512 Beach 66 Street
Queens, NY 11692BBL 4-16032-0006Map
Owner of record: Joseph, Pierre R
512 Beach 66 Street is a walk-up apartment building built in 1950 in Queens, 11692. It has 3 residential units across 1 floor. The owner of record is Joseph, Pierre R. HPD has recorded 56 housing violations here, most recently on July 9, 2025. 36 of the 50 most recent violations are still open.
- HPD violations
- 56
- DOB violations
- 0
- ECB violations
- 4
- HPD complaints
- 97
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 56
- BHazardous
Properly repair with similar material the broken or defective masonary concrete riser at 3rd through 8th from bottom up, at building front at stoop
Jul 9, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak exterior south wall, at south yard yard
Jul 9, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective 3rd, 4th, 5th, 6th, 7th and 8th risers from bottom up at building front stoop. at public hall stairs
May 26, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective door frame in the entrance located at apt 2, 1st story, 1st apartment from north at east
May 26, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak the ceiling in the entire apartment located at apt 2, 1st story, 1st apartment from north at east
May 3, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north located at apt 2, 1st story, 1st apartment from north at east
May 3, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak from exterior south wall, at south yard
May 2, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective masonary concrete riser at 3rd through 8th up from bottom front yard at stoop
May 1, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective 3rd,5th,6th. and 7th concrete riser from bottom up at building front stoop
Apr 29, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at exterior facade south wall at south yard
Mar 9, 2025
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Properly repair or replace the broken or defective asphalt shingles and plywood at roof
Mar 9, 2025
Closed — Violation closed - ANon-hazardous
Repair the broken or defective rain leader at west and east yard
Mar 9, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective 3rd, 5th, 6th, 7th and 8th concrete risers at building front at stoop
Mar 9, 2025
Open — Nov sent out - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the 2nd room from east at south located at apt 1, 1st story, 1st apartment from north at east
Mar 9, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from north at west located at apt 1, 1st story, 1st apartment from north at east
Mar 9, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures . in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Mar 9, 2025 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1rear, 1st story, 1st apartment from west at north , section ''side''
Jan 15, 2025 · Apt 1REAR
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1rear, 1st story, 1st apartment from west at north , section ''side''
Jan 15, 2025 · Apt 1REAR
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1rear, 1st story, 1st apartment from west at north , section ''side''
Jan 15, 2025 · Apt 1REAR
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 1rear, 1st story, 1st apartment from west at north , section ''side''
Jan 15, 2025 · Apt 1REAR
Open — Nov sent out - ANon-hazardous
Repair the broken or defective gutter at building front
Jan 15, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective masonary material at 5th, 6th and 7th rise at building front stairs
Jan 15, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story
Jan 4, 2025 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of partition wall erected from floor to ceiling subdividing basement apartment into front and rear section, ( no access to front section of basement apartment) located at apt 1, 1st story
Jan 4, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story
Jan 4, 2025 · Apt 1
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jul 11, 2024
Open — Info nov sent out - CImmediately hazardous
Remove all obstructions from water closet .. in the bathroom located at bsmt-apt 1, 1st story, 1st bsmt-apt from west at north
Jul 9, 2024 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ceiling light fixture in the bathroom located at bsmt-apt 1, 1st story, 1st bsmt-apt from west at north
