roofy

3-16 Beach 65 Street

Queens, NY 11692BBL 4-15908-0007Map

Owner of record: Beach 65 LLC

3-16 Beach 65 Street is a hospital / health built in 1976 in Queens, 11692. The owner of record is Beach 65 LLC. HPD has recorded 21 housing violations here, most recently on June 19, 2026.

HPD violations
21
DOB violations
134
ECB violations
58
HPD complaints
142

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jun 19, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 21

  • C

    Remove the illegal fastening consisting of self lockable panic bar installed south bulkhead door to roof from stairway b at public hall, 6th story, section at south

    Jun 19, 2026

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at washbasin. in the 1st room from north located at b-room 417, 4th story, 2nd b-room from south at west

    Dec 21, 2023 · Apt 417

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 227, 2nd story, 2nd apartment from east at south , section ''west''

    Nov 24, 2023 · Apt 227

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 4, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 4, 2022

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the 1st entrance from east located at b-room 402, 4th story, 9th b-room from west at north

    Oct 25, 2021 · Apt 402

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the room located at b-room 512, 5th story, 1st b-room from west at north

    Jun 15, 2021 · Apt 512

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the room located at b-room 426, 4th story, 7th b-room from east at south

    Jun 15, 2021 · Apt 426

    Closed — Violation closed
Show 11 more ↓
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the room located at b-room 426, 4th story, 7th b-room from east at south

    Jun 15, 2021 · Apt 426

    Closed — Violation dismissed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the room located at b-room 512, 5th story, 1st b-room from west at north

    Jun 15, 2021 · Apt 512

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the 1st room from north located at b-room 416, 4th story, 3rd b-room from west at north

    Jun 14, 2021 · Apt 416

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall

    May 5, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    May 5, 2021

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    May 5, 2021

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    May 5, 2021

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall

    May 5, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2021

    Closed — Violation dismissed
  • C

    Remove the illegal fastening a double cylinder key operated lock installed at the building entrance door.

    Apr 7, 2020

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 16, 2015

    Closed — Violation dismissed

DOB building violations · 134

  • Elevator elevatorrequired

    Due to a transformer exploding outside of the location. the elevator controller board was compromised.

    Feb 14, 2023

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 15, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 15, 2017

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 18, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 1, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 1, 2016

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 30, 2016

    Dob violation - dismissed
Show 40 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 30, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2014 inspection/test

    Jun 10, 2015

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2014 inspection/test

    Jun 10, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 15, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 15, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 15, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 18, 2013

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 30, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 30, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 19, 2010

    Dob violation - resolved
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed

ECB violations · 58

  • Class - 1

    Failure to install grounding electrode conductor in accordance with section. observed in the main electrical rm no installation of electrode ground rod. ec 250.64, properly install ground electrode conductor

    Apr 2, 2026 · Penalty $4,800

    Active
  • Class - 1

    Unapproved/unsafe/unsuitable electrical equipment, apparatus, materials, devices, appliances or wiring in use. observed in the office cubicles the use of flex cords to power also in the boiler rm electric wire

    Apr 2, 2026 · Penalty $1,600

    Active
  • Class - 1

    Failure to protect conductor(s) against overcurrent per ec. observed in the elevator machine rm that the overcurrent protection is incorrectly sized. ec 240.4 must follow code., provide protection against overc

    Apr 2, 2026 · Penalty $4,800

    Active
  • Class - 1

    Electrical work without a permit. observed on the ground floor the installation one hung electric heater. also one feeder ran from cafeteria panel to new panel location . checked dob now and biz no permit on fi

    Apr 2, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39142831h, file a certificate of correction

    Feb 5, 2026 · Penalty $6,250

    Active
  • Class - 3

    Heat timer boiler control is defectiveýheat timer service tech required¨+apt#620 weather strip@apt door+@roof access door are required;correct violation+submit certificate of correction

