301 Beach 54 Street
Queens, NY 11692BBL 4-15892-0001Map
Owner of record: NYC Housing Authority
301 Beach 54 Street is an elevator apartment building built in 1964 in Queens, 11692. It has 418 residential units across 6 floors. The owner of record is NYC Housing Authority. HPD has recorded 22 housing violations here, most recently on October 15, 2014. 22 of the 22 most recent violations are still open.
- HPD violations
- 22
- DOB violations
- 80
- ECB violations
- 44
- HPD complaints
- 1
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling 1st closet from west at north wall ceiling in the 1st room from east at south located at apt 2a, 2nd story, 1st apartment from north at east
Oct 15, 2014 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the 1st room from east at south, the 2nd room from east at north, the bathroom , the private hallway , the foyer located at apt 2a, 2nd story, 1st apartment from north at east
Oct 15, 2014 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from north at west located at apt 3a, 3rd story, apartment at west
Jan 22, 2014 · Apt 3A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... and mildew at ceiling in the bathroom located at apt 3a, 3rd story, apartment at west
Jan 22, 2014 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair the broken or defective lower window sash in the 1st room from north at west located at apt 3a, 3rd story, apartment at west
Jan 22, 2014 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation .. 2nd riser from east at south wall, 1st radiator from east at south wall in the 4th room from east located at apt 3a, 3rd story, 1st apartment from north at east
Oct 30, 2008 · Apt 3A
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective sheetrock south wall in the 4th room from east located at apt 3a, 3rd story, 1st apartment from north at east
Oct 30, 2008 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 3rd room from east at north, the 1st room from east at north, the 1st room from east at south, the private hallway , the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Oct 30, 2008 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from east at south wall in the 4th room from east located at apt 3a, 3rd story, 1st apartment from north at east
Oct 30, 2008 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , 1st riser from south at west wall in the bathroom located at apt 6a, 6th story, 1st apartment from south at west
Jan 26, 2005 · Apt 6A
Open — Nov sent out
Show 12 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , west wall, north wall, ceiling in the bathroom located at apt 6a, 6th story, 1st apartment from south at west
Jan 26, 2005 · Apt 6A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , 1st door frame from north at east wall, 1st door from north at east wall, 1st closet from east at south wall door frame in the foyer located at apt 6a, 6th story, 1st apartment from south at west
Jan 26, 2005 · Apt 6A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , 1st radiator from south at west wall in the 2nd room from east at south located at apt 6a, 6th story, 1st apartment from south at west
Jan 26, 2005 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color , north wall, ceiling in the kitchen located at apt 6a, 6th story, 1st apartment from south at west
Jan 26, 2005 · Apt 6A
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing at 6 sty east apt 6b ms king. , section '' ''
Feb 1, 1996 · Apt 6B
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder lock 5 sty apt 5e entrance door. located at apt 5e
Jun 26, 1989 · Apt 5E
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective 5 sty apt 5e defective ms mclead. located at apt 5e
Jun 26, 1989 · Apt 5E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north wall 5 sty apt 5e north east room. located at apt 5e
Jun 26, 1989 · Apt 5E
Open — Nov sent out - BHazardous
Properly repair the broken or defective lock street entrance door to 1 sty pub hall.
Jun 26, 1989
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key lock on entrance door to 4 sty apt 4c. , section '' ''
Mar 27, 1989 · Apt 4C
Open — Nov certified late - ANon-hazardous
D26-10.01 adm code properly repair the broken or defective hopper doors of incinerators not closing properly 3 & 4 story public hall 335 unit.
Jun 13, 1979
Open — Nov certified late - ANon-hazardous
D26-10.01 adm code abate the nuisance consisting of ventilating lower on w wall of fire stair bulkhead obstructed unit 343.
Jun 13, 1979
Open — Not complied with
DOB building violations · 80
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2023
Jun 23, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed
Show 40 more ↓
- Nycha elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Nycha elev annual inspection/test elevatorrequired
Vio issued to nycha elevator-failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to nycha elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 5, 2016
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Aug 5, 2016
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Aug 5, 2016
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Aug 5, 2016
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Aug 5, 2016
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed
ECB violations · 44
- Class - 1
Ati observed: suspended scaffold installation was in progress using outrigger at expo # 2 of the property. upon request a licensed outrigger or outrigger's supervisor, none was available on site. contrary to bc
Sep 8, 2026 · Penalty $5,000
Active - Class - 2
At time of inspection observed hot water running from pipe into grass area, creating small pool area that's flowing across walk way into sewer. this creates potential hazardous conditions (slipping) along the w
Apr 10, 2026 · Penalty $1,250
Active - Class - 2
Exit door not self-closing. noted at 1 floor classroom 2, 3, class playroom, kitchen, main exit doors and smoke kitchen doors are not closing properly. remedy: repair/replace door.
