408 Beach 25 Street
Queens, NY 11691BBL 4-15774-0053Map
Owner of record: Multi-Functional Family Services, INC.
408 Beach 25 Street is a walk-up apartment building built in 1950 in Queens, 11691. It has 7 residential units across 1 floor. The owner of record is Multi-Functional Family Services, INC.. HPD has recorded 400 housing violations here, most recently on August 22, 2026. 33 of the 50 most recent violations are still open.
- HPD violations
- 400
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 297
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 400
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt a, 1st story, 1st apartment from west at north
Aug 22, 2026 · Apt A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt a, 1st story, 1st apartment from west at north
Aug 22, 2026 · Apt A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective grout inbetween tiles at north wall in the bathroom located at apt a, 1st story, 1st apartment from west at north
Aug 22, 2026 · Apt A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt a, 1st story, 1st apartment from west at north
Aug 22, 2026 · Apt A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulk around the bathtub in the bathroom located at apt a, 1st story, 1st apartment from west at north
Aug 22, 2026 · Apt A
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt a, 1st story, 1st apartment from west at north
Aug 22, 2026 · Apt A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt a, 1st story, 1st apartment from west at north
Aug 22, 2026 · Apt A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt a, 1st story, 1st apartment from west at north
Aug 22, 2026 · Apt A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt a, 1st story, 1st apartment from west at north
Aug 22, 2026 · Apt A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt a, 1st story, 1st apartment from west at north
Aug 22, 2026 · Apt A
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at north wall in the foyer located at apt a, 1st story, 1st apartment from west at north
Aug 22, 2026 · Apt A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at building front , section ''a''
Aug 22, 2026
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of at ceiling at building front , section ''a''
Aug 22, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame at boiler room door at rear yard
Aug 22, 2026
Open — Nov sent out - BHazardous
Properly secure the loose light fixture at front areaway, 1st story
Jul 17, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt a1stfl, 1st story, 1st apartment from west at north
Jul 17, 2026 · Apt A1STFL
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt a1stfl, 1st story, 1st apartment from west at north
Jul 17, 2026 · Apt A1STFL
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic wall tiles at north wall in the bathroom located at apt a1stfl, 1st story, 1st apartment from west at north
Jul 17, 2026 · Apt A1STFL
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling less than 10 square feet in the bathroom located at apt d, 1st story, 1st apartment from west at north
Oct 27, 2025 · Apt D
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wood base cabinet door at sink in the kitchen located at apt d, 1st story, 1st apartment from west at north
Oct 27, 2025 · Apt D
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling less than 10 square feet in the bathroom located at apt d, 1st story, 1st apartment from west at north original violation 18325998 issued 27-oct-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Oct 27, 2025 · Apt D
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt d, 1st story, 4th apartment from west at north
Aug 13, 2023 · Apt D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt d, 1st story, 4th apartment from west at north
Aug 13, 2023 · Apt D
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 30, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 2 sq ft at ceiling in the bathroom located at apt 410c, 1st story, 3rd apartment from west at north original violation 15649826 issued 07-jan-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jan 7, 2023 · Apt 410C
Open — First no access to re- inspect violation - CImmediately hazardous
Provide ready access to buildings heating system door locked, at cellar
Jan 7, 2023
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 410c, 1st story, 3rd apartment from west at north
Jan 7, 2023 · Apt 410C
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 410c, 1st story, 3rd apartment from west at north
Jan 7, 2023 · Apt 410C
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 2 sq ft at ceiling in the bathroom located at apt 410c, 1st story, 3rd apartment from west at north
Jan 7, 2023 · Apt 410C
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 410c, 1st story, 3rd apartment from west at north
Jan 7, 2023 · Apt 410C
Closed — Violation closed - BHazardous
Properly repair the broken or defective ceiling light fixture in the bathroom located at apt 410d, 1st story, 4th apartment from west at north
