3-16 Beach 65 Street
Queens, NY 11692BBL 4-15908-0007Map
Owner of record: Beach 65 LLC
3-16 Beach 65 Street is a hospital / health built in 1976 in Queens, 11692. The owner of record is Beach 65 LLC. HPD has recorded 21 housing violations here, most recently on June 19, 2026.
- HPD violations
- 21
- DOB violations
- 134
- ECB violations
- 58
- HPD complaints
- 142
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 21
- CImmediately hazardous
Remove the illegal fastening consisting of self lockable panic bar installed south bulkhead door to roof from stairway b at public hall, 6th story, section at south
Jun 19, 2026
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at washbasin. in the 1st room from north located at b-room 417, 4th story, 2nd b-room from south at west
Dec 21, 2023 · Apt 417
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 227, 2nd story, 2nd apartment from east at south , section ''west''
Nov 24, 2023 · Apt 227
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 4, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the 1st entrance from east located at b-room 402, 4th story, 9th b-room from west at north
Oct 25, 2021 · Apt 402
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the room located at b-room 512, 5th story, 1st b-room from west at north
Jun 15, 2021 · Apt 512
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the room located at b-room 426, 4th story, 7th b-room from east at south
Jun 15, 2021 · Apt 426
Closed — Violation closed
Show 11 more ↓
- BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the room located at b-room 426, 4th story, 7th b-room from east at south
Jun 15, 2021 · Apt 426
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the room located at b-room 512, 5th story, 1st b-room from west at north
Jun 15, 2021 · Apt 512
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 1st room from north located at b-room 416, 4th story, 3rd b-room from west at north
Jun 14, 2021 · Apt 416
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall
May 5, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
May 5, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 5, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
May 5, 2021
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
May 5, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2021
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening a double cylinder key operated lock installed at the building entrance door.
Apr 7, 2020
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2015
Closed — Violation dismissed
DOB building violations · 134
- Elevator elevatorrequired
Due to a transformer exploding outside of the location. the elevator controller board was compromised.
Feb 14, 2023
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 15, 2017
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 18, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 1, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 1, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed
Show 40 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 19, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed
ECB violations · 58
- Class - 1
Failure to install grounding electrode conductor in accordance with section. observed in the main electrical rm no installation of electrode ground rod. ec 250.64, properly install ground electrode conductor
Apr 2, 2026 · Penalty $4,800
Active - Class - 1
Unapproved/unsafe/unsuitable electrical equipment, apparatus, materials, devices, appliances or wiring in use. observed in the office cubicles the use of flex cords to power also in the boiler rm electric wire
Apr 2, 2026 · Penalty $1,600
Active - Class - 1
Failure to protect conductor(s) against overcurrent per ec. observed in the elevator machine rm that the overcurrent protection is incorrectly sized. ec 240.4 must follow code., provide protection against overc
Apr 2, 2026 · Penalty $4,800
Active - Class - 1
Electrical work without a permit. observed on the ground floor the installation one hung electric heater. also one feeder ran from cafeteria panel to new panel location . checked dob now and biz no permit on fi
Apr 2, 2026 · Penalty $2,500
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings for summons 39142831h, file a certificate of correction
Feb 5, 2026 · Penalty $6,250
Active - Class - 3
Heat timer boiler control is defectiveýheat timer service tech required¨+apt#620 weather strip@apt door+@roof access door are required;correct violation+submit certificate of correction
Dec 19, 2025 · Penalty $500
Resolve - Class - 1
Failure to maintain building in code-compliant manner. observed non fire rated door at 1 floor level near staff lounge area corridor. potential fire hazard., repair and/replace
Mar 26, 2025 · Penalty $2,500
Active - Class - 1
Gas leak found on 2 inch gas valve as well as 2 inch gas piping in the gas meter room located on the main floor. as per pc 102.3 maintenance. installations, both existing and new, and parts thereof shall be mai
Mar 26, 2024 · Penalty $1,250
Resolve - Class - 2
I observed at the rear of the dryers on the first floor next to the sprinkler control room. cable assemblies(bx) unsupported and laying across gas and water piping and their metal support systems., secure/suppo
Oct 24, 2022
Resolve - Class - 1
Roper gripper do not close after opening up the governor electrical switch. this feature works on the other controller(cu). brake maintenance tag expired on 5/3/21. in car phone not working.
Oct 24, 2022 · Penalty $1,250
Resolve
Show 40 more ↓
- Class - 2
At 6th fl, smoke door near 616/628 rms, at 5th fl . smoke door near 528 rm, at 3rd fl smoke door near 306/314 rms, at 2nd fl, electrical closet door, smoke door near 218/206 rms & first fl, smoke doors near lob
Oct 24, 2022
Resolve - Class - 2
I observed in the elevator machine a gfci receptacle not operating as designed when tested the gfci did not trip as required. also noted in the ground floor kitchen a convenience receptacle installed within 6 f
Oct 24, 2022 · Penalty $1,200
Resolve - Class - 1
I observed in the kitchen the improper termination of energized electrical wires extending from a floor mounted junction box. this is an immediate shock hazard as the box is now accessible to personnel., provid
Oct 24, 2022 · Penalty $1,600
Resolve - Class - 2
I observed in the lobby entrance and the rear conference room the installation of flexible cords in a raceway this is not permitted under ec 400.8. flexible cords shall not be installed in a raceway as permanen
Oct 24, 2022
Resolve - Class - 2
Brake maintenance tag expired on 4/22/20. in car phone not working.
