roofy

312 Beach 66 Street

Queens, NY 11692BBL 4-15910-0022Map

Owner of record: Barrios, Gehlert

312 Beach 66 Street is a walk-up apartment building built in 2002 in Queens, 11692. It has 3 residential units across 3 floors. The owner of record is Barrios, Gehlert. HPD has recorded 52 housing violations here, most recently on October 14, 2026. 31 of the 50 most recent violations are still open.

HPD violations
52
DOB violations
0
ECB violations
1
HPD complaints
33

What to know

Concern
13 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 14, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 52

  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the foyer located at apt 3, 3rd story, 1st apartment from north at east

    Oct 14, 2026 · Apt 3

    Open — Nov sent out
  • A

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the north yard yard

    Sep 30, 2026

    Open — Nov certified on time
  • B

    Properly repair with similar material the broken or defective vinyl flooring in the private hallway located at apt 3, 3rd story, 1st apartment from north at east

    Jun 23, 2026 · Apt 3

    Closed — Violation closed
  • B

    Replace with new the missing switch cover at south wall in the foyer located at apt 3, 3rd story, 1st apartment from north at east

    Jun 23, 2026 · Apt 3

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the foyer located at apt 3, 3rd story, 1st apartment from north at east

    Jun 23, 2026 · Apt 3

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the black garbage bags from the floor yard

    Jun 23, 2026

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east

    Mar 26, 2026 · Apt 2

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east

    Mar 26, 2026 · Apt 2

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2, 2nd story, 2nd apartment from north at east

    Mar 26, 2026 · Apt 2

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east

    Mar 26, 2026 · Apt 2

    Open — Nov sent out
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed elctrical wires ceiling throughout in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east

    Mar 26, 2026 · Apt 2

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east

    Mar 26, 2026 · Apt 2

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective wood floor throughout in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east

    Mar 26, 2026 · Apt 2

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings

    Mar 26, 2026

    Open — First no access to re- inspect violation
  • C

    Properly repair with similar material the broken or defective concrete stair tread 12th from bottom up leading to 2nd story from 1st story building front

    Mar 26, 2026

    Closed — Violation closed
  • B

    Replace with new the missing wash basin in the 2nd bathroom from east located at apt 2, 2nd story, 2nd apartment from north at east

    Mar 26, 2026 · Apt 2

    Open — Nov sent out
  • B

    Replace with new the missing shower stall in the 2nd bathroom from east located at apt 2, 2nd story, 2nd apartment from north at east

    Mar 26, 2026 · Apt 2

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls throughout in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east

    Mar 26, 2026 · Apt 2

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3, 3rd story, 1st apartment from north at east

    Mar 26, 2026 · Apt 3

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective sprinkler supply line private hall stairs in the foyer located at apt 3, 3rd story, 1st apartment from north at east

    Mar 26, 2026 · Apt 3

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the foyer located at apt 3, 3rd story, 1st apartment from north at east

    Mar 26, 2026 · Apt 3

    Open — Not complied with
  • C

    Provide ready access to buildings heating system door leading to cellar locked at boiler room

    Mar 26, 2026

    Open — First no access to re- inspect violation
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling throughout in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east

    Mar 26, 2026 · Apt 2

    Open — Nov sent out
  • C

    Replace with new the missing sink in the kitchen located at apt 2, 2nd story, 2nd apartment from north at east

    Mar 26, 2026 · Apt 2

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor, 1st story

    Mar 26, 2026

    Open — First no access to re- inspect violation
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story

    Mar 26, 2026

    Open — First no access to re- inspect violation
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox, 1st story

    Mar 26, 2026

    Open — First no access to re- inspect violation
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story

    Mar 26, 2026

    Open — First no access to re- inspect violation
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story

    Mar 26, 2026

    Open — First no access to re- inspect violation
  • C

    Immediately provide a fire guard as directed by the nyc dept. of housing preservation & development (hpd) and/or the nyc dept. of buildings (dob) to protect against fire hazards observed by hpd and/or dob. fire hazards observed by hpd have resulted in the following additional hpd violation(s): violation # 18738218, # 18747884, # 18747462 in order to protect public safety against imminent fire hazards observed, a fire guard must be provided forthwith for continuous 24 hour coverage, notwithstanding the correction and certification dates set forth above (the correction and certification dates set forth above are applicable for purposes of civil penalties that may be assessed pursuant to nyc administrative code § 27-2115, but do not reflect the date by which a fire guard must be provided). a fire guard must be provided immediately due to the exigency of the dangerous fire hazard conditions observed. the violation requiring a fire guard to be provided will remain open until such time as the fire hazards resulting in the hpd violation(s) referenced above and/or the fire hazards resulting in related dob violation(s) have been dismissed.

