121 Beach 129 Street
Queens, NY 11694BBL 4-16239-0056Map
Owner of record: Sullivan, Mark
121 Beach 129 Street is a two-family home built in 1930 in Queens, 11694. It has 2 residential units across 2 floors. The owner of record is Sullivan, Mark. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 9
- ECB violations
- 22
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 9
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 24, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 24, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 24, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 24, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 24, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 24, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 24, 2021
Dob violation - dismissed - Plumbing none
The dob intends to revoke all approvals and permits under plumbing job #420652902 due to suspension of master plumbers license. stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit
Sep 11, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 4, 2018
Dob violation - dismissed
ECB violations · 22
- Class - 2
At time of inspection i observed a construction fence in place surrounding the perimeter of a 2 story building. dob records revealed that the permit had expired on 03/01/2023 and was not renewed. as per code wh
Jul 24, 2023 · Penalty $1,280
Active - Class - 2
No project information panel at exp #1.at time of inspection of closed alt 2 family horizontal and vertical enlargement observed at exp #1 no display panel no permits posted as per building code.remedy:comply w
Mar 10, 2022 · Penalty $3,125
Resolve - Class - 1
Bc3301.1 osha(power lines near scaffold)1926.451(f)(g)at time of inspection of 2 family alt horizontal and vertical enlargement observed overhead powerlines very close to exp #1 #2 closer than 3 ft.extremely ha
Mar 9, 2022 · Penalty $6,250
Resolve - Class - 1
Construction superintendent failed to perform his duties or make jobsite log available.at time of inspection of a 2 story house inadequate super log's were onsite last date was 9/11/2020.no competent person ons
Aug 30, 2021 · Penalty $12,500
Resolve - Class - 1
Failure to ensure each worker has successfully completed the required training.at time of inspection of an active site,i observed worker(bailon obando miguel yamil)working when i ask for his sst card none was p
Aug 30, 2021 · Penalty $12,500
Resolve - Class - 2
Failure to maintain/display onsite documents by bc chapter 33.at time of inspection of a 2 family house to make horizontal and vertical enlargement,i observed no ssp,preshift,orientation for workers.toolbox.rem
Aug 30, 2021 · Penalty $625
Resolve - Class - 2
3314.1 no planks(frame pins)no stacking pins.at time of inspection of a 2 story house,i observed a pipe scaffold at exp3 not fully planked and missing framing pins.stop all work on pipe scaffold at exp3.remedy:
Aug 30, 2021 · Penalty $625
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction.no guardrail.at time of inspection i observed no guardrailat staircase leading to cellar at exp1 interior.stop all work at exp1
Aug 30, 2021
Resolve - Class - 1
Failure to comply with manufacturer specifications.at time of inspection 2 family house,i observed a pump jack at exp4 exterior.when i ask for the manufacturer specifications none were provided at time of inspe
Aug 30, 2021 · Penalty $625
Resolve - Class - 1
Failure to ensure each worker has successfully completed the required training.at time of inspection of an active site,i observed worker(bailon obando miguel yamil)working when i ask for his sst card none was p
Aug 30, 2021 · Penalty $12,500
Resolve
Show 12 more ↓
- Class - 1
Work does not conform to approved plans.at time of inspection of a 2 family house,horizontal and vertical enlargement,i observed wood joist beams throughout the site not on the design drawings.there was also a
Aug 30, 2021 · Penalty $2,500
Resolve - Class - 1
3303.7.2 fire extinguishers.at time of inspection of a family house.i observed no fire extinguishers loged or maintain throughout the site. stop all work.remedy:provide/maintain fire extinguishers as per fire c
Aug 30, 2021 · Penalty $625
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#35308827r issued on 1/4/18, and to file a certificate of correctionpursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certificate
Oct 4, 2018 · Penalty $1,250
Resolve - Class - 2
Temporary construction equipment on site expired permit. @ time of insp 2 story alt1. under construction observed fence permit is expired for construction fence @ 121 beach 129 street queens. rem: renew permit
Jul 9, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/comm's order contained in summ/vio#35308825n issued on 01/04/18 and to file a cofc pursuant tpo 28-201.1 and 1rcny 102-01.failure to safeguard all persons and property affectd by constructio
Jun 8, 2018
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio #35308825n issued on 01/04/18 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.no compliance recorded for failure to safeguard all
Apr 15, 2018
Resolve - Class - 2
Jobsite fence not constructed pursuant to subsection.noted:@active jobsite under job#420652902.observed @exp#4 (right side) 4 panels of jobsite fence partially dislodged & leaning toward adjacent property.rem:c
Mar 10, 2018 · Penalty $400
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation #35308825n issued 01/04/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. rem: comply commissioner'
Feb 25, 2018 · Penalty $2,000
Resolve - Class - 2
Sec. 1704.1.1;27-132 failure to file tr-1/ noted: at site under app#420652902 found installation of pre-fabricated joists/lvl & tr1-1 has not been filed w/dob. remedy: stop all work,make safe,file tr-1.
Jan 4, 2018 · Penalty $800
Resolve - Class - 2
Failure to post contractor's sign at the time of inspection i observed no contractor sign posted at construction job site. remedy: provide contractor sign at job site.
Jan 4, 2018 · Penalty $2,000
Resolve - Class - 2
Failure to post no smoking signs at construction site per fire code. at the time of inspection noted no smoking signs posted at construciton job site. remedy: post"no smoking"signs.
Jan 4, 2018 · Penalty $2,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. at the time of inspection,noted that the 3 sty 2 family house structure fully collapsed to foundation causing damage to adjacent
Jan 4, 2018 · Penalty $12,500
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1930
- Floors
- 2
- Residential units
- 2
- Building area
- 1,536 ft²
- Lot area
- 3,510 ft²
- Zoning
- R4A
- Community board
- 414
- Council district
- 32
- Block / lot
- 16239 / 56
- Assessed value
- $58,260
- Landmark / historic district
- No
Questions about 121 Beach 129 Street
Who owns 121 Beach 129 Street?
The owner of record in NYC Department of City Planning PLUTO data is Sullivan, Mark.
Does 121 Beach 129 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 121 Beach 129 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 121 Beach 129 Street built?
City records list 1930 as the year it was built.
How many apartments are in 121 Beach 129 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.