222 Beach 29 Street
Queens, NY 11691BBL 4-15804-0038Map
Owner of record: Yone Corp.
222 Beach 29 Street is a walk-up apartment building built in 2002 in Queens, 11691. It has 3 residential units across 3 floors. The owner of record is Yone Corp.. HPD has recorded 130 housing violations here, most recently on June 13, 2025. 9 of the 50 most recent violations are still open.
- HPD violations
- 130
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 148
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 130
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
May 31, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
May 31, 2025 · Apt 2
Closed — Violation closed - BHazardous
Provide acceptable mechanical heavy duty lock and latch set at front entrance door to building , 1st story
May 1, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of painted sprinkler heads (total-3), at all stories at public hall
Jan 16, 2025
Open — Invalid certification - CImmediately hazardous
Provide acceptable mechanical heavy duty lock and latch set at front entrance door to building , 1st story
Jan 16, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges, building front entrance door , 1st story
Jan 16, 2025
Closed — Violation closed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the accumulation of pigeon feces at south yard
Oct 9, 2024
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Oct 9, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Oct 9, 2024 · Apt 1F
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the leaky and/or defective faucets at bathtub in the 1st bathroom from east located at apt 1f, 1st story, 1st apartment from east at south
Oct 9, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at ceiling in the 1st bathroom from east located at apt 1f, 1st story, 1st apartment from east at south
Oct 9, 2024 · Apt 1F
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 1st bathroom from east located at apt 1f, 1st story, 1st apartment from east at south
Oct 9, 2024 · Apt 1F
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 2nd bathroom from east located at apt 1f, 1st story, 1st apartment from east at south
Oct 9, 2024 · Apt 1F
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 1st bathroom from east located at apt 1f, 1st story, 1st apartment from east at south original violation 17334901 issued 09-oct-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 9, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 2nd bathroom from east located at apt 1f, 1st story, 1st apartment from east at south original violation 17334904 issued 09-oct-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 9, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ceiling light fixture. at public hall, 1st story
Sep 10, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ceiling light fixture in the private hallway located at apt 1fther, 1st story, 1st apartment from east at south
Sep 10, 2024 · Apt 1FTHER
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceili g. in the 1st bathroom from east located at apt 1fther, 1st story, 1st apartment from east at south
Sep 10, 2024 · Apt 1FTHER
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ceiling light fixture. in the 1st bathroom from east located at apt 1fther, 1st story, 1st apartment from east at south
Sep 10, 2024 · Apt 1FTHER
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling less then 10 sq ft. in the 1st bathroom from east located at apt 1fther, 1st story, 1st apartment from east at south
Sep 10, 2024 · Apt 1FTHER
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2024
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub. in the 1st bathroom from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 20, 2024 · Apt 1F
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling (apprx.3 sq.ft.) in the kitchen located at apt 1f, 1st story, 1st apartment from east at south
Mar 20, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the kitchen located at apt 1f, 1st story, 1st apartment from east at south
Mar 20, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall. in the kitchen located at apt 1f, 1st story, 1st apartment from east at south
Mar 20, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Mar 20, 2024 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges. in the entrance located at apt 1f, 1st story, 1st apartment from east at south
Mar 20, 2024 · Apt 1F
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings. in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Mar 20, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection drain line at sink. in the kitchen located at apt 1f, 1st story, 1st apartment from east at south
Mar 20, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls. in the 2nd bathroom from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 20, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Replace with new the missing wood baseboard at west wall. in the 2nd bathroom from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 20, 2024 · Apt 1F
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling (apprx.8 sq ft) in the 2nd bathroom from east located at apt 1f, 1st story, 1st apartment from east at south
Mar 20, 2024 · Apt 1F
Closed — Violation dismissed - BHazardous
Refit door at front entrance to building
Mar 14, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective door at front entrance to building
Mar 14, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 14, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Mar 14, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at front entrance to building.