    Mar 26, 2026

    Closed — Violation closed
  • C

    Provide an adequate supply of water for the wet sprinkler and/or standpipe system at all stories

    Mar 26, 2026

    Closed — Violation closed
  • B

    Replace with new the missing wash basin in the 1st bathroom from east located at apt 2, 2nd story, 2nd apartment from north at east

    Mar 26, 2026 · Apt 2

    Open — Nov sent out
  • B

    Replace with new the missing water closet in the 2nd bathroom from east located at apt 2, 2nd story, 2nd apartment from north at east

    Mar 26, 2026 · Apt 2

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 21, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the 5th room from east located at apt 2, 2nd story, 2nd apartment from north at east

    Jan 12, 2025 · Apt 2

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east

    Jan 12, 2025 · Apt 2

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2, 2nd story, 2nd apartment from north at east

    Jan 12, 2025 · Apt 2

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at 1st story at boiler room, 1st story

    Jan 12, 2025

    Open — First no access to re- inspect violation
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3, 3rd story, 1st apartment from north at east

    Sep 5, 2024 · Apt 3

    Closed — Violation closed
  • B

    Repair the broken or defective connection at waste line under sink in the kitchen located at apt 3, 3rd story, 1st apartment from north at east

    Sep 5, 2024 · Apt 3

    Closed — Violation dismissed
  • A

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 3, 3rd story, 1st apartment from north at east

    Sep 5, 2024 · Apt 3

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 16, 2024

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 30, 2023

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of slide bolt capable of being padlocked in the entrance located at apt 3, 2nd story, 1st apartment from north at east

    Feb 13, 2023 · Apt 3

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 16, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 16, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 25, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 19, 2015

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 1

  • Class - 1

    Ecb violation & fswo issued for work without permit. atoi observed both 1st and 2nd floor walls and ceiling was gutted, some of the electrical suckets and swiches removed without permit on record., obtain permi

    Mar 30, 2026 · Penalty $2,530

    Active

Complaints

  • Plumbing

    Basin/sink

    Mar 17, 2026 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Mar 17, 2026 · Apt 2

    Close
  • Plumbing

    Radiator

    Mar 17, 2026 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Mar 17, 2026 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Mar 7, 2026 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Mar 7, 2026 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Mar 7, 2026 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Mar 2, 2026 · Apt 2

    Close
  • Plumbing

    Toilet

    Mar 2, 2026 · Apt 2

    Close
  • Paint/plaster

    Wall

    Mar 2, 2026 · Apt 2

    Close
Show 23 more ↓
  • Plumbing

    Basin/sink

    Mar 2, 2026 · Apt 2

    Close
  • Plumbing

    Toilet

    Mar 2, 2026 · Apt 2

    Close
  • Paint/plaster

    Wall

    Mar 2, 2026 · Apt 2

    Close
  • Paint/plaster

    Wall

    Mar 1, 2026 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Mar 1, 2026 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Feb 12, 2026 · Apt 2

    Open
  • Flooring/stairs

    Floor

    Feb 12, 2026 · Apt 2

    Open
  • Water leak

    Heavy flow

    Feb 12, 2026 · Apt 2

    Open
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Feb 18, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Feb 5, 2025 · Apt 6

    Close
  • Electric

    No lighting

    Feb 5, 2025 · Apt 6

    Close
  • Heat/hot water

    Apartment only

    Jan 14, 2025 · Apt 2

    Close
  • Door/window

    Door frame

    Jan 14, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 8, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 6, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 5, 2025 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2024 · Apt 1

    Close
  • Plumbing

    Toilet

    Aug 20, 2024 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2024 · Apt 2

    Close
  • Door/window

    Door

    Dec 26, 2023 · Apt 2

    Close
  • Door/window

    Door frame

    Dec 26, 2023 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Nov 1, 2023 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
2002
Floors
3
Residential units
3
Building area
1,960 ft²
Lot area
2,700 ft²
Zoning
R5
Community board
414
Council district
31
Block / lot
15910 / 22
Assessed value
$55,320
Landmark / historic district
No

HPD registration #425750, last renewed Apr 15, 2026.

Questions about 312 Beach 66 Street

Who owns 312 Beach 66 Street?

The owner of record in NYC Department of City Planning PLUTO data is Barrios, Gehlert.

Does 312 Beach 66 Street have violations?

Yes. NYC HPD has recorded 52 housing violations at this property.

Is 312 Beach 66 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 312 Beach 66 Street built?

City records list 2002 as the year it was built.

How many apartments are in 312 Beach 66 Street?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.