roofy

167 Beach 59 Street

Queens, NY 11692BBL 4-15902-0142Map

Owner of record: Floyd, Ronald

167 Beach 59 Street is a two-family home built in 2000 in Queens, 11692. It has 2 residential units across 2 floors. The owner of record is Floyd, Ronald. HPD has recorded 50 housing violations here, most recently on July 22, 2025. 45 of the 50 most recent violations are still open.

HPD violations
50
DOB violations
0
ECB violations
0
HPD complaints
67

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jul 22, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 50

  • B

    Repair the broken or defective connection drain line at sink. in the kitchen located at apt 2floor, 2nd story, 1st apartment from south at west

    Jul 22, 2025 · Apt 2FLOOR

    Open — Nov sent out
  • B

    Provide an adequate supply of gas to the fixtures at gas range. in the kitchen located at apt 2floor, 2nd story, 1st apartment from south at west

    Jul 22, 2025 · Apt 2FLOOR

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective mechanical ventilation at ceiling. in the 1st bathroom from north located at apt 2floor, 2nd story, 1st apartment from south at west

    Jul 22, 2025 · Apt 2FLOOR

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at north wall. in the kitchen located at apt 2floor, 2nd story, 1st apartment from south at west

    Jul 22, 2025 · Apt 2FLOOR

    Open — Nov sent out
  • B

    Provide adequate supply of cold water for the fixtures at washbasin in the 2nd bathroom from north located at apt 2floor, 2nd story, 1st apartment from south at west

    Jul 22, 2025 · Apt 2FLOOR

    Open — Nov sent out
  • B

    Provide adequate supply of hot water for the fixtures at washbasin. in the 2nd bathroom from north located at apt 2floor, 2nd story, 1st apartment from south at west

    Jul 22, 2025 · Apt 2FLOOR

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink. in the kitchen located at apt 2floor, 2nd story, 1st apartment from south at west

    Jul 22, 2025 · Apt 2FLOOR

    Open — Nov sent out
  • C

    Properly repair the broken or defective mortise lock at security gate at street level entrance , 1st story

    Oct 12, 2019

    Open — Nov sent out
  • B

    Properly repair the broken or defective mechanical fan at ceiling in the bathroom located at apt 2ndfl, 2nd story, 2nd apartment from south at west

    Oct 12, 2019 · Apt 2NDFL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceilings in the kitchen located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Oct 12, 2019 · Apt 2NDFL

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceilings in the 1st room from north at west located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Oct 12, 2019 · Apt 2NDFL

    Open — Nov sent out
  • C

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ,, in the bathroom located at apt 2ndfl, 2nd story, 2nd apartment from south at west

    Oct 12, 2019 · Apt 2NDFL

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceilings in the 3rd room from north located at apt 2ndfl, 2nd story, 1st apartment from south at west

    Oct 12, 2019 · Apt 2NDFL

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Aug 17, 2019 · Apt 1

    Open — Nov sent out
  • B

    Abate the nuisance consisting of high weeds at rear yard, at west

    Jun 13, 2019

    Open — Nov sent out
  • A

    Properly repair the broken or defective wall cabinet doors in the kitchen located at apt 1, 1st story

    Jun 13, 2019 · Apt 1

    Open — Nov sent out
  • B

    Replace with new the broken or defective base cabinet bottom under sink in the kitchen located at apt 1, 1st story

    Jun 13, 2019 · Apt 1

    Open — Nov sent out
  • B

    Replace with new the missing fuse box door in the private hallway located at apt 1, 1st story

    Jun 13, 2019 · Apt 1

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and north wall in the private hallway located at apt 1, 1st story

    Jun 13, 2019 · Apt 1

    Open — Nov sent out
  • A

    Properly repair the broken or defective electrical outlet at south wall in the 2nd room from east located at apt 1, 1st story, 1st apartment from west at north

    Jun 13, 2019 · Apt 1

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color at north wall in the 2nd room from east at south located at apt 1, 1st story, 1st apartment from west at north

    Jun 13, 2019 · Apt 1

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    May 28, 2019

    Open — Info nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceilings (master bedroom) in the 2nd room from north at west located at apt 2flr, 2nd story, 1st apartment from south at west

    May 26, 2019 · Apt 2FLR

    Open — Certification postponment denied
  • B

    Replace with new the broken or defective base cabinet at washbasin in the 2nd bathroom from north at west located at apt 2flr, 2nd story, 1st apartment from south at west

    May 26, 2019 · Apt 2FLR

    Open — Certification postponment denied
  • B

    Properly repair the broken or defective mechanical vent at ceiling in the 1st bathroom from north located at apt 2flr, 2nd story, 1st apartment from south at west