    Dec 19, 2025 · Penalty $500

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner. observed non fire rated door at 1 floor level near staff lounge area corridor. potential fire hazard., repair and/replace

    Mar 26, 2025 · Penalty $2,500

    Active
  • Class - 1

    Gas leak found on 2 inch gas valve as well as 2 inch gas piping in the gas meter room located on the main floor. as per pc 102.3 maintenance. installations, both existing and new, and parts thereof shall be mai

    Mar 26, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    I observed at the rear of the dryers on the first floor next to the sprinkler control room. cable assemblies(bx) unsupported and laying across gas and water piping and their metal support systems., secure/suppo

    Oct 24, 2022

    Resolve
  • Class - 1

    Roper gripper do not close after opening up the governor electrical switch. this feature works on the other controller(cu). brake maintenance tag expired on 5/3/21. in car phone not working.

    Oct 24, 2022 · Penalty $1,250

    Resolve
Show 40 more ↓
  • Class - 2

    At 6th fl, smoke door near 616/628 rms, at 5th fl . smoke door near 528 rm, at 3rd fl smoke door near 306/314 rms, at 2nd fl, electrical closet door, smoke door near 218/206 rms & first fl, smoke doors near lob

    Oct 24, 2022

    Resolve
  • Class - 2

    I observed in the elevator machine a gfci receptacle not operating as designed when tested the gfci did not trip as required. also noted in the ground floor kitchen a convenience receptacle installed within 6 f

    Oct 24, 2022 · Penalty $1,200

    Resolve
  • Class - 1

    I observed in the kitchen the improper termination of energized electrical wires extending from a floor mounted junction box. this is an immediate shock hazard as the box is now accessible to personnel., provid

    Oct 24, 2022 · Penalty $1,600

    Resolve
  • Class - 2

    I observed in the lobby entrance and the rear conference room the installation of flexible cords in a raceway this is not permitted under ec 400.8. flexible cords shall not be installed in a raceway as permanen

    Oct 24, 2022

    Resolve
  • Class - 2

    Brake maintenance tag expired on 4/22/20. in car phone not working.

    Oct 24, 2022

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.observed in kitchen on main floor gas piping shut not locked or capped or plugged makes hazardous condition gas now can be instroduced into room.remedy:repa

    Oct 24, 2022 · Penalty $312

    Resolve
  • Class - 2

    At ground level, main entrance doors, library rm, kitchen exit door and corridor smoke doors, illegal kitchen stops and bolts were installed, blocking the normal flow of people in emergency case, provide legal

    Oct 24, 2022

    Resolve
  • Class - 1

    I observed on the roof a conduit exiting the lower wall broken with exposed conductors, also noted the junction boxes feeding the lights with cover with construction tape and with exposed conductors. the flexib

    Oct 24, 2022 · Penalty $400

    Resolve
  • Class - 2

    Combustion air fan to be interlocked with boiler ,remote switch required at 2nd door to boiler room,correct violation and send in certificate of correction

    Oct 1, 2021

    Resolve
  • Class - 2

    Combustion air fans to be interlocked with boiler & missing switch at 2nd door for boiler.correct violation & send in certificate of correction

    Oct 1, 2021

    Resolve
  • Class - 2

    Combustion air fan to be interlocked with water heater,fan by wtr htr cannot run continous need remote switch at 2nd door to boiler room,correct violation & send in certificate of correction

    Oct 1, 2021

    Resolve
  • Class - 2

    Three improper glass fuse on the controller. wires hanging off the terminal not cap replace wire on the terminal.

    Sep 24, 2021

    Resolve
  • Class - 2

    One improper glass fuse on the controller. wires handing off the terminal not cap replace wire on the terminal.