Apr 15, 2025 · Penalty $625
Active - Class - 2
Reissue#35415066p issued 4/29/2019 failure to maintain bldg in code compliant manner. at 6 sty bldg several a/c units @ 2nd,7th fl in vary location @ exp#1 inadequately supports over the windows sills(a/c brack
Mar 4, 2021 · Penalty $1,562
Resolve - Class - 2
Failure to maintain building exterior walls and appurtenances. as noted:at time of inspection i observed on exposure#1 west elevation:ac units on the 2nd and 7th floors inadequately supported over the main entr
Jul 14, 2020 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code compliant manner. noted: at 1st floor day care kitchen area 6 burner commercial gas stove with flexible residential gas pipe. photo taken. rmdy: comply with notice of viol
Apr 24, 2019
Active - Class - 1
Failure to provide safety measures such as sidewalk sheds,fence,etc where required to protect & secure public safety from documented unsafe facade as per 1rcny-103-04.facade technical report file unsafe by pe/r
Jul 11, 2017
Resolve - Class - 1
Failure to provide safety measures such as sidewalk shed's,fence,etc,where required to protect & secure public safety from documented unsafefacade as per 1rcny-103-04.facade technical report file unsafe by de/r
Jul 11, 2017
Resolve - Class - 1
Faiure to provide safety measures,such as sidewalk shed's,fence,etc.where require to protect & secure public safety from documented unsafe facade as per 1rcny-103-04.facade technical report file unsafe by pe/ri
Jul 11, 2017
Resolve - Class - 2
Failure to maintain bldg walls or appurtenances.noted:@1st flr,class room(4),defective in the wood cladding of wall and damage w.stucco paint coating.also defective in electrical wire next to playroom.rem:compl
Oct 13, 2016
Resolve
Show 34 more ↓
- Class - 1
Failure to provide safety measures such as sidewalk sheds, fence, etc to protect public from unsafe conditions as per 1rcny 103-04 & as per notification of unsafe cond. complaint# 4632506 by ra/pe dated 9/29/15
Nov 10, 2015
Resolve - Class - 1
Fail to provide safety measures such as sidewalk shed, etc. to protect public from unsafe conditions @various elevations.note:spalled brickwork @various floors @exp #1.rem:provide safety measures,replace and/or
Oct 26, 2015
Resolve - Class - 1
Fail to provide safety measures such as sidewalk shed,etc. to protect public from unsafe conditions as per code.notification of unsafe conditions complaint.note:minor spalled brickwork @sporadic spots.rem:provi
Oct 26, 2015
Resolve - Class - 1
Fail to provide safety measures such as sidewalk shed, etc. to protect public from unsafe conditions.note:a.displaced/bulged brickwork @exp #1,north facing facade setback @7/f window's n/e corner.b.spalled bric
Oct 26, 2015
Resolve - Class - 2
60x10.70o02.16b01. 70o02-garage plus water,16b01-provide lobby door opening with a drop key.
Nov 22, 2011
Resolve - Class - 2
Failure to file an amended 7th round report acceptable to this dept indicating correction of unsafe conditions described in inital local law11/98report.rem:file an amended report following remedial repairs of
Jul 13, 2010
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & dob rules & regulations.remedy:
Apr 24, 2009
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & dob rules & regulations.remedy:
Apr 24, 2009
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & dob rules & regulations.remedy:
Apr 24, 2009
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancewith code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & dob rules & regulations.remedy:
Apr 24, 2009
Resolve - Class - 2
Failure to submit an acceptable fifth round techinical report in compliance w/code provisions periodic inspection of exterior walls 7 appurtenances as required by article 28.302 & the dob rules & regulations re
Oct 31, 2008
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance w/code provisions: periodic inspection of exterior walls & appurtenances asreq uired by local law 11 of 1998 & the dept. of bldgs rules & regulations
Jan 25, 2008
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance w/code provisions: periodic inspection of exterior walls & appurtenances asreq uired by local law 11 of 1998 & the dept. of bldgs rules & regulations
Jan 25, 2008
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance w/code provisions: periodic inspection of exterior walls & appurtenances asreq uired by local law 11 of 1998 & the dept. of bldgs rules & regulations
Jan 25, 2008
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance w/ code provisions: periodic insp of exterior walls & appurtenances as requiredby ll 11/98 & the dob rules & regulations. the 5th round technical
Aug 25, 2006
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance w/ code provisions: periodic insp of exterior walls & appurtenances as requiredby ll 11/98 & the dob rules & regulations. the 5th round technical
Aug 25, 2006
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance w/ code provisions: periodic insp of exterior walls & appurtenances as requiredby ll 11/98 & the dob rules & regulations. the 5th round technical
Aug 25, 2006
Resolve - Non-hazardous
Failure to submit a fifth round technical report in compliance with code provisions:periodic inspection of exterior walls & appurtenances asrequired by local law 11 of 1998 & the dob rules & regulations.
