175 Beach 60 Street
Queens, NY 11692BBL 4-15903-0032Map
Owner of record: Plaza Homes LLC
175 Beach 60 Street is a walk-up apartment building built in 2007 in Queens, 11692. It has 3 residential units across 3 floors. The owner of record is Plaza Homes LLC. HPD has recorded 365 housing violations here, most recently on June 25, 2026. 17 of the 50 most recent violations are still open.
- HPD violations
- 365
- DOB violations
- 3
- ECB violations
- 13
- HPD complaints
- 281
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 365
- BHazardous
Properly repair with similar material the broken or defective wood floor at public hall, 1st story
Jun 25, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Jun 11, 2025 · Apt 2
Open — Nov certified late - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Jun 11, 2025
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective ceiling light fixture at public hall, 2nd story
Jun 11, 2025
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Jun 11, 2025 · Apt 2
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Apr 24, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color header at window casing in the 2nd room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Apr 16, 2025 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at window header in the 2nd room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Apr 16, 2025 · Apt 2
Closed — Violation closed
Show 40 more ↓
- BHazardous
Refit door in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Apr 16, 2025 · Apt 2
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2, 2nd story, 1st apartment from west at north
Apr 16, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Apr 16, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls at north and east in the 3rd room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Apr 16, 2025 · Apt 2
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the mildew at caulking at west, south and east wall in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Apr 16, 2025 · Apt 2
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Apr 16, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 5th room from east located at apt 2, 2nd story, 1st apartment from east at south
Oct 17, 2024 · Apt 2
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household item at public hall, 3rd story
Oct 17, 2024
Open — Not complied with - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Oct 17, 2024 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at cellar
Oct 17, 2024
Open — Not complied with - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling at boiler room
Oct 17, 2024
Open — Not complied with - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at cellar
Oct 17, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Oct 17, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at cellar
Oct 17, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jul 17, 2024
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jul 17, 2024
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective ventilation in the 1st bathroom from east located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall. in the bathroom located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Refit lower west window sashes. in the 3rd room from east at north located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection drain line at sink. in the kitchen located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood cabinet at south wall. in the kitchen located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling and west wall. in the 1st bathroom from east located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall. in the 3rd room from east at south located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electric outlet at south wall.. in the 3rd room from east at south located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 17, 2024
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling. in the 3rd room from east at south located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at washbasin. in the 1st bathroom from east located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak over north wall. in the 2nd room from east at north located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 2nd room from east at north located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in at washbasin. in the bathroom located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Jul 17, 2024
Open — Not complied with - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of at south wall electric outlet. in the 3rd room from east at south located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash. in the 3rd room from east at north located at apt 1floor, 2nd story, 1st apartment from west at north
Jul 17, 2024 · Apt 1FLOOR
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 2, 2nd story
Jun 5, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the 5th room from east located at apt 2, 2nd story, 1st apartment from west at north
Mar 11, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective hard wood floor in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 11, 2024 · Apt 2
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 15 sqft of mold at ceiling at basement original violation 16357784 issued 03-nov-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Nov 3, 2023
Closed — Violation closed - ANon-hazardous
Properly secure the loose or hanging light fixture at ceiling at public hall, 2nd story
Nov 3, 2023
Open — Not complied with
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 26, 2014
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Nov 26, 2001
V%*-dob violation - dismissed - Construction other optional
C-construction other optional
Mar 25, 1999
Dob violation - dismissed
ECB violations · 13
- Class - 1
Unlawful acts.failure to comply with commissioner's orders.records indicate no app made to correct or certify ebc # 35634358r & #35494102l.remedy:comply with commissioner's orders.
Jan 3, 2022
Resolve - Class - 1
Unlawful act.failure to comply with an order of the commissioner.failure to correct and certify summons#35484102l opened/uncovered boxes with live wires exposed,panels without covers,hanging light fixtures with
Nov 13, 2021
Resolve - Class - 1
Unlawful act. failure to comply with order of commissioner.failure to correct and certify summons #35494102l used of unapproved unsafe unsuitable electrical equipment apparatus material devices appliances or wi
Sep 16, 2021
Resolve - Class - 1
Unlawful acts - failure to comply with commissioner's orders.records indicate no app was made to correct or certify ecb #35494102l.remedy:comply with commissioner's orders.
Jul 24, 2021
Resolve - Class - 1
Unlawful act.failure to comply w/an order of the commissioner.failure to correct & certify summons #354941102l & summons #3554748y remedy: comply w/code
Jun 19, 2021
Resolve - Class - 1
Unlawful acts failure to comply with an order of the commissioner.records indicate no application was made to certify or correct ecb #35494102l.remedy:comply with commissioner's orders.
May 7, 2021
Resolve - Class - 1
Unapproved/unsafe/unsuitable electrical equipments,apparatus,materials,devices,appliances,or wiring in use. throughout the entire basement there are open/uncovered junction boxes w/ live wires exposed,open circ
Dec 2, 2020 · Penalty $400
Resolve - Class - 1
Due to hurricane sandy, 3 boilers & 3 hot water heaters were replaced.under an op 128 this is not covered under ordinary plumbing work.work needs to be filed under an laa for proper coverage.