Mar 14, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures . in the 2nd bathroom from north at east located at apt 1f, 1st story, 1st apartment from east at south
Dec 30, 2022 · Apt 1F
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures . in the 2nd bathroom from north at east located at apt 1f, 1st story, 1st apartment from east at south
Dec 30, 2022 · Apt 1F
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors at entrance door of the building at public hall, 1st story
Sep 1, 2021
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Sep 1, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 1, 2021
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 1, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 1, 2021
Open — Nov sent out - BHazardous
Properly repair the broken or defective mailbox at front areaway
Sep 1, 2021
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls &ceilings in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Jul 30, 2021 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Jul 30, 2021 · Apt 2F
Open — Notice of issuance sent to tenant
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 3
Illegal use in a residential district. at time of inspection, observed, 4 vehicles without/expired #plate and registration are stored at the easement (exposure- 4) as a dead storage., discontinue illegal use
Sep 19, 2023 · Penalty $250
Resolve
Complaints
- Appliance
Refrigerator
May 16, 2025 · Apt 2
Close - Unsanitary condition
Pests
May 16, 2025 · Apt 2
Close - Paint/plaster
Ceiling
Apr 19, 2025 · Apt 2
Close - Heat/hot water
Entire building
Jan 14, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Oct 4, 2024 · Apt 1F
Close - Unsanitary condition
Mold
Sep 29, 2024 · Apt 1F
Close - Unsanitary condition
Mold
Sep 4, 2024 · Apt 1FTHER
Close - Door/window
Door
Sep 4, 2024 · Apt 1FTHER
Close - Electric
No lighting
Sep 4, 2024 · Apt 1FTHER
Close - Electric
No lighting
Aug 16, 2024 · Apt 1F
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Mar 11, 2024 · Apt 1F
Close - Unsanitary condition
Mold
Mar 11, 2024 · Apt 1F
Close - Plumbing
Basin/sink
Mar 11, 2024 · Apt 1F
Close - Heat/hot water
Apartment only
Mar 11, 2024 · Apt 1F
Close - Plumbing
Basin/sink
Mar 11, 2024 · Apt 1F
Close - Plumbing
Water supply
Dec 24, 2022 · Apt 1F
Close - Heat/hot water
Apartment only
Dec 24, 2022 · Apt 1F
Close - Heat/hot water
Apartment only
Dec 21, 2022 · Apt 1A
Close - Heat/hot water
Apartment only
Dec 21, 2022 · Apt 1A
Close - Plumbing
Water supply
Dec 6, 2021 · Apt 1F
Close - Unsanitary condition
Mold
Sep 3, 2021 · Apt 1F
Close - Paint/plaster
Wall
Sep 3, 2021 · Apt 1F
Close - Plumbing
Bathtub/shower
Sep 3, 2021 · Apt 1F
Close - General
Mailbox
Aug 25, 2021 · Apt 1F
Close - Paint/plaster
Wall
Aug 25, 2021 · Apt 1F
Close - Unsanitary condition
Mold
Aug 25, 2021 · Apt 1F
Close - Paint/plaster
Ceiling
Aug 25, 2021 · Apt 1F
Close - Plumbing
Bathtub/shower
Aug 25, 2021 · Apt 1F
Close - Paint/plaster
Wall
Aug 17, 2021 · Apt 2F
Close - Door/window
Door
Jul 26, 2021 · Apt 2F
Close - Plumbing
Toilet
Jul 26, 2021 · Apt 2F
Close - Paint/plaster
Ceiling
Jul 26, 2021 · Apt 2F
Close - Electric
Lighting
Jul 26, 2021 · Apt 2F
Close - Plumbing
Basin/sink
Jul 26, 2021 · Apt 2F
Close - General
Cabinet
Jul 26, 2021 · Apt 2F
Close - Appliance
Refrigerator
Jul 26, 2021 · Apt 2F
Close - Unsanitary condition
Pests
Jul 26, 2021 · Apt 2F
Close - Plumbing
Bathtub/shower
Jul 20, 2021 · Apt 1F
Close - Paint/plaster
Wall
Jul 20, 2021 · Apt 1F
Close - General
Mailbox
Jul 20, 2021 · Apt 1F
Close - General
Mailbox
Jul 12, 2021 · Apt 1
Close - Paint/plaster
Wall
Jul 12, 2021 · Apt 1F
Close - Plumbing
Bathtub/shower
Jul 12, 2021 · Apt 1F
Close - Unsanitary condition
Mold
Feb 22, 2021 · Apt 2F
Close - General
Bell/buzzer/intercom
Feb 22, 2021 · Apt 2F
Close - Plumbing
Basin/sink
Feb 22, 2021 · Apt 2F
Close - Plumbing
Basin/sink
Feb 22, 2021 · Apt 2F
Close - Water leak
Slow leak
Feb 22, 2021 · Apt 2F
Close - Plumbing
Bathtub/shower
Feb 22, 2021 · Apt 2F
Close - Unsanitary condition
Pests
Feb 22, 2021 · Apt 2F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2002
- Floors
- 3
- Residential units
- 3
- Building area
- 2,520 ft²
- Lot area
- 3,183 ft²
- Zoning
- R5
- Community board
- 414
- Council district
- 31
- Block / lot
- 15804 / 38
- Assessed value
- $47,460
- Landmark / historic district
- No
HPD registration #426188, last renewed Aug 21, 2025.
Questions about 222 Beach 29 Street
Who owns 222 Beach 29 Street?
The owner of record in NYC Department of City Planning PLUTO data is Yone Corp..
Does 222 Beach 29 Street have violations?
Yes. NYC HPD has recorded 130 housing violations at this property.
Is 222 Beach 29 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 222 Beach 29 Street built?
City records list 2002 as the year it was built.
How many apartments are in 222 Beach 29 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.