    Sep 24, 2021

    Resolve
  • Class - 2

    Observed: fire proof self-closing at corridor from 6 fl to 1 floor , not self-closing properly due overlapping door leaves, excessive rubbing on saddle or knocking of door frame. also exit door at first floor s

    Aug 19, 2021

    Resolve
  • Class - 1

    No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application install dlm and perfor

    Feb 8, 2021

    Resolve
  • Class - 2

    B254,50a,50b. peerless rh 1995 boiler: 50a-fresh air fans to be interlocked with boiler; 50b-cap or plug open piping. rmdy: correct all violating conditions and submit certificate of correction.

    Aug 15, 2018 · Penalty $625

    Resolve
  • Class - 2

    B254,50a,50b. ao smith gm08svwp boiler: 50a-fresh air fans to be interlocked with boiler; 50b-cap or plug open piping; rmdy: correct all violating conditions and submit certificate of correction.

    Aug 15, 2018 · Penalty $625

    Resolve
  • Class - 2

    B254,50a,50b. peerless fh 2394 boiler: 50a-fresh air fans to be inter locked with boiler; 50b-cap or plug open piping. rmdy: correct all violating conditions and submit certificate of correction.

    Aug 15, 2018 · Penalty $625

    Resolve
  • Class - 2

    50a)manufacturers rating tag for moduler boiler missing. b)lights in boiler room not working. correct all violating conditions and submit a certificate of correction.

    Apr 20, 2018 · Penalty $312

    Resolve
  • Class - 2

    50a)manufacturers rating tag or modular boiler missing. correct all violating conditions and submit a certificate of correction.

    Apr 20, 2018 · Penalty $312

    Resolve
  • Class - 2

    Corroded flue pipe, defective relief valve, missing manual reset aquastat. correct all violating conditions and submit a certificate of correction.

    Apr 20, 2018 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building walls or appurtenances.noted:observed at roof level,perimeter fence is in disrepair,at various locations throughout,some sections of the chain links missing and being held with thin

    Jan 25, 2018

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35272442y issued on 07/17/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner.

    Nov 17, 2017 · Penalty $800

    Resolve
  • Class - 2

    Failure to provide ground fault circuit interrupter.observed in laundry room existing gfci receptacle outlets not properly wired,thereby notproviding proper gfci protection.gfci outlets were checked with gfci p

    Jul 17, 2017 · Penalty $400

    Resolve
  • Class - 1

    Failure to maintain bldg in code-compliant manner.(1)observed in gas meter room gas leaking from cracked 90 degrees elbow on gas meter.utility complany shut off gas to the bldg."photos taken".rem:repair &/or re

    Jul 17, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. at the time of my inspection i observed in the fire sprinkler control room no ball drip(automaic drain) installed on the sprinkler piping as required by the nf

    Jan 27, 2017 · Penalty $500

    Resolve
  • Class - 1

    Failure to maintain bldg in code complaint manner. observed on exterior to connect ball check value capped off. req'd to be open. remedy: remove or replace.

    Aug 30, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    Sec. 408.2 & 411.1 misc violation. observed on 8/30/16 @ 12:35pm in gas meter room & comm. laudry room gas (future) connection exits on house piping & residential gas flex's installed on commercial/gas 1st fl.

    Aug 30, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    Sec. 27-345 failure to maintain bldg code compliant. no fire stopping per bc 712.3;27-345. noted: at 1st fl electric meter room,missing fire stopping w/3 penetrations in cmu block wall to concealed space above

    Feb 23, 2016 · Penalty $250

    Resolve
  • Class - 2

    15h7,70o02,24i10,100u5,17h11,12q3,10h11,19x10,35q7,40o2,100o2,52o2. 100u5-perform and file annual brake test; 12q3-provide top of car; 100 o2-clean hoistway.

    Feb 18, 2016

    Resolve
  • Class - 2

    70o2,100u5,17h11,12q3,10h11,19x10,35q7,42o01,40o2,100o2,52o2. 100u5-perform and file annual brake test; 12q3-provide top of car; 421o01-clean and adjsut controller; 100o2-clean hoistway.

