roofy

28-15 Deerfield Road

Queens, NY 11691BBL 4-15798-0001Map

Owner of record: 28-15 Deerfield Rd LLC

28-15 Deerfield Road is a walk-up apartment building built in 1910 in Queens, 11691. It has 5 residential units across 2 floors. The owner of record is 28-15 Deerfield Rd LLC. HPD has recorded 72 housing violations here, most recently on May 7, 2026. 43 of the 50 most recent violations are still open.

HPD violations
72
DOB violations
0
ECB violations
1
HPD complaints
84

What to know

Concern
13 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 72

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the 1st entrance from north located at bsmt-apt 2

    Feb 12, 2026 · Apt 2

    Open — Nov certified late
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at in the 1st entrance from north located at bsmt-apt 2

    Feb 12, 2026 · Apt 2

    Open — Invalid certification
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective as required by nspire nfpa standard 72 in the private hallway located at bsmt-apt 2

    Feb 12, 2026 · Apt 2

    Open — Nov certified late
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5, 1st apartment from south at west , section ''attic ''

    Aug 11, 2025 · Apt 5

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5, 1st apartment from south at west , section ''attic ''

    Aug 11, 2025 · Apt 5

    Open — Notice of issuance sent to tenant
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinge in the 1st entrance from north located at bsmt-apt 2, 1st bsmt-apt from west at north

    Jun 5, 2025 · Apt 2

    Open — Not complied with
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story

    Jun 5, 2025

    Open — Not complied with
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Dec 3, 2024

    Closed — Violation dismissed
Show 40 more ↓
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 25, 2024

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective hinges. in the entrance located at apt 4, 2nd story, 1st apartment from north at east

    Nov 25, 2024 · Apt 4

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective. in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east

    Nov 25, 2024 · Apt 4

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective. in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east

    Nov 25, 2024 · Apt 4

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked. at boiler room, 1st story

    Nov 25, 2024

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the kitchen located at apt 4, 2nd story, 1st apartment from north at east

    Nov 25, 2024 · Apt 4

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Nov 25, 2024

    Open — Not complied with
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Nov 25, 2024

    Open — Not complied with
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Nov 25, 2024

    Open — Not complied with
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 4, 2nd story, 2nd apartment from north at east

    Nov 3, 2024 · Apt 4

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4, 2nd story, 2nd apartment from north at east

    Nov 3, 2024 · Apt 4

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4, 2nd story, 2nd apartment from north at east

    Nov 3, 2024 · Apt 4

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2024

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 27, 2023

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east

    Nov 13, 2023 · Apt 4

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east

    Nov 13, 2023 · Apt 4

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked. at boiler room

    Nov 13, 2023

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 4, 2nd story, 1st apartment from north at east

    Nov 13, 2023 · Apt 4

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Nov 6, 2023

    Open — Not complied with
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 6, 2023

    Open — Not complied with
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Nov 6, 2023

    Open — Not complied with
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Nov 6, 2023

    Open — Not complied with
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Nov 6, 2023

    Open — Not complied with
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Nov 6, 2023

    Open — Not complied with
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 2, 2023

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 5, 3rd story, 1st apartment from north at east

    Nov 2, 2023 · Apt 5

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box defective. at public hall, 1st story

    Nov 2, 2023

    Open — Not complied with
  • B

    Repair or replace the carbon monoxide detecting device(s). defective at public hall, 1st story

    Nov 2, 2023

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Nov 2, 2023

    Open — Not complied with
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Nov 2, 2023

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department the south wall in the 2nd room from north located at apt 5 upper level, 2nd story, 1st apartment from north at east

    Sep 2, 2023 · Apt 5

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 5 upper level, 2nd story, 1st apartment from north at east

    Sep 2, 2023 · Apt 5

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5 upper level, 2nd story, 1st apartment from north at east

    Sep 2, 2023 · Apt 5

    Open — Notice of issuance sent to tenant
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story

    Sep 2, 2023

    Open — Not complied with
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Sep 2, 2023

    Open — Not complied with
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Sep 2, 2023

    Open — Not complied with
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story

    Sep 2, 2023

    Open — Not complied with
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Sep 2, 2023

    Open — Not complied with
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Sep 2, 2023

    Open — Not complied with
  • C

    Properly repair with similar material the broken or defective brick work and mortar joints at 1st and 2nd tread up from bottom leading to building front.