Jul 9, 2024 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective gaskets at refrigerator doors. in the kitchen located at bsmt-apt 1, 1st story, 1st bsmt-apt from west at north
Jul 9, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1stflo, 1st story, 1st apartment from west at north
Apr 25, 2023 · Apt 1STFLO
Closed — Violation closed - BHazardous
Replace with new the missing door lock in the bathroom located at apt 1stflo, 1st story, 1st apartment from west at north
Apr 25, 2023 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures .. in the entire apartment located at apt 1, 1st story, 2nd apartment from north at east
Sep 20, 2022 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures for cooking 1 sty apt #1. in the kitchen located at apt 1, 1st story, 2nd apartment from north at east
Sep 20, 2022 · Apt 1
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
May 27, 2022
Open — Info nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at bsmt-apt 1, 1st bsmt-apt from west at north
May 24, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 2nd room from north at east located at bsmt-apt 1, 1st bsmt-apt from west at north
May 24, 2022 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 2nd private hallway from north located at bsmt-apt 1, 1st bsmt-apt from west at north
May 24, 2022 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the kitchen located at bsmt-apt 1, 1st bsmt-apt from west at north
May 24, 2022 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the 2nd room from north at east located at bsmt-apt 1, 1st bsmt-apt from west at north
May 24, 2022 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the 2nd private hallway from north located at bsmt-apt 1, 1st bsmt-apt from west at north
May 24, 2022 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of vermin fleas, at basement in the entire apartment located at apt 1, 1st apartment from west at north
Sep 27, 2019 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of vermin files, at basement in the entire apartment located at apt 1, 1st apartment from west at north
Sep 27, 2019 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the broken or defective upper sash window glass, at basement in the kitchen located at apt 1, 1st apartment from west at north
Sep 27, 2019 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective ceiling light fxture, at basement in the bathroom located at apt 1, 1st apartment from west at north
Sep 27, 2019 · Apt 1
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Aug 20, 2019
Open — Info nov sent out - BHazardous
Repair the broken or defective connection drain line at sink in the kitchen located at bsmt-apt 1side, 1st bsmt-apt from west at north
Aug 15, 2019 · Apt 1SIDE
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture in the bathroom located at bsmt-apt 1side, 1st bsmt-apt from west at north
Aug 15, 2019 · Apt 1SIDE
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective glass at upper window sash south wall in the kitchen located at bsmt-apt 1side, 1st bsmt-apt from west at north
Aug 15, 2019 · Apt 1SIDE
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice located at apt 1rear, 1st story, apartment at north
Feb 21, 2018 · Apt 1REAR
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the the entire front yard.
Jan 24, 2018
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 4
- Class - 1
Rca issued 05/31/25 same respondent no appointments made or proof submitted to show correction of rca for failure to maintain bldg safe & code-compliant 28-301.1 previous ecb 39149514x, improper drainage system
Oct 14, 2026 · Penalty $6,250
Active - Class - 2
Rca issued 05/31/25 to same respondent & no corrections or appointments made or proof submitted to show correction of rca for failure to maintain bldg in code-compliant manner 28-301.1, prohibited locking devic
Oct 14, 2026 · Penalty $1,250
Active - Class - 2
Rca issued 05/31/25 to same respondent & no permits issued, jobs filed, appointments made or proof submitted to show correction of rca for work without a permit erected full height partitions to create 1 extra
Oct 14, 2026 · Penalty $1,250
Active - Class - 2
Failure to maintain building in a code compliant manner. noted at steps at exp.1. observed steps are in a state of disrepair with numerous large areas of missing concrete. also, noted at exp.1, observed approx.