    Feb 18, 2016

    Resolve
  • Class - 1

    Failure to maintain bldg. noted: exterior facade at various areas concrete spalling exposing reinforcement steel, pcs missing/loose. remedy:make safe.

    Aug 12, 2013 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to maintain bldg walls. note: spalling & cracking concrete at various areas of facade concrete (floor ribbons) primarily on south,east,west. facades fls 1-6. remedy: maintain bldg wall.

    Jun 5, 2013 · Penalty $2,500

    Resolve
  • Class - 1

    Operation of a place of assembly w/o a current c of o. noted: observedat time of inspection at 1st fl on the dining room approx 90 chairs w/tables & fully occupied. premises under c of o #401550353 allowed max

    Apr 27, 2013 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. observed at time ofinspection observed: 1) at exposure #1,2,3 & 4 of exterior mansonry wall,spalling of the concrete observed & loose pieces in several locatio

    Apr 27, 2013 · Penalty $1,000

    Resolve
  • Non-hazardous

    17h11.10h11.85v10.59q03.

    Mar 25, 2008 · Penalty $350

    Resolve
  • Non-hazardous

    17h11.10h11.85u15

    Mar 25, 2008 · Penalty $350

    Resolve
  • Non-hazardous

    51f11,46h12, (51)repair worm and gears f(46)replace hoist cables.

    Mar 29, 2000

    Resolve
  • Non-hazardous

    50y11,73o2.

    May 10, 1999

    Resolve
  • Non-hazardous

    50y11,73o2.

    May 10, 1999

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 22, 2026 · Apt 410

    Open
  • Heat/hot water

    Entire building

    Oct 22, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Oct 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jun 16, 2026 · Apt 222

    Close
  • Heat/hot water

    Entire building

    Jun 13, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jun 2, 2026 · Apt 620

    Close
  • Heat/hot water

    Entire building

    Apr 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt 412

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Dec 28, 2025 · Apt 323

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 16, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 8, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2024 · Apt 506

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2024 · Apt 507

    Close
  • Heat/hot water

    Entire building

    Jan 23, 2024 · Apt 412

    Close
  • Heat/hot water

    Entire building

    Jan 22, 2024 · Apt 513

    Close
  • Heat/hot water

    Entire building

    Dec 20, 2023 · Apt 417 AN

    Close
  • Heat/hot water

    Entire building

    Nov 27, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 26, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 25, 2023 · Apt 211

    Close
  • Heat/hot water

    Entire building

    Nov 25, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2023 · Apt 207

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2023 · Apt 417

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 24, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 6, 2023 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Feb 6, 2023 · Apt 206

    Close
  • Heat/hot water

    Entire building

    Feb 5, 2023 · Apt 620

    Close
  • Heat/hot water

    Entire building

    Feb 5, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 5, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 5, 2023 · Apt 204

    Close
  • Heat/hot water

    Entire building

    Feb 5, 2023 · Apt 308

    Close
  • Heat/hot water

    Entire building

    Feb 5, 2023 · Apt 206

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt SHELTE

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt 307

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt 206

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt 216

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 3, 2023 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hospital / health (I9)
Year built
1976
Floors
6
Residential units
—
Building area
64,415 ft²
Lot area
49,644 ft²
Zoning
R5
Community board
414
Council district
31
Block / lot
15908 / 7
Assessed value
$8,894,700
Landmark / historic district
No

HPD registration #431622, last renewed Oct 11, 2025.

Questions about 3-16 Beach 65 Street

Who owns 3-16 Beach 65 Street?

The owner of record in NYC Department of City Planning PLUTO data is Beach 65 LLC.

Does 3-16 Beach 65 Street have violations?

Yes. NYC HPD has recorded 21 housing violations at this property.

Is 3-16 Beach 65 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 3-16 Beach 65 Street built?

City records list 1976 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.