    Jul 25, 2023

    Closed — Violation closed

DOB building violations · 0

No DOB violations on record

ECB violations · 1

  • Class - 2

    At time of inspection observed front entry stairs have cracks, rear entry stair and porch have crack, missing storm water leader at exp# 2 and 4, roof overhang at exp#2 have hole. crack on exp#4 facade wall., r

    Dec 12, 2023

    Resolve

Complaints

  • Water leak

    Heavy flow

    Sep 28, 2026 · Apt 1BASEM

    Open
  • Unsanitary condition

    Sewage

    Sep 28, 2026 · Apt 1BASEM

    Open
  • Door/window

    Window frame

    Sep 28, 2026 · Apt 1BASEM

    Open
  • Electric

    Lighting

    Sep 28, 2026 · Apt 1BASEM

    Open
  • Door/window

    Door frame

    Sep 28, 2026 · Apt 1BASEM

    Open
  • Water leak

    Heavy flow

    Aug 10, 2026 · Apt BASEME

    Close
  • Paint/plaster

    Wall

    Aug 10, 2026 · Apt BASEME

    Close
  • Unsanitary condition

    Mold

    Aug 10, 2026 · Apt BASEME

    Close
  • Paint/plaster

    Ceiling

    Aug 10, 2026 · Apt BASEME

    Close
  • Door/window

    Window frame

    Aug 10, 2026 · Apt BASEME

    Close
Show 40 more ↓
  • Plumbing

    Basin/sink

    Aug 5, 2025 · Apt 5

    Close
  • Heat/hot water

    Entire building

    Nov 22, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 3, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Mar 4, 2024 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Mar 4, 2024 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Mar 4, 2024 · Apt 2

    Close
  • Water leak

    Slow leak

    Mar 4, 2024 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Jan 14, 2024 · Apt 4

    Close
  • Heat/hot water

    Apartment only

    Nov 13, 2023 · Apt 1THEBA

    Close
  • Heat/hot water

    Entire building

    Nov 11, 2023 · Apt 4

    Close
  • Heat/hot water

    Apartment only

    Nov 5, 2023 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Nov 1, 2023 · Apt 4

    Close
  • Unsanitary condition

    Mold

    Nov 1, 2023 · Apt 4

    Close
  • Paint/plaster

    Ceiling

    Aug 30, 2023 · Apt 5

    Close
  • Paint/plaster

    Wall

    Aug 30, 2023 · Apt 5

    Close
  • Unsanitary condition

    Pests

    Aug 30, 2023 · Apt 5

    Close
  • Unsanitary condition

    Pests

    Aug 30, 2023 · Apt 5

    Close
  • Plumbing

    Water supply

    Jul 25, 2023 · Apt 1

    Close
  • Unsanitary condition

    Pests

    Jul 18, 2023 · Apt 4

    Close
  • Unsanitary condition

    Pests

    Jul 18, 2023 · Apt 4

    Close
  • Unsanitary condition

    Pests

    Jul 18, 2023 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Jan 14, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 11, 2023 · Apt 4

    Close
  • Heat/hot water

    Apartment only

    Sep 26, 2022 · Apt 5

    Close
  • Heat/hot water

    Entire building

    Mar 3, 2018 · Apt 4

    Close
  • Plumbing

    Sewer

    Sep 21, 2011 · Apt 1A

    Close
  • Plumbing

    Sewer

    Sep 21, 2011 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Sep 21, 2011 · Apt 1A

    Close
  • General

    Mold

    Sep 21, 2011 · Apt 1A

    Close
  • Heating

    Heat related

    Aug 31, 2011 · Apt 2

    Close
  • Heating

    Heat related

    Aug 30, 2011 · Apt 2

    Close
  • General

    Stairs

    Jul 23, 2011 · Apt 2

    Close
  • General

    Stairs

    Jul 23, 2011 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Jul 23, 2011 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Jul 23, 2011 · Apt 2

    Close
  • Plumbing

    Bathtub/shower

    Jul 23, 2011 · Apt 2

    Close
  • General

    Windows

    Jul 23, 2011 · Apt 2

    Close
  • General

    Windows

    Jul 23, 2011 · Apt 2

    Close
  • Nonconst

    Vermin

    Jul 23, 2011 · Apt 2

    Close
  • General

    Floor

    Jul 23, 2011 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1910
Floors
2
Residential units
5
Building area
3,584 ft²
Lot area
6,500 ft²
Zoning
R4A
Community board
414
Council district
31
Block / lot
15798 / 1
Assessed value
$207,000
Landmark / historic district
No

HPD registration #426565, last renewed Aug 14, 2025.

Questions about 28-15 Deerfield Road

Who owns 28-15 Deerfield Road?

The owner of record in NYC Department of City Planning PLUTO data is 28-15 Deerfield Rd LLC.

Does 28-15 Deerfield Road have violations?

Yes. NYC HPD has recorded 72 housing violations at this property.

Is 28-15 Deerfield Road rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 28-15 Deerfield Road built?

City records list 1910 as the year it was built.

How many apartments are in 28-15 Deerfield Road?

It has 5 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.