    May 26, 2019 · Apt 2FLR

    Open — Certification postponment denied
  • B

    Properly repair with similar material the broken or defective metal deck at west located at apt 2flr, 2nd story, 1st apartment from south at west

    May 26, 2019 · Apt 2FLR

    Open — Certification postponment denied
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceilings (living room) in the 1st room from north at west located at apt 2flr, 2nd story, 1st apartment from south at west

    May 26, 2019 · Apt 2FLR

    Open — Certification postponment denied
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color all walls and ceilings in the kitchen located at apt 2flr, 2nd story, 1st apartment from south at west

    May 26, 2019 · Apt 2FLR

    Open — Certification postponment denied
  • B

    Replace with new the broken or defective base cabinet to wash basin in the 1st bathroom from north located at apt 2flr, 2nd story, 1st apartment from south at west

    May 26, 2019 · Apt 2FLR

    Open — Certification postponment denied
  • C

    Repair the leaky and/or defective water supply pipe to wash basin in the 1st bathroom from north located at apt 2flr, 2nd story, 1st apartment from south at west

    May 26, 2019 · Apt 2FLR

    Closed — Violation closed
  • B

    Replace with new the broken or defective base cabinet at wash basin in the 1st bathroom from north located at apt 2flr, 2nd story, 1st apartment from south at west

    May 26, 2019 · Apt 2FLR

    Open — Certification postponment denied
  • B

    Abate the infestation consisting of mice located at apt 2flr, 2nd story, 1st apartment from south at west

    May 26, 2019 · Apt 2FLR

    Open — Certification postponment denied
  • B

    Properly repair with similar material the broken or defective ceramic tiled wall at north and west walls in the 2nd bathroom from north at west located at apt 2flr, 2nd story, 1st apartment from south at west

    May 26, 2019 · Apt 2FLR

    Open — Certification postponment denied
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling (master bedroom) in the 2nd room from north at west located at apt 2flr, 2nd story, 1st apartment from south at west

    May 26, 2019 · Apt 2FLR

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... mold at celingt and northwall( 2 square feet)(master bedroom) in the 2nd room from north at west located at apt 2flr, 2nd story, 1st apartment from south at west

    May 26, 2019 · Apt 2FLR

    Closed — Violation closed
  • C

    Remove all obstructions and repair all defects in drain to washbasin in room north west -2 in the bathroom located at apt 2flr, 2nd story, 1st apartment from south at west

    May 26, 2019 · Apt 2FLR

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... mold at celingt and northwall( 2 square feet)(master bedroom) in the 2nd room from north at west located at apt 2flr, 2nd story, 1st apartment from south at west original violation 13091226 issued 26-may-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    May 26, 2019 · Apt 2FLR

    Open — First no access to re- inspect violation
  • B

    Properly repair the broken or defective mortise lock installed in wrought iron gate at entrance door to building. in the entrance located at apt 2flr, 1st story

    May 26, 2019 · Apt 2FLR

    Open — Certification postponment denied
  • B

    Replace with new the broken or defective wood cabinet under sink in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    May 17, 2019 · Apt 1

    Open — Nov sent out
  • B

    Replace with new the missing electric fuse box cover at north wall in the private hallway located at apt 1, 1st story, 1st apartment from west at north

    May 17, 2019 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the private hallway located at apt 1, 1st story, 1st apartment from west at north

    May 17, 2019 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the broken or defective electric outlet at south wall in the 3rd room from east at north located at apt 1, 1st story, 1st apartment from west at north

    May 17, 2019 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color north wall in the 3rd room from east at south located at apt 1, 1st story, 1st apartment from west at north

    May 17, 2019 · Apt 1

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over in the 4th room from north located at apt 2, 2nd story

    Dec 21, 2011 · Apt 2

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over in the 1st room from north at east located at apt 2, 2nd story

    Dec 21, 2011 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & walls in the 4th room from north located at apt 2, 2nd story

    Dec 21, 2011 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & walls in the 1st room from north at east located at apt 2, 2nd story

    Dec 21, 2011 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and north wall in the 1st bedroom from east located at apt 2fl, 2nd story

    Jul 12, 2010 · Apt 2FL

    Open — Nov sent out
  • B

    Abate the nuisance consisting of concealed water leak at ceiling in the 1st bedroom from east located at apt 2fl, 2nd story

    Jul 12, 2010 · Apt 2FL

    Open — Nov sent out
  • B

    Abate the nuisance consisting of bedbugs in the entire apartment located at apt 2fl, 2nd story

