308 Beach 86 Street
Queens, NY 11693BBL 4-16117-0025Map
Owner of record: 308 B 86th LLC
308 Beach 86 Street is a walk-up apartment building built in 2005 in Queens, 11693. It has 3 residential units across 3 floors. The owner of record is 308 B 86th LLC. HPD has recorded 105 housing violations here, most recently on May 8, 2026. 1 of the 50 most recent violations are still open.
- HPD violations
- 105
- DOB violations
- 0
- ECB violations
- 8
- HPD complaints
- 93
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 105
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at boiler room, 1st story
May 14, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3, 2nd story, 1st apartment from north at east
May 14, 2025 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2, 2nd story, 2nd apartment from north at east
May 14, 2025 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective defective in the entrance located at apt 1, 1st story, 1st apartment from north at east
May 14, 2025 · Apt 1
Closed — Violation dismissed - BHazardous
Replace with new the missing step to door at boiler room, 1st story
May 14, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 3, 2024
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front of building yard
Jul 7, 2024
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater then 10 sq.ft at east wall in the kitchenette located at apt 2, 2nd story, 2nd apartment from north at east
Jul 4, 2024 · Apt 2
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 2, 2nd story, 2nd apartment from north at east
Jul 4, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2, 2nd story, 2nd apartment from north at east
Jul 4, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from east at north located at apt 2, 2nd story, 2nd apartment from north at east
Jul 4, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east at north located at apt 2, 2nd story, 2nd apartment from north at east
Jul 4, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east
Jul 4, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt 2, 2nd story, 2nd apartment from north at east
Jul 4, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the kitchenette located at apt 2, 2nd story, 2nd apartment from north at east
Jul 4, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from east at north located at apt 2, 2nd story, 2nd apartment from north at east
Jul 4, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenette located at apt 2, 2nd story, 2nd apartment from north at east
Jul 4, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling and west wall in the 1st room from east located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 4 sq.ft ceiling in the 5th room from east located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approx 10 sq.ft ceiling and east wall in the kitchen located at apt 2, 2nd story, 2nd apartment from north at east original violation 16932863 issued 27-apr-24 has been upgraded to class c per administrative code §27-2017.3a(5)(a) or (b).
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 10 sq.ft ceiling and east wall in the kitchen located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 27, 2024
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 27, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Apr 27, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Apr 27, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 27, 2024
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Apr 27, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective counter balance window lower sash south wall in the 1st room from east located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all ceilings and all walls in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 5th room from east located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 5th room from east located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood base cabinet in the kitchen located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the kitchen located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 4 sq.ft ceiling in the 5th room from east located at apt 2, 2nd story, 2nd apartment from north at east original violation 16932874 issued 27-apr-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from east located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 3rd room from east located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 1st room from east located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood door in the 1st room from east located at apt 2, 2nd story, 2nd apartment from north at east
Apr 27, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Apr 27, 2024
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 8
- Hazardous
Failure to safely and properly remove construction debris from site appl#402098305 defects noted accumulation of masonry lumber and organic debris strewn thruout at front of premises a pile of broken steel stud
Sep 26, 2005 · Penalty $500
Resolve - Non-hazardous
Work does not conform to approved plans # 402098305. non conforming work noted 1) steel i-beams did not shown at plan was installed on basement,1st, 2nd, 3rd levels 2) headers for door framing did not installed