May 31, 2025 · Penalty $6,250
Active
Complaints
- Plumbing
Water supply
Jun 30, 2025 · Apt 1
Close - Flooring/stairs
Stairs
May 20, 2025 · Apt 2
Close - Door/window
Door frame
May 20, 2025 · Apt 2
Close - Water leak
Heavy flow
May 20, 2025 · Apt 2
Close - Door/window
Door
May 20, 2025 · Apt 2
Close - Water leak
Slow leak
May 2, 2025 · Apt 2
Close - Heat/hot water
Apartment only
May 2, 2025 · Apt 2
Close - Plumbing
Steam pipe/riser
May 2, 2025 · Apt 2
Close - Flooring/stairs
Floor
May 2, 2025 · Apt 2
Close - Door/window
Door
May 2, 2025 · Apt 2
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
May 1, 2025 · Apt 2
Close - Paint/plaster
Ceiling
May 1, 2025 · Apt 2
Close - Heat/hot water
Apartment only
May 1, 2025 · Apt 2
Close - Door/window
Door
May 1, 2025 · Apt 2
Close - Flooring/stairs
Stairs
May 1, 2025 · Apt 2
Close - Door/window
Door frame
Apr 24, 2025 · Apt 1UPPER
Close - Water leak
Heavy flow
Apr 24, 2025 · Apt 2
Close - Flooring/stairs
Stairs
Apr 7, 2025 · Apt SECOND
Close - Door/window
Door
Apr 7, 2025 · Apt SECOND
Close - Water leak
Heavy flow
Apr 2, 2025 · Apt UPPERL
Close - Heat/hot water
Apartment only
Feb 11, 2025 · Apt 1REAR
Close - Water leak
Heavy flow
Jan 31, 2025 · Apt UPPERL
Close - Heat/hot water
Entire building
Jan 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 13, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Jan 5, 2025 · Apt DWAY1
Close - Heat/hot water
Apartment only
Jan 4, 2025 · Apt 1
Close - Heat/hot water
Entire building
Nov 29, 2024 · Apt 1
Close - Plumbing
Toilet
Aug 15, 2024 · Apt 1STFLB
Close - Unsanitary condition
Sewage
Aug 15, 2024 · Apt 1STFLB
Close - Unsanitary condition
Pests
Jul 9, 2024 · Apt FIRSTF
Close - Plumbing
Toilet
Jul 9, 2024 · Apt FIRSTF
Close - Appliance
Refrigerator
Jul 9, 2024 · Apt FIRSTF
Close - Unsanitary condition
Sewage
Oct 25, 2023 · Apt REAR
Close - Unsanitary condition
Sewage
Oct 25, 2023 · Apt REAR
Close - Heat/hot water
Apartment only
May 3, 2023 · Apt DRIVEW
Close - Water leak
Heavy flow
May 3, 2023 · Apt DRIVEW
Close - Heat/hot water
Apartment only
Apr 24, 2023 · Apt DRIVEW
Close - Appliance
Refrigerator
Apr 24, 2023 · Apt DRIVEW
Close - Plumbing
Bathtub/shower
Apr 24, 2023 · Apt DRIVEW
Close - Plumbing
Bathtub/shower
Feb 8, 2023 · Apt 1STFLO
Close - Electric
Power outage
Sep 19, 2022 · Apt 1
Close - Electric
Power outage
Sep 19, 2022 · Apt BLDG
Close - General
Cooking gas
May 23, 2022 · Apt FIRSTF
Close - Heat/hot water
Entire building
May 23, 2022 · Apt FIRSTF
Close - Plumbing
Basin/sink
Aug 21, 2020 · Apt REARAP
Close - Electric
Outlet/switch
Aug 21, 2020 · Apt REARAP
Close - Plumbing
Bathtub/shower
Aug 21, 2020 · Apt REARAP
Close - Plumbing
Toilet
Aug 21, 2020 · Apt REARAP
Close - Unsanitary condition
Mold
Aug 21, 2020 · Apt REARAP
Close - Electric
No lighting
Sep 23, 2019 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1950
- Floors
- 1
- Residential units
- 3
- Building area
- 2,002 ft²
- Lot area
- 3,000 ft²
- Zoning
- R4-1
- Community board
- 414
- Council district
- 31
- Block / lot
- 16032 / 6
- Assessed value
- $40,800
- Landmark / historic district
- No
Questions about 512 Beach 66 Street
Who owns 512 Beach 66 Street?
The owner of record in NYC Department of City Planning PLUTO data is Joseph, Pierre R.
Does 512 Beach 66 Street have violations?
Yes. NYC HPD has recorded 56 housing violations at this property.
Is 512 Beach 66 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 512 Beach 66 Street built?
City records list 1950 as the year it was built.
How many apartments are in 512 Beach 66 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.