Oct 24, 2022
Resolve - Class - 1
Failure to maintain building in code compliant manner.observed in kitchen on main floor gas piping shut not locked or capped or plugged makes hazardous condition gas now can be instroduced into room.remedy:repa
Oct 24, 2022 · Penalty $312
Resolve - Class - 2
At ground level, main entrance doors, library rm, kitchen exit door and corridor smoke doors, illegal kitchen stops and bolts were installed, blocking the normal flow of people in emergency case, provide legal
Oct 24, 2022
Resolve - Class - 1
I observed on the roof a conduit exiting the lower wall broken with exposed conductors, also noted the junction boxes feeding the lights with cover with construction tape and with exposed conductors. the flexib
Oct 24, 2022 · Penalty $400
Resolve - Class - 2
Combustion air fan to be interlocked with boiler ,remote switch required at 2nd door to boiler room,correct violation and send in certificate of correction
Oct 1, 2021
Resolve - Class - 2
Combustion air fans to be interlocked with boiler & missing switch at 2nd door for boiler.correct violation & send in certificate of correction
Oct 1, 2021
Resolve - Class - 2
Combustion air fan to be interlocked with water heater,fan by wtr htr cannot run continous need remote switch at 2nd door to boiler room,correct violation & send in certificate of correction
Oct 1, 2021
Resolve - Class - 2
Three improper glass fuse on the controller. wires hanging off the terminal not cap replace wire on the terminal.
Sep 24, 2021
Resolve - Class - 2
One improper glass fuse on the controller. wires handing off the terminal not cap replace wire on the terminal.
Sep 24, 2021
Resolve - Class - 2
Observed: fire proof self-closing at corridor from 6 fl to 1 floor , not self-closing properly due overlapping door leaves, excessive rubbing on saddle or knocking of door frame. also exit door at first floor s
Aug 19, 2021
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application install dlm and perfor
Feb 8, 2021
Resolve - Class - 2
B254,50a,50b. peerless rh 1995 boiler: 50a-fresh air fans to be interlocked with boiler; 50b-cap or plug open piping. rmdy: correct all violating conditions and submit certificate of correction.
Aug 15, 2018 · Penalty $625
Resolve - Class - 2
B254,50a,50b. ao smith gm08svwp boiler: 50a-fresh air fans to be interlocked with boiler; 50b-cap or plug open piping; rmdy: correct all violating conditions and submit certificate of correction.
Aug 15, 2018 · Penalty $625
Resolve - Class - 2
B254,50a,50b. peerless fh 2394 boiler: 50a-fresh air fans to be inter locked with boiler; 50b-cap or plug open piping. rmdy: correct all violating conditions and submit certificate of correction.
Aug 15, 2018 · Penalty $625
Resolve - Class - 2
50a)manufacturers rating tag for moduler boiler missing. b)lights in boiler room not working. correct all violating conditions and submit a certificate of correction.
Apr 20, 2018 · Penalty $312
Resolve - Class - 2
50a)manufacturers rating tag or modular boiler missing. correct all violating conditions and submit a certificate of correction.
Apr 20, 2018 · Penalty $312
Resolve - Class - 2
Corroded flue pipe, defective relief valve, missing manual reset aquastat. correct all violating conditions and submit a certificate of correction.
Apr 20, 2018 · Penalty $625
Resolve - Class - 2
Failure to maintain building walls or appurtenances.noted:observed at roof level,perimeter fence is in disrepair,at various locations throughout,some sections of the chain links missing and being held with thin
Jan 25, 2018
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35272442y issued on 07/17/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner.
Nov 17, 2017 · Penalty $800
Resolve - Class - 2
Failure to provide ground fault circuit interrupter.observed in laundry room existing gfci receptacle outlets not properly wired,thereby notproviding proper gfci protection.gfci outlets were checked with gfci p
Jul 17, 2017 · Penalty $400
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner.(1)observed in gas meter room gas leaking from cracked 90 degrees elbow on gas meter.utility complany shut off gas to the bldg."photos taken".rem:repair &/or re
Jul 17, 2017 · Penalty $1,000
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. at the time of my inspection i observed in the fire sprinkler control room no ball drip(automaic drain) installed on the sprinkler piping as required by the nf
Jan 27, 2017 · Penalty $500
Resolve - Class - 1
Failure to maintain bldg in code complaint manner. observed on exterior to connect ball check value capped off. req'd to be open. remedy: remove or replace.
