmu foundation & wooden deck. remedy: comply w/the comm's order.

    Sep 13, 2014 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to comply with the comm order contained in nov#35019625h issued on 05/04/13 for work w/o permit new cmu foundation & wooden deck.rem:comply with the comm order.

    Jul 14, 2014 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to comply with the comm order contained in nov#35019626j issued on 05/04/13 for work w/o permit-mew 5'high cmu foundation.rem:comply with the comm order.

    Jul 14, 2014 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to comply w/ the comm's order contained in notice of violation#35029032l issued on 11/06/13,for work w/o permit-elevating house height w/ new cmu block work.rem:comply w/ the comm's order.

    May 3, 2014 · Penalty $6,000

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34994743x issued on 5/21/13 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.

    Mar 1, 2014 · Penalty $800

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order contained in notice of violation #35029032l issued on 11/6/13,for work w/o permit-elevating house height w/new cmu block wall. remedy: comply w/the comm's order.

    Mar 1, 2014 · Penalty $2,400

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Oct 20, 2026 · Apt 27A

    Close
  • Heat/hot water

    Apartment only

    Feb 23, 2026 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Apr 7, 2025 · Apt 27B

    Close
  • Heat/hot water

    Apartment only

    Mar 26, 2025 · Apt B

    Close
  • Heat/hot water

    Apartment only

    Mar 22, 2025 · Apt B

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2025 · Apt B

    Close
  • Door/window

    Window frame

    Nov 17, 2023 · Apt 27B

    Close
  • Unsanitary condition

    Mold

    Nov 17, 2023 · Apt 27B

    Close
  • Door/window

    Window frame

    Nov 14, 2023 · Apt 27B

    Close
  • Unsanitary condition

    Mold

    Nov 14, 2023 · Apt 27B

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Nov 14, 2023 · Apt 27B

    Close
  • Unsanitary condition

    Mold

    Sep 29, 2023 · Apt 27A

    Close
  • Water leak

    Heavy flow

    Sep 29, 2023 · Apt 27A

    Close
  • Heat/hot water

    Entire building

    Apr 6, 2023 · Apt 47S

    Close
  • Heat/hot water

    Entire building

    Mar 25, 2023 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Jul 21, 2022 · Apt 27A

    Close
  • Unsanitary condition

    Mold

    Jul 21, 2022 · Apt 27A

    Close
  • Water leak

    Damp spot

    Jul 21, 2022 · Apt 27A

    Close
  • Unsanitary condition

    Pests

    Jul 21, 2022 · Apt 27A

    Close
  • Paint/plaster

    Window/frame

    Jul 21, 2022 · Apt 27A

    Close
  • Water leak

    Heavy flow

    Jul 21, 2022 · Apt 27A

    Close
  • Heat/hot water

    Entire building

    Dec 20, 2019 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Dec 9, 2019 · Apt 23B

    Close
  • Paint/plaster

    Ceiling

    Dec 9, 2019 · Apt 23B

    Close
  • Paint/plaster

    Ceiling

    Dec 9, 2019 · Apt 23B

    Close
  • Paint/plaster

    Ceiling

    Dec 9, 2019 · Apt 23B

    Close
  • Water leak

    Heavy flow

    Dec 1, 2019 · Apt 23B

    Close
  • Heat/hot water

    Apartment only

    Nov 14, 2019 · Apt 23B

    Close
  • Heat/hot water

    Apartment only

    Nov 1, 2019 · Apt 11B

    Close
  • Heat/hot water

    Apartment only

    Oct 24, 2019 · Apt 11B

    Close
  • Unsanitary condition

    Mold

    Oct 21, 2019 · Apt 11B

    Close
  • Water leak

    Slow leak

    Oct 21, 2019 · Apt 11B

    Close
  • Paint/plaster

    Ceiling

    Oct 21, 2019 · Apt 11B

    Close
  • Paint/plaster

    Wall

    Oct 21, 2019 · Apt 11B

    Close
  • Paint/plaster

    Ceiling

    Oct 21, 2019 · Apt 11B

    Close
  • Heat/hot water

    Apartment only

    Oct 21, 2019 · Apt 11B

    Close
  • Heat/hot water

    Apartment only

    Oct 21, 2019 · Apt 11B

    Close
  • Heat/hot water

    Apartment only

    Oct 19, 2019 · Apt 11B

    Close
  • Heat/hot water

    Entire building

    Oct 19, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Oct 19, 2019 · Apt 11B

    Close
  • Unsanitary condition

    Pests

    Oct 18, 2019 · Apt 11A

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2019 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Oct 10, 2019 · Apt BLDG

    Close
  • Electric

    No lighting

    Sep 30, 2019 · Apt 11B

    Close
  • Water leak

    Damp spot

    Jun 1, 2019 · Apt 3A

    Close
  • Water leak

    Slow leak

    Jun 1, 2019 · Apt 3A

    Close
  • Unsanitary condition

    Mold

    Jun 1, 2019 · Apt 3A

    Close
  • Plumbing

    Water supply

    Sep 1, 2018 · Apt 23B

    Close

Sales history

DatePriceTypeUnits
Sep 28, 2026$550,000One family dwellings—
Aug 28, 2026$720,000One family dwellings—
Jul 27, 2026$610,000One family dwellings—
Jul 22, 2026$630,000One family dwellings—
Jul 20, 2026$475,000One family dwellings—
Jun 29, 2026Non-market transferOne family dwellings—
Jun 18, 2026Non-market transferOne family dwellings—
Jun 15, 2026$500,000One family dwellings—
Apr 9, 2026$607,500One family dwellings—
Feb 3, 2026$548,000One family dwellings—
Jan 30, 2026Non-market transferOne family dwellings—
Jan 28, 2026$250,000One family dwellings—
Nov 17, 2025Non-market transferOne family dwellings—
Nov 7, 2025$426,000One family dwellings—
Oct 27, 2025$540,000One family dwellings—
Oct 24, 2025Non-market transferOne family dwellings—
Oct 7, 2025$565,000One family dwellings—
Oct 2, 2025Non-market transferOne family dwellings—

Building details

Building type
One-family home (A8)
Year built
1938
Floors
1
Residential units
411
Building area
350,000 ft²
Lot area
920,966 ft²
Zoning
R4
Community board
414
Council district
32
Block / lot
16340 / 50
Assessed value
$3,283,069
Landmark / historic district
No

Questions about 1 Rockaway Point Blvd

Who owns 1 Rockaway Point Blvd?

The owner of record in NYC Department of City Planning PLUTO data is Breezy Point Co-Op.

Does 1 Rockaway Point Blvd have violations?

Yes. NYC HPD has recorded 66 housing violations at this property.

Is 1 Rockaway Point Blvd rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1 Rockaway Point Blvd built?

City records list 1938 as the year it was built.

How many apartments are in 1 Rockaway Point Blvd?

It has 411 residential units and 427 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.