Jun 2, 2006
Resolve - Non-hazardous
Failure to submit a fifth round technical report in compliance with code provisions:periodic inspection of exterior walls & appurtenances asrequired by local law 11 of 1998 & the dob rules & regulations.
Jun 2, 2006
Resolve - Non-hazardous
Failure to submit a fifth round techhnical report in compliance with code provisions:periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the dob rules & regulations.
Jun 2, 2006
Resolve - Non-hazardous
Failure to submit a fifth round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenancesas required by local law 11 of 1998 & the dept of bldgs rules & regul-
Oct 21, 2005
Resolve - Non-hazardous
Failure to submit a fifth round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenancesas required by local law 11 of 1998 & the dept of bldgs rules & regul-
Oct 21, 2005
Resolve - Non-hazardous
Failure to submit a fifth round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenancesas required by local law 11 of 1998 & the dept of bldgs rules & regul-
Oct 21, 2005
Resolve - Hazardous
Scaffolds not set up according to approved plan.
Aug 23, 2005 · Penalty $500
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance with code provisions:periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the department of buildings rules &
Feb 25, 2005
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance with code provisions:periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the department of buildings rules &
Feb 25, 2005
Resolve - Non-hazardous
Failure to submit a 5th round technical report in compliance with code provisions:periodic inspection of exterior walls & appurtenances as required by local law 11 of 1998 & the department of buildings rules &
Feb 25, 2005
Resolve - Non-hazardous
Failure to submit a fifth round technical report : periodic inspectionof exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations. remedy : file
Aug 6, 2004
Resolve - Non-hazardous
Failure to submit a fifth round technical report : periodic inspectionof exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations. remedy : file
Aug 6, 2004
Resolve - Non-hazardous
Failure to submit a fifth round technical report : periodic inspectionof exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations. remedy : file
Aug 6, 2004
Resolve - Hazardous
Failure to maintain exterior of building roof brick parapet wall is cracked and pushing away from structure,horiziontial crack along entire north elev.at the last floor shelf angle.due to frezze & thaw.remedy:
Jun 24, 2003 · Penalty $2,500
Resolve - Hazardous
Failure to maintain exterior of building rusting bowing & failing window angle irons on the 2,3rd,4th and 5th floor on the west elevation angle irons are failing.remedy:make area safe erect sidewalk shed remove
Jun 24, 2003
Resolve - Hazardous
Failure to maintain exterior of building facade issues:- i parapet walls; all sides;extensive cracks in facades;open mortar joints;bulging and separation of bricks. ii extensive deteriorating of lintils and joi
Jun 11, 2003
Resolve - Hazardous
Failure to maintain exterior of building. facade issues:-i north elevation;parapet wall. extensive cracks in facade;leaning out and push-off;cracks and deteriorating in shelf angles. ii south elevation;parapet
Jun 11, 2003
Resolve
Complaints
- Heat/hot water
Apartment only
Jan 15, 2017 · Apt 5C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 1964
- Floors
- 6
- Residential units
- 418
- Building area
- 358,140 ft²
- Lot area
- 354,220 ft²
- Zoning
- R5
- Community board
- 414
- Council district
- 31
- Block / lot
- 15892 / 1
- Assessed value
- $14,717,250
- Landmark / historic district
- No
Questions about 301 Beach 54 Street
Who owns 301 Beach 54 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does 301 Beach 54 Street have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 301 Beach 54 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 301 Beach 54 Street built?
City records list 1964 as the year it was built.
How many apartments are in 301 Beach 54 Street?
It has 418 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.