Aug 30, 2016 · Penalty $1,000
Resolve - Class - 1
Sec. 408.2 & 411.1 misc violation. observed on 8/30/16 @ 12:35pm in gas meter room & comm. laudry room gas (future) connection exits on house piping & residential gas flex's installed on commercial/gas 1st fl.
Aug 30, 2016 · Penalty $1,600
Resolve - Class - 2
Sec. 27-345 failure to maintain bldg code compliant. no fire stopping per bc 712.3;27-345. noted: at 1st fl electric meter room,missing fire stopping w/3 penetrations in cmu block wall to concealed space above
Feb 23, 2016 · Penalty $250
Resolve - Class - 2
15h7,70o02,24i10,100u5,17h11,12q3,10h11,19x10,35q7,40o2,100o2,52o2. 100u5-perform and file annual brake test; 12q3-provide top of car; 100 o2-clean hoistway.
Feb 18, 2016
Resolve - Class - 2
70o2,100u5,17h11,12q3,10h11,19x10,35q7,42o01,40o2,100o2,52o2. 100u5-perform and file annual brake test; 12q3-provide top of car; 421o01-clean and adjsut controller; 100o2-clean hoistway.
Feb 18, 2016
Resolve - Class - 1
Failure to maintain bldg. noted: exterior facade at various areas concrete spalling exposing reinforcement steel, pcs missing/loose. remedy:make safe.
Aug 12, 2013 · Penalty $10,000
Resolve - Class - 1
Failure to maintain bldg walls. note: spalling & cracking concrete at various areas of facade concrete (floor ribbons) primarily on south,east,west. facades fls 1-6. remedy: maintain bldg wall.
Jun 5, 2013 · Penalty $2,500
Resolve - Class - 1
Operation of a place of assembly w/o a current c of o. noted: observedat time of inspection at 1st fl on the dining room approx 90 chairs w/tables & fully occupied. premises under c of o #401550353 allowed max
Apr 27, 2013 · Penalty $1,600
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. observed at time ofinspection observed: 1) at exposure #1,2,3 & 4 of exterior mansonry wall,spalling of the concrete observed & loose pieces in several locatio
Apr 27, 2013 · Penalty $1,000
Resolve - Non-hazardous
17h11.10h11.85v10.59q03.
Mar 25, 2008 · Penalty $350
Resolve - Non-hazardous
17h11.10h11.85u15
Mar 25, 2008 · Penalty $350
Resolve - Non-hazardous
51f11,46h12, (51)repair worm and gears f(46)replace hoist cables.
Mar 29, 2000
Resolve - Non-hazardous
50y11,73o2.
May 10, 1999
Resolve - Non-hazardous
50y11,73o2.
May 10, 1999
Resolve
Complaints
- Heat/hot water
Entire building
Oct 22, 2026 · Apt 410
Open - Heat/hot water
Entire building
Oct 22, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 16, 2026 · Apt 222
Close - Heat/hot water
Entire building
Jun 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 2, 2026 · Apt 620
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 412
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 28, 2025 · Apt 323
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2024 · Apt 506
Close - Heat/hot water
Entire building
Feb 1, 2024 · Apt 507
Close - Heat/hot water
Entire building
Jan 23, 2024 · Apt 412
Close - Heat/hot water
Entire building
Jan 22, 2024 · Apt 513
Close - Heat/hot water
Entire building
Dec 20, 2023 · Apt 417 AN
Close - Heat/hot water
Entire building
Nov 27, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 25, 2023 · Apt 211
Close - Heat/hot water
Entire building
Nov 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2023 · Apt 207
Close - Heat/hot water
Entire building
Nov 24, 2023 · Apt 417
Close - Heat/hot water
Entire building
Nov 24, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
May 24, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2023 · Apt 1
Close - Heat/hot water
Entire building
Feb 6, 2023 · Apt 206
Close - Heat/hot water
Entire building
Feb 5, 2023 · Apt 620
Close - Heat/hot water
Entire building
Feb 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2023 · Apt 204
Close - Heat/hot water
Entire building
Feb 5, 2023 · Apt 308
Close - Heat/hot water
Entire building
Feb 5, 2023 · Apt 206
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt SHELTE
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt 307
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt 206
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt 216
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hospital / health (I9)
- Year built
- 1976
- Floors
- 6
- Residential units
- —
- Building area
- 64,415 ft²
- Lot area
- 49,644 ft²
- Zoning
- R5
- Community board
- 414
- Council district
- 31
- Block / lot
- 15908 / 7
- Assessed value
- $8,894,700
- Landmark / historic district
- No
HPD registration #431622, last renewed Oct 11, 2025.
Questions about 3-16 Beach 65 Street
Who owns 3-16 Beach 65 Street?
The owner of record in NYC Department of City Planning PLUTO data is Beach 65 LLC.
Does 3-16 Beach 65 Street have violations?
Yes. NYC HPD has recorded 21 housing violations at this property.
Is 3-16 Beach 65 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 3-16 Beach 65 Street built?
City records list 1976 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.