Jan 7, 2023 · Apt 410D
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement
Jan 7, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 410d, 1st story, 4th apartment from west at north
Jan 7, 2023 · Apt 410D
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 4, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchenette , the bathroom located at apt d, 1st story, 4th apartment from west at north
Feb 9, 2022 · Apt D
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt d, 1st story, 4th apartment from west at north
Feb 9, 2022 · Apt D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt d, 1st story, 4th apartment from west at north
Feb 9, 2022 · Apt D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide adequate supply of hot water for the fixtures in the kitchen and bathroom in the entire apartment located at apt d, 1st story, 4th apartment from west at north
Feb 9, 2022 · Apt D
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 16 sq ft at the ceiling in the bathroom located at apt d, 1st story, 4th apartment from west at north
Feb 9, 2022 · Apt D
Open — Defect letter issued - BHazardous
Trace and repair the source and abate the visible mold condition... approx 10 sq. ft. at ceiling in the bathroom located at apt d, 1st story, 4th apartment from west at north
Feb 6, 2022 · Apt D
Open — Defect letter issued - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt d, 1st story, 4th apartment from west at north
Feb 6, 2022 · Apt D
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Plumbing
Bathtub/shower
Jul 6, 2026 · Apt A
Close - Unsanitary condition
Sewage
Jul 6, 2026 · Apt A
Close - Paint/plaster
Wall
Jul 6, 2026 · Apt A
Close - Plumbing
Toilet
Jul 6, 2026 · Apt A
Close - Plumbing
Basin/sink
Jul 6, 2026 · Apt A
Close - Flooring/stairs
Floor
Jul 6, 2026 · Apt A
Close - Electric
Lighting
Jul 6, 2026 · Apt A
Close - Unsanitary condition
Sewage
Jul 3, 2026 · Apt A1STFL
Close - General
Signage missing
Jul 2, 2026 · Apt B
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt C
Close
Show 40 more ↓
- Water leak
Heavy flow
Oct 25, 2025 · Apt D
Close - Unsanitary condition
Sewage
Oct 25, 2025 · Apt D
Close - Unsanitary condition
Pests
Oct 25, 2025 · Apt D
Close - Unsanitary condition
Mold
Oct 25, 2025 · Apt D
Close - Paint/plaster
Wall
Oct 25, 2025 · Apt D
Close - Door/window
Window frame
Oct 25, 2025 · Apt D
Close - Electric
Wiring
Oct 25, 2025 · Apt D
Close - Heat/hot water
Apartment only
Oct 25, 2025 · Apt D
Close - General
Ventilation system
Oct 25, 2025 · Apt D
Close - Plumbing
Bathtub/shower
May 16, 2025 · Apt D
Close - General
Ventilation system
May 16, 2025 · Apt D
Close - Plumbing
Toilet
May 16, 2025 · Apt D
Close - Plumbing
Toilet
May 16, 2025 · Apt D
Close - Plumbing
Basin/sink
May 16, 2025 · Apt D
Close - Unsanitary condition
Pests
May 16, 2025 · Apt D
Close - Plumbing
Bathtub/shower
Aug 9, 2023 · Apt D
Close - Unsanitary condition
Sewage
Jan 5, 2023 · Apt 410C
Close - Heat/hot water
Apartment only
Jan 5, 2023 · Apt 410C
Close - Plumbing
Bathtub/shower
Jan 5, 2023 · Apt 410C
Close - Plumbing
Toilet
Jan 5, 2023 · Apt 410C
Close - Unsanitary condition
Mold
Jan 5, 2023 · Apt 410C
Close - Plumbing
Basin/sink
Jan 3, 2023 · Apt D
Close - Plumbing
Bathtub/shower
Jan 3, 2023 · Apt D
Close - Paint/plaster
Wall
Jan 3, 2023 · Apt D
Close - Plumbing
Toilet
Jan 3, 2023 · Apt D
Close - Plumbing
Bathtub/shower
Dec 27, 2022 · Apt DCANTF
Close - Heat/hot water
Apartment only
Feb 10, 2022 · Apt D
Close - Heat/hot water
Apartment only
Feb 10, 2022 · Apt BD
Close - Heat/hot water
Apartment only
Feb 3, 2022 · Apt D
Close - Plumbing
Toilet
Oct 21, 2021 · Apt D
Close - Unsanitary condition
Sewage
Oct 21, 2021 · Apt D
Close - Unsanitary condition
Garbage/recycling storage
Feb 8, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2020 · Apt B
Close - Electric
Power outage
Dec 4, 2020 · Apt B
Close - Electric
Wiring
Dec 4, 2020 · Apt B
Close - Electric
Power outage
Dec 4, 2020 · Apt B
Close - Heat/hot water
Apartment only
Dec 4, 2020 · Apt B
Close - Electric
Outlet/switch
Nov 26, 2020 · Apt B
Close - Electric
Wiring
Nov 26, 2020 · Apt B
Close - Heat/hot water
Apartment only
Nov 25, 2020 · Apt B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1950
- Floors
- 1
- Residential units
- 7
- Building area
- 1,820 ft²
- Lot area
- 7,020 ft²
- Zoning
- R4A
- Community board
- 414
- Council district
- 31
- Block / lot
- 15774 / 53
- Assessed value
- $137,250
- Landmark / historic district
- No
HPD registration #415945, last renewed Jun 8, 2026.
Questions about 408 Beach 25 Street
Who owns 408 Beach 25 Street?
The owner of record in NYC Department of City Planning PLUTO data is Multi-Functional Family Services, INC..
Does 408 Beach 25 Street have violations?
Yes. NYC HPD has recorded 400 housing violations at this property.
Is 408 Beach 25 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 408 Beach 25 Street built?
City records list 1950 as the year it was built.
How many apartments are in 408 Beach 25 Street?
It has 7 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.