Sep 26, 2005 · Penalty $250
Resolve - Non-hazardous
Work does not confrom to approved plans work done under appl#402098305non conforming work noted metal studs repalced with wood studs throug h out the building at 1st and 2nd floors the layout of floor joists co
Jul 12, 2005 · Penalty $250
Resolve - Non-hazardous
Failure to provide adequate protection for side walks and walk ways during construction operation. defect noted: fence surrounding perimeter on entire construction site is in disrepair. 25'seccion on rockaway
Jul 7, 2005 · Penalty $2,000
Resolve - Hazardous
Failure to maintain building hazardous noted wood fence sourdaning perimeter on entire construction site has nails protruding through the plywood boards onto sidewalks remedy:stop all work make all necessaries
Jul 7, 2005
Resolve - Hazardous
Failure to maintain adequate housekeeping defect noted excessive amounts of debris throughout exterior and interior const site debris consisted in broken concrete broke piles with protruding nails wood,wood stu
Jul 7, 2005 · Penalty $500
Resolve - Hazardous
Job site fence defective.violation noted:at time of inspection was in with no work or activity.several sections of the construction fence were either missing or collapsed.leaving the job site exposed and open t
May 24, 2005 · Penalty $500
Resolve - Non-hazardous
Work does not conform to approved plans. non-conforming work noted: permit #'s 402084141,402084150,402084169. installation of approx 88 linear feet of 4x8 construction plywood with approx (16) 4x4 wood post
Mar 17, 2005 · Penalty $250
Resolve
Complaints
- Plumbing
Water supply
Jul 5, 2024 · Apt 2
Close - Unsanitary condition
Pests
Apr 25, 2024 · Apt 2
Close - Door/window
Door frame
Apr 25, 2024 · Apt 2
Close - Flooring/stairs
Floor
Apr 25, 2024 · Apt 2
Close - Flooring/stairs
Floor
Apr 25, 2024 · Apt 2
Close - Safety
Smoke detector
Apr 25, 2024 · Apt 2
Close - Flooring/stairs
Floor
Apr 25, 2024 · Apt 2
Close - Safety
Window guard broken/missing
Apr 25, 2024 · Apt 2
Close - Door/window
Window frame
Apr 25, 2024 · Apt 2
Close - Water leak
Heavy flow
Apr 25, 2024 · Apt 2
Close
Show 40 more ↓
- Unsanitary condition
Sewage
Apr 25, 2024 · Apt 2
Close - Plumbing
Water supply
Apr 25, 2024 · Apt 2
Close - Unsanitary condition
Pests
Apr 25, 2024 · Apt 2
Close - Plumbing
Water supply
Apr 25, 2024 · Apt 2
Close - Unsanitary condition
Mold
Apr 25, 2024 · Apt 2
Close - Appliance
Electric/gas range
Apr 25, 2024 · Apt 2
Close - Safety
Carbon monoxide detector
Apr 25, 2024 · Apt 2
Close - Plumbing
Water supply
Dec 30, 2022 · Apt 3
Close - Heat/hot water
Entire building
Dec 30, 2022 · Apt 3
Close - Electric
Power outage
Feb 24, 2019 · Apt 1
Close - Heat/hot water
Entire building
May 14, 2017 · Apt 2
Close - General
Windows
Mar 1, 2012 · Apt 1
Close - Heating
Heat related
Mar 1, 2012 · Apt 1
Close - Heating
Heat related
Mar 1, 2012 · Apt 1
Close - Paint/plaster
Ceiling
Jan 6, 2012 · Apt 2
Close - Paint/plaster
Ceiling
Jan 6, 2012 · Apt 2
Close - Plumbing
Water-leaks
Jan 6, 2012 · Apt 2
Close - Heating
Heat related
Jan 6, 2012 · Apt 2
Close - General
Doors
Jan 4, 2012 · Apt 1
Close - Nonconst
Carbon monoxide
Jan 4, 2012 · Apt 1
Close - Nonconst
Vermin
Jan 4, 2012 · Apt 1
Close - General
Windows
Jan 4, 2012 · Apt 1
Close - Heating
Heat related
Jan 4, 2012 · Apt 1
Close - General
Ventilation system
Jan 4, 2012 · Apt 1
Close - General
Ventilation system
Jan 4, 2012 · Apt 1
Close - Heating
Heat related
Dec 2, 2011 · Apt 2
Close - General
Doors
Nov 19, 2011 · Apt 1
Close - Plumbing
Water-leaks
Nov 19, 2011 · Apt 1
Close - Plumbing
Water-leaks
Nov 19, 2011 · Apt 1
Close - General
Windows
Nov 19, 2011 · Apt 1
Close - Heating
Heat related
Nov 19, 2011 · Apt 1
Close - Heating
Heat related
Aug 18, 2011 · Apt 2
Close - Heating
Heat related
Aug 15, 2011 · Apt 2
Close - Plumbing
Water-leaks
Aug 10, 2011 · Apt 2
Close - Plumbing
Water supply
Aug 10, 2011 · Apt 2
Close - Appliance
Electric/gas range
Aug 10, 2011 · Apt 2
Close - Plumbing
Water-leaks
Aug 10, 2011 · Apt 2
Close - Nonconst
Vermin
Jun 4, 2011 · Apt 3
Close - Heating
Heat related
Jun 4, 2011 · Apt 3
Close - General
Windows
Jun 4, 2011 · Apt 3
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| May 11, 2026 | $1,090,000 | Three family dwellings | 3 |
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2005
- Floors
- 3
- Residential units
- 3
- Building area
- 2,727 ft²
- Lot area
- 2,727 ft²
- Zoning
- R4-1
- Community board
- 414
- Council district
- 32
- Block / lot
- 16117 / 25
- Assessed value
- $60,960
- Landmark / historic district
- No
HPD registration #427112, last renewed Jul 9, 2025.
Questions about 308 Beach 86 Street
Who owns 308 Beach 86 Street?
The owner of record in NYC Department of City Planning PLUTO data is 308 B 86th LLC.
Does 308 Beach 86 Street have violations?
Yes. NYC HPD has recorded 105 housing violations at this property.
Is 308 Beach 86 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 308 Beach 86 Street built?
City records list 2005 as the year it was built.
How many apartments are in 308 Beach 86 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.