29-20 Beach Channel Drive
Queens, NY 11691BBL 4-15744-0055Map
Owner of record: St. Ann Trust
29-20 Beach Channel Drive is a two-family home built in 1950 in Queens, 11691. It has 2 residential units across 2 floors. The owner of record is St. Ann Trust. HPD has recorded 47 housing violations here, most recently on August 21, 2026. 45 of the 47 most recent violations are still open.
- HPD violations
- 47
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 73
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 47
- ANon-hazardous
Refit window at north wall in the 1st room from north located at apt 1, 1st story, 2nd apartment from west at north
Aug 21, 2026 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet observed at ceiling and north wall in the bathroom located at apt 1, 1st story, 2nd apartment from west at north
Aug 21, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1, 1st story, 2nd apartment from west at north
Aug 21, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 2nd apartment from west at north
Aug 21, 2026 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of gnats in the entire apartment located at apt 1, 1st story, 2nd apartment from west at north
Aug 21, 2026 · Apt 1
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 2nd apartment from west at north
Aug 21, 2026 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling in the kitchen located at apt 1, 1st story, 2nd apartment from west at north
Aug 21, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1, 1st story, 2nd apartment from west at north
Aug 21, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 2nd apartment from west at north
Aug 21, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base at cabinet at sink in the kitchen located at apt 1, 1st story, 2nd apartment from west at north
Aug 21, 2026 · Apt 1
Open — Nov sent out
Show 37 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and north wall in the bathroom located at apt 1, 1st story, 2nd apartment from west at north
Aug 21, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective handle at faucet at wash basin in the bathroom located at apt 1, 1st story, 2nd apartment from west at north
Aug 21, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Refit window at west wall in the bathroom located at apt 1, 1st story, 2nd apartment from west at north
Aug 21, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north located at apt 1, 1st story, 2nd apartment from west at north
Aug 21, 2026 · Apt 1
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jul 16, 2025
Open — Info nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 2, 3rd story, 1st apartment from west at north
Jul 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at all walls and ceilings in the entire apartment located at apt 2, 3rd story, 1st apartment from west at north
Jul 15, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at south wall in the 1st room from north at west located at apt 2, 3rd story, 1st apartment from west at north
Jul 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 3rd story, 1st apartment from west at north
Jul 15, 2025 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 3rd story, 1st apartment from west at north
Jul 15, 2025 · Apt 2
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story
Aug 27, 2015 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at north wall. approx. 1 sq.ft. in the bathroom located at apt 1, 1st story
Aug 27, 2015 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass pane at middle section of window in the 3rd room from north located at apt 1, 1st story
Aug 27, 2015 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective connection wasteline at washbasin in the bathroom located at apt 1, 1st story
Aug 27, 2015 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 1, 1st story
Aug 27, 2015 · Apt 1
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story
Aug 14, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Properly secure the loose wash basin cabinet. in the bathroom located at apt 1fl, 1st story
Aug 14, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Repair by closing so as to be gas tight all openings in the wash basin waste line. in the bathroom located at apt 1fl, 1st story
Aug 14, 2015 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... on tile wall. in the bathroom located at apt 1fl, 1st story
Aug 14, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling. in the bathroom located at apt 1fl, 1st story
Aug 14, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Replace with new the broken or defective window glass in the south living-room. located at apt 1fl, 1st story
Aug 14, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective connection at drain pipe under wash basin in the bathroom located at apt 1stfl, 1st story
Aug 7, 2015 · Apt 1STFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 1stfl, 1st story
Aug 7, 2015 · Apt 1STFL
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at north wall in the bathroom located at apt 1stfl, 1st story