    Jul 12, 2010 · Apt 2FL

    Open — Nov sent out

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Plumbing

    Basin/sink

    Jul 18, 2025 · Apt 2FLOOR

    Close
  • Appliance

    Electric/gas range

    Jul 18, 2025 · Apt 2FLOOR

    Close
  • General

    Ventilation system

    Jul 18, 2025 · Apt 2FLOOR

    Close
  • Electric

    Outlet/switch

    Jul 18, 2025 · Apt 2FLOOR

    Close
  • Plumbing

    Water supply

    Jul 18, 2025 · Apt 2FLOOR

    Close
  • Unsanitary condition

    Mold

    Jun 25, 2025 · Apt 2FLOOR

    Close
  • General

    Cabinet

    May 5, 2025 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Mold

    May 5, 2025 · Apt 2NDFLO

    Close
  • Flooring/stairs

    Floor

    May 5, 2025 · Apt 2NDFLO

    Close
  • Plumbing

    Water supply

    May 5, 2025 · Apt 2NDFLO

    Close
Show 40 more ↓
  • Paint/plaster

    Ceiling

    May 5, 2025 · Apt 2NDFLO

    Close
  • Door/window

    Window frame

    May 5, 2025 · Apt 2NDFLO

    Close
  • Appliance

    Electric/gas range

    Oct 18, 2022 · Apt FL2

    Close
  • Water leak

    Slow leak

    Oct 10, 2019 · Apt 1

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 23, 2019 · Apt 2NDFL

    Close
  • Plumbing

    Toilet

    Sep 23, 2019 · Apt 2NDFL

    Close
  • Water leak

    Slow leak

    Sep 23, 2019 · Apt 2NDFL

    Close
  • Paint/plaster

    Wall

    Sep 23, 2019 · Apt 2NDFL

    Close
  • Unsanitary condition

    Pests

    Sep 23, 2019 · Apt 2NDFL

    Close
  • Plumbing

    Toilet

    Sep 23, 2019 · Apt 2NDFL

    Close
  • General

    Cabinet

    Sep 23, 2019 · Apt 2NDFL

    Close
  • Paint/plaster

    Wall

    Sep 23, 2019 · Apt 2NDFL

    Close
  • Paint/plaster

    Ceiling

    Sep 23, 2019 · Apt 2NDFL

    Close
  • Unsanitary condition

    Mold

    Sep 23, 2019 · Apt 2NDFL

    Close
  • Door/window

    Door

    Sep 23, 2019 · Apt 2NDFL

    Close
  • Paint/plaster

    Ceiling

    Jul 30, 2019 · Apt 1

    Close
  • General

    Cabinet

    Jun 10, 2019 · Apt 1

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 10, 2019 · Apt 1

    Close
  • Electric

    Outlet/switch

    Jun 10, 2019 · Apt 1

    Close
  • Electric

    Wiring

    Jun 10, 2019 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Jun 10, 2019 · Apt 1

    Close
  • Paint/plaster

    Wall

    Jun 10, 2019 · Apt 1

    Close
  • Electric

    Outlet/switch

    May 15, 2019 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    May 15, 2019 · Apt 1

    Close
  • Unsanitary condition

    Mold

    May 7, 2019 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    May 5, 2019 · Apt 2FLR

    Close
  • Paint/plaster

    Wall

    May 5, 2019 · Apt 2FLR

    Close
  • Paint/plaster

    Wall

    May 5, 2019 · Apt 2FLR

    Close
  • Paint/plaster

    Wall

    May 5, 2019 · Apt 2FLR

    Close
  • Unsanitary condition

    Mold

    May 5, 2019 · Apt 2FLR

    Close
  • Plumbing

    Basin/sink

    May 5, 2019 · Apt 2FLR

    Close
  • Unsanitary condition

    Mold

    May 5, 2019 · Apt 2FLR

    Close
  • Paint/plaster

    Wall

    May 5, 2019 · Apt 2FLR

    Close
  • Unsanitary condition

    Pests

    May 5, 2019 · Apt 2FLR

    Close
  • Door/window

    Door

    May 5, 2019 · Apt 2FLR

    Close
  • General

    Locks

    Nov 5, 2013 · Apt 2FLR

    Close
  • Plumbing

    Water supply

    Nov 5, 2013 · Apt 2FLR

    Close
  • Heating

    Heat related

    Nov 23, 2012 · Apt 2FLR

    Close
  • General

    Doors

    Nov 25, 2011 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Nov 25, 2011 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B1)
Year built
2000
Floors
2
Residential units
2
Building area
2,052 ft²
Lot area
2,450 ft²
Zoning
R6
Community board
414
Council district
31
Block / lot
15902 / 142
Assessed value
$50,760
Landmark / historic district
No

Questions about 167 Beach 59 Street

Who owns 167 Beach 59 Street?

The owner of record in NYC Department of City Planning PLUTO data is Floyd, Ronald.

Does 167 Beach 59 Street have violations?

Yes. NYC HPD has recorded 50 housing violations at this property.

Is 167 Beach 59 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 167 Beach 59 Street built?

City records list 2000 as the year it was built.

How many apartments are in 167 Beach 59 Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.