Sep 30, 2013
Resolve - Hazardous
Failure to safeguard pulbic and property affected by construction operations.defects noted:1)job site has foundation and walls in place(approx size of hole is 20' wide x 40' long by 4' to 6' foot deep) 2)job
Jul 9, 2003 · Penalty $1,000
Resolve - Hazardous
Failure to provide 8' fence where required during excavation operations.remedy:stop all work immediately except to provide fence
Apr 24, 2003 · Penalty $480
Resolve
Show 3 more ↓
- Hazardous
Work w/o a permit. work noted building demolished to foundation remedy : stop all work obtain all necessary permits call best squard @ 802 3710 for info to resume work
Jan 27, 2003 · Penalty $800
Resolve - Hazardous
Failure to safeguard public hazard noted building demolished to foundation leaving site with construction debris open to public with no guard rail or construction fence remedy : provide protection to rebuild
Jan 27, 2003
Resolve - Non-hazardous
Failure to maintain: front side of the house above open porch allumi- num awning all pieces loosing and separating from metal studs & hang- ing. also few pieces felt on ground. remedy: remove hanging and loose
Mar 25, 1999 · Penalty $2,500
Resolve
Complaints
- Appliance
Electric/gas range
Sep 24, 2026 · Apt 3RDFLO
Open - Appliance
Electric/gas range
Sep 22, 2026 · Apt 3FLOOR
Open - Appliance
Electric/gas range
Aug 24, 2026 · Apt 2
Close - Paint/plaster
Ceiling
Aug 24, 2026 · Apt 2
Close - Paint/plaster
Wall
Aug 24, 2026 · Apt 2
Close - Unsanitary condition
Mold
Jun 19, 2026 · Apt 2
Close - Paint/plaster
Wall
Jun 19, 2026 · Apt 2
Close - Flooring/stairs
Floor
Jun 19, 2026 · Apt 2
Close - Unsanitary condition
Mold
Aug 1, 2025 · Apt 2
Close - Paint/plaster
Wall
Apr 15, 2025 · Apt 2
Close
Show 40 more ↓
- Unsanitary condition
Mold
Apr 15, 2025 · Apt 2
Close - Flooring/stairs
Floor
Apr 15, 2025 · Apt 2
Close - Door/window
Door frame
Apr 15, 2025 · Apt 2
Close - Paint/plaster
Ceiling
Apr 15, 2025 · Apt 2
Close - Unsanitary condition
Pests
Dec 30, 2024 · Apt 2
Close - Unsanitary condition
Pests
Dec 30, 2024 · Apt 2
Close - Paint/plaster
Wall
Jul 15, 2024 · Apt 1FLOOR
Close - Water leak
Damp spot
Jul 15, 2024 · Apt 1FLOOR
Close - Plumbing
Basin/sink
Jul 15, 2024 · Apt 1FLOOR
Close - General
Ventilation system
Jul 15, 2024 · Apt 1FLOOR
Close - Plumbing
Basin/sink
Jul 15, 2024 · Apt 1FLOOR
Close - Door/window
Window frame
Jul 15, 2024 · Apt 1FLOOR
Close - Paint/plaster
Ceiling
Jul 15, 2024 · Apt 1FLOOR
Close - Electric
Wiring
Jul 15, 2024 · Apt 1FLOOR
Close - Door/window
Window frame
Jul 15, 2024 · Apt 1FLOOR
Close - Plumbing
Basin/sink
Jul 15, 2024 · Apt 1FLOOR
Close - General
Cabinet
Jul 15, 2024 · Apt 1FLOOR
Close - Water leak
Heavy flow
Jul 15, 2024 · Apt 1FLOOR
Close - Paint/plaster
Wall
Jul 15, 2024 · Apt 1FLOOR
Close - Unsanitary condition
Pests
May 31, 2024 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
May 31, 2024 · Apt 2
Close - Paint/plaster
Wall
May 31, 2024 · Apt 2
Close - Unsanitary condition
Pests
May 31, 2024 · Apt 2
Close - Unsanitary condition
Pests
May 31, 2024 · Apt 2
Close - General
Cabinet
May 31, 2024 · Apt 2
Close - Flooring/stairs
Floor
May 31, 2024 · Apt 2
Close - Appliance
Electric/gas range
Jan 2, 2024 · Apt 2
Close - General
Cabinet
Dec 28, 2023 · Apt 2
Close - Paint/plaster
Wall
Dec 28, 2023 · Apt 2
Close - Appliance
Electric/gas range
Dec 28, 2023 · Apt 2
Close - Appliance
Electric/gas range
Dec 27, 2023 · Apt 2
Close - General
Cooking gas
Nov 21, 2023 · Apt 3RDFLO
Close - Electric
Lighting
Nov 21, 2023 · Apt 3RDFLO
Close - Safety
Window guard broken/missing
Nov 3, 2023 · Apt 3
Close - Plumbing
Water supply
Nov 3, 2023 · Apt 3
Close - Plumbing
Water supply
Nov 3, 2023 · Apt 3
Close - Safety
Sprinkler
Nov 3, 2023 · Apt BLDG
Close - Electric
Lighting
Nov 3, 2023 · Apt BLDG
Close - Flooring/stairs
Floor
Nov 3, 2023 · Apt BLDG
Close - Unsanitary condition
Mold
Nov 3, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2007
- Floors
- 3
- Residential units
- 3
- Building area
- 3,480 ft²
- Lot area
- 2,000 ft²
- Zoning
- R6
- Community board
- 414
- Council district
- 31
- Block / lot
- 15903 / 32
- Assessed value
- $52,680
- Landmark / historic district
- No
HPD registration #431632, last renewed Jul 18, 2025.
Questions about 175 Beach 60 Street
Who owns 175 Beach 60 Street?
The owner of record in NYC Department of City Planning PLUTO data is Plaza Homes LLC.
Does 175 Beach 60 Street have violations?
Yes. NYC HPD has recorded 365 housing violations at this property.
Is 175 Beach 60 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 175 Beach 60 Street built?
City records list 2007 as the year it was built.
How many apartments are in 175 Beach 60 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.