Aug 7, 2015 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective glass pane at front window in the 3rd room from north located at apt 1stfl, 1st story
Aug 7, 2015 · Apt 1STFL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 1fl, 1st story
Jun 24, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 1fl, 1st story
Jun 24, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story
Jun 24, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1fl, 1st story
Jun 24, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective electric out let at north wall in the kitchen located at apt 1fl, 1st story
Jun 24, 2015 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1fl, 1st story
Jun 24, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls in the 2nd room from north located at apt 1fl, 1st story
Jun 24, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood vanity at wash basin in the bathroom located at apt 1fl, 1st story
Jun 24, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1fl, 1st story
May 28, 2015 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective shower head at bathtub in the bathroom located at apt 1fl, 1st story
May 28, 2015 · Apt 1FL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls in the private hallway located at apt 1fl, 1st story
May 28, 2015 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective connection sink wastline in the kitchen located at apt 1fl, 1st story
May 19, 2015 · Apt 1FL
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Door/window
Window frame
Aug 2, 2026 · Apt 1
Close - Unsanitary condition
Mold
Aug 2, 2026 · Apt 1
Close - Water leak
Slow leak
Aug 2, 2026 · Apt 1
Close - Unsanitary condition
Pests
Aug 2, 2026 · Apt 1
Close - Electric
Power outage
Jul 13, 2025 · Apt 2
Close - Electric
Power outage
Jul 11, 2025 · Apt BASEME
Close - Electric
Power outage
Apr 16, 2024 · Apt BLDG
Close - Plumbing
Bathtub/shower
Dec 20, 2023 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Aug 26, 2015 · Apt 1
Close - Plumbing
Water supply
Aug 18, 2015 · Apt 1
Close
Show 40 more ↓
- Plumbing
Basin/sink
Aug 18, 2015 · Apt 1
Close - Paint/plaster
Ceiling
Aug 18, 2015 · Apt 1
Close - Plumbing
Water supply
Aug 13, 2015 · Apt 1FL
Close - Unsanitary condition
Mold
Aug 13, 2015 · Apt 1FL
Close - Paint/plaster
Ceiling
Aug 13, 2015 · Apt 1FL
Close - Door/window
Window pane
Aug 13, 2015 · Apt 1FL
Close - Heat/hot water
Apartment only
Aug 13, 2015 · Apt 1FL
Close - Door/window
Window pane
Aug 6, 2015 · Apt 1STFL
Close - Paint/plaster
Ceiling
Aug 6, 2015 · Apt 1STFL
Close - Unsanitary condition
Mold
Aug 6, 2015 · Apt 1STFL
Close - Unsanitary condition
Pests
Aug 6, 2015 · Apt 1STFL
Close - Door/window
Window pane
Aug 6, 2015 · Apt 1STFL
Close - Plumbing
Basin/sink
Aug 6, 2015 · Apt 1STFL
Close - Unsanitary condition
Mold
Aug 6, 2015 · Apt 1STFL
Close - Heat/hot water
Apartment only
Aug 6, 2015 · Apt 1STFL
Close - Paint/plaster
Ceiling
Jun 29, 2015 · Apt BSMNT
Close - Water leak
Slow leak
Jun 29, 2015 · Apt BSMNT
Close - Unsanitary condition
Mold
Jun 24, 2015 · Apt BASE
Close - Appliance
Refrigerator
Jun 24, 2015 · Apt BASE
Close - Unsanitary condition
Mold
Jun 24, 2015 · Apt BASE
Close - Water leak
Heavy flow
Jun 24, 2015 · Apt BASE
Close - Plumbing
Toilet
Jun 24, 2015 · Apt BASE
Close - Plumbing
Basin/sink
Jun 24, 2015 · Apt BASE
Close - Plumbing
Basin/sink
Jun 24, 2015 · Apt BASE
Close - Water leak
Slow leak
Jun 24, 2015 · Apt BASE
Close - Water leak
Slow leak
Jun 24, 2015 · Apt BASE
Close - Paint/plaster
Wall
Jun 24, 2015 · Apt BASE
Close - Paint/plaster
Wall
Jun 24, 2015 · Apt BASE
Close - Electric
Outlet/switch
Jun 19, 2015 · Apt 1FL
Close - Plumbing
Basin/sink
Jun 19, 2015 · Apt 1FL
Close - Paint/plaster
Wall
Jun 19, 2015 · Apt 1FL
Close - Heat/hot water
Apartment only
Jun 19, 2015 · Apt 1FL
Close - Water leak
Slow leak
Jun 16, 2015 · Apt BSMT
Close - Unsanitary condition
Mold
Jun 16, 2015 · Apt BSMT
Close - Plumbing
Basin/sink
Jun 16, 2015 · Apt BSMT
Close - Plumbing
Basin/sink
Jun 16, 2015 · Apt BSMT
Close - Water leak
Slow leak
Jun 16, 2015 · Apt BSMT
Close - Water leak
Slow leak
Jun 16, 2015 · Apt BSMT
Close - Paint/plaster
Wall
Jun 16, 2015 · Apt BSMT
Close - Paint/plaster
Wall
Jun 16, 2015 · Apt BSMT
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1950
- Floors
- 2
- Residential units
- 2
- Building area
- 2,930 ft²
- Lot area
- 3,681 ft²
- Zoning
- R4A
- Community board
- 414
- Council district
- 31
- Block / lot
- 15744 / 55
- Assessed value
- $47,520
- Landmark / historic district
- No
Questions about 29-20 Beach Channel Drive
Who owns 29-20 Beach Channel Drive?
The owner of record in NYC Department of City Planning PLUTO data is St. Ann Trust.
Does 29-20 Beach Channel Drive have violations?
Yes. NYC HPD has recorded 47 housing violations at this property.
Is 29-20 Beach Channel Drive rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 29-20 Beach Channel Drive built?
City records list 1950 as the year it was built.
How many apartments are in 29-20 Beach Channel Drive?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.