228 Beach 32 Street
Queens, NY 11691BBL 4-15807-0010Map
Owner of record: 228 Beach 32 LLC
228 Beach 32 Street is a walk-up apartment building built in 2004 in Queens, 11691. It has 3 residential units across 3 floors. The owner of record is 228 Beach 32 LLC. HPD has recorded 82 housing violations here, most recently on May 20, 2026. 26 of the 50 most recent violations are still open.
- HPD violations
- 82
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 34
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 82
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
May 20, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing , 1st story
May 20, 2026
Open — Nov certified on time - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
May 20, 2026
Open — Nov certified on time - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing , 1st story
May 20, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story
May 20, 2026
Open — Nov certified on time - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 3rd story
May 20, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
May 20, 2026
Open — Nov certified on time - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story
Sep 16, 2025
Closed — Violation dismissed - BHazardous
Provide a heavy duty lock and assembly at building entrance door at public hall, 1st story
Sep 16, 2025
Open — Nov certified late
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective defective door hinges at sprinkler room at public hall, 1st story
Sep 16, 2025
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Sep 16, 2025
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Sep 16, 2025 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 3, 3rd story, apartment at south
Jun 17, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly secure the loose handrail at public hall stairs, 2nd story
Jun 17, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge
Jun 17, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective locking device at building entrance door
Jun 17, 2025
Open — Not complied with - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Jun 17, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak ceiling in the 1st room from east at south located at apt apt3, 3rd story, 1st apartment from east at south
Apr 21, 2025 · Apt APT3
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at south located at apt apt3, 3rd story, 1st apartment from east at south
Apr 21, 2025 · Apt APT3
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 21, 2025
Open — Not complied with - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box . at public hall, 1st story
Apr 21, 2025
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Apr 21, 2025
Open — Not complied with - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 21, 2025
Open — Not complied with - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor . at public hall, 1st story
Apr 21, 2025
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges, building front entrance door at public hall, 1st story
Apr 21, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt apt3, 3rd story, 1st apartment from east at south
Apr 21, 2025 · Apt APT3
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall behind stove in the kitchen located at apt apt3, 3rd story, 1st apartment from east at south
Apr 21, 2025 · Apt APT3
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft. at ceiling in the 1st room from east at south located at apt 3, 3rd story, apartment at south
Feb 25, 2025 · Apt 3
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceilng in the 1st room from east at south located at apt 3, 3rd story, apartment at south
Feb 25, 2025 · Apt 3
Open — Invalid certification - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Feb 25, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 2nd story
Feb 25, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Feb 25, 2025
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story
Feb 25, 2025
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3, 3rd story, apartment at south
Feb 25, 2025 · Apt 3
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3, 3rd story, apartment at south
Feb 25, 2025 · Apt 3
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at south located at apt 3, 3rd story, apartment at south
Feb 25, 2025 · Apt 3
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft. at ceiling in the 1st room from east at south located at apt 3, 3rd story, apartment at south original violation 17736140 issued 25-feb-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Feb 25, 2025 · Apt 3
Open — First no access to re- inspect violation - BHazardous
Remove all encumbrances consisting of household items at public hall, 3rd story
Feb 7, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of a total of 1 painted sprinkler head at public hall stairs, 1st story
Feb 7, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of a total of 1 painted sprinkler head at public hall, 2nd story
Feb 7, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance , 1st story
Feb 7, 2025
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 3, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 3, 3rd story, 1st apartment from east at south
Nov 27, 2023 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Nov 27, 2023 · Apt 2
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of at total of one painted sprinkler head at public hall, 2nd story
Nov 27, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at the building entrance , 1st story
Nov 27, 2023
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system , at boiler room
Nov 27, 2023
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Electric
Lighting
Apr 22, 2026 · Apt 3
Close - Unsanitary condition
Pests
Apr 22, 2026 · Apt 3
Close - Plumbing
Basin/sink
Apr 22, 2026 · Apt 3
Close - Unsanitary condition
Pests
Apr 22, 2026 · Apt 3
Close - Paint/plaster
Wall
Apr 22, 2026 · Apt 3
Close - Electric
No lighting
Apr 22, 2026 · Apt 3
Close - Plumbing
Bathtub/shower
Apr 22, 2026 · Apt 3
Close - Water leak
Slow leak
Apr 22, 2026 · Apt 3
Close - Appliance
Electric/gas range
Feb 9, 2026 · Apt 2F
Close - Heat/hot water
Apartment only
Apr 15, 2025 · Apt APT3
Close
Show 24 more ↓
- Unsanitary condition
Pests
Apr 15, 2025 · Apt APT3
Close - Water leak
Heavy flow
Feb 19, 2025 · Apt 3
Close - Water leak
Heavy flow
Feb 3, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Nov 21, 2023 · Apt 3
Close - Heat/hot water
Apartment only
Feb 23, 2015 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Jan 28, 2015 · Apt 2
Close - Heat/hot water
Apartment only
Jan 17, 2015 · Apt 2
Close - Heat/hot water
Apartment only
Dec 27, 2014 · Apt 2
Close - Heat/hot water
Apartment only
Dec 17, 2014 · Apt 2
Close - Heating
Heat related
Aug 6, 2009 · Apt 3
Close - Heating
Heat related
Apr 9, 2008 · Apt 1
Close - Electric
Electric-supply
Apr 9, 2008 · Apt 1
Close - Appliance
Electric/gas range
Apr 9, 2008 · Apt 1
Close - Appliance
Electric/gas range
Apr 9, 2008 · Apt 1
Close - Heating
Heat related
Apr 7, 2008 · Apt 3
Close - Electric
Lighting
Apr 7, 2008 · Apt 3
Close - Nonconst
Vermin
Apr 7, 2008 · Apt 3
Close - Heating
Heat related
Apr 3, 2008 · Apt 3
Close - General
Cooking gas
Apr 3, 2008 · Apt 3
Close - Heating
Heat related
Jan 17, 2008 · Apt 1
Close - Heating
Heat related
Jan 14, 2008 · Apt 1
Close - Heating
Heat related
Nov 21, 2007 · Apt 3
Close - Heating
Heat related
Nov 19, 2007 · Apt 3
Close - Heating
Heat related
Nov 19, 2007 · Apt 2FL
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 21, 2026 | $900,000 | Three family dwellings | 3 |
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2004
- Floors
- 3
- Residential units
- 3
- Building area
- 2,760 ft²
- Lot area
- 1,711 ft²
- Zoning
- R5
- Community board
- 414
- Council district
- 31
- Block / lot
- 15807 / 10
- Assessed value
- $57,180
- Landmark / historic district
- No
HPD registration #426618, last renewed Jul 2, 2026.
Questions about 228 Beach 32 Street
Who owns 228 Beach 32 Street?
The owner of record in NYC Department of City Planning PLUTO data is 228 Beach 32 LLC.
Does 228 Beach 32 Street have violations?
Yes. NYC HPD has recorded 82 housing violations at this property.
Is 228 Beach 32 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 228 Beach 32 Street built?
City records list 2004 as the year it was built.
How many apartments are in 228 Beach 32 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.