29-64 Beach Channel Drive
Queens, NY 11691BBL 4-15744-0001Map
Owner of record: Psch INC
29-64 Beach Channel Drive is an elevator apartment building built in 2007 in Queens, 11691. It has 99 residential units across 5 floors. The owner of record is Psch INC. HPD has recorded 43 housing violations here, most recently on May 8, 2026. 7 of the 43 most recent violations are still open.
- HPD violations
- 43
- DOB violations
- 29
- ECB violations
- 4
- HPD complaints
- 68
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 43
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire stairs door at public hall, 5th story, section ''b'', at east
Sep 2, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at front entrance to building.
Aug 22, 2023
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Aug 22, 2023
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system at cellar at boiler room
Apr 16, 2023
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5k, 5th story, 1st apartment from west at north
Apr 16, 2023 · Apt 5K
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at entrance in the entire apartment located at apt 5k, 5th story, 1st apartment from west at north
Apr 16, 2023 · Apt 5K
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5k, 5th story, 1st apartment from west at north
Apr 6, 2023 · Apt 5K
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 5k, 5th story, 1st apartment from west at north
Apr 6, 2023 · Apt 5K
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed
Show 33 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at the entrance located at b-room 5b, 5th story, 2nd b-room from west at north
Aug 29, 2022 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3e, 3rd story, 2nd apartment from east at south
Oct 26, 2021 · Apt 3E
Open — Defect letter issued - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3e, 3rd story, 2nd apartment from east at south
Oct 26, 2021 · Apt 3E
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3e, 3rd story, 2nd apartment from east at south
Oct 26, 2021 · Apt 3E
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 3e, 3rd story, 2nd apartment from east at south
Oct 26, 2021 · Apt 3E
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 3e, 3rd story, 2nd apartment from east at south
Oct 26, 2021 · Apt 3E
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling in the bathroom located at apt 3e, 3rd story, 2nd apartment from east at south
Oct 26, 2021 · Apt 3E
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 20, 2021
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 5th story
Apr 13, 2021
Open — Defect letter issued - CImmediately hazardous
Remove the illegal fastening a double cylinder key operated lock installed at the building entrance door
Apr 13, 2021
Open — Not complied with - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 13, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 1, 2021
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening a double cylinder key operated lock installed at the building entrance door.
Apr 1, 2021
Open — Not complied with - CImmediately hazardous
Remove the illegal fastening a double cylinder key operated lock installed at the door of the building entrance.
Aug 27, 2020
Open — Not complied with - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 27, 2020
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Aug 27, 2020
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 27, 2020
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 27, 2020
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches located at b-room 2g, 2nd story, 4th b-room from east at south
Aug 27, 2020 · Apt 2G
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2019
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2g, 2nd story, 4th apartment from east at south
Nov 14, 2018 · Apt 2G
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 29, 2018
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2g, 2nd story, 5th apartment from east at south
Apr 14, 2018 · Apt 2G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 2g, 2nd story, 5th apartment from west at north
Apr 14, 2018 · Apt 2G
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 12, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2016
Closed — Violation dismissed - BHazardous
Replace or repair the self-closing doors that is missing or defective at compactor closet at all stories at public hall
Apr 8, 2016
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 27, 2015
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at south located at apt 5g, 5th story, 4th apartment from east at south
Sep 15, 2011 · Apt 5G
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... mildew at ceiling in the 1st room from east at south located at apt 5g, 5th story, 4th apartment from east at south
Sep 15, 2011 · Apt 5G
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak 0ver ceiling in the 1st room from east at south located at apt 5g, 5th story, 4th apartment from east at south
Sep 15, 2011 · Apt 5G
Closed — Violation closed
DOB building violations · 29
- Construction other optional
Ftm bldg in a code compliant manner-on exp1 there is a continuous vert crack in the middle at right side of lobby entrance & continuous vert crack left side of side door going from street level to top owner to immed retain nyspe to eval the entire bldg determine the struct stab,prepare/file repair dwgs, repair bldg under permit
Dec 15, 2025
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - active
Show 19 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2016
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 16, 2012
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 19, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 20, 2008
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 2
52-k-z, 52-m-7 (25-k-2) hoist cables rusted clean & monitor condition.(52,m,7) cable spin out missing in the pit.
Nov 25, 2019 · Penalty $625
Resolve - Class - 1
20180925
Aug 9, 2018
Resolve - Class - 1
Door restrictor missing. single elevator residence for handicap persons. provide asap. elevator maintenance company notified to repair at time of inspection. excessive hydraulic oil in pit. remove oil. locate
Aug 9, 2018
Resolve - Class - 2
2x10,19x10,70o2. 2x10-phone inoperative; 19x10-zone lock inoperative;70o2-dirty pit.
Dec 31, 2016 · Penalty $1,250
Resolve
Complaints
- Door/window
Window pane
Apr 18, 2026 · Apt APT2D
Close - Door/window
Window frame
Apr 18, 2026 · Apt APT2D
Close - Door/window
Window frame
Apr 18, 2026 · Apt APT2D
Close - Door/window
Window frame
Apr 18, 2026 · Apt APT2D
Close - Plumbing
Bathtub/shower
Sep 25, 2024 · Apt 2D
Close - General
Ventilation system
Sep 23, 2024 · Apt 2D
Close - Electric
No lighting
Aug 14, 2024 · Apt BLDG
Close - Plumbing
Basin/sink
Apr 26, 2024 · Apt 2D
Close - Plumbing
Bathtub/shower
Apr 26, 2024 · Apt 2D
Close - Plumbing
Basin/sink
Jan 7, 2024 · Apt 2D
Close
Show 40 more ↓
- Door/window
Window frame
Jan 7, 2024 · Apt 2D
Close - Plumbing
Basin/sink
Jan 7, 2024 · Apt 2D
Close - Plumbing
Bathtub/shower
Jan 7, 2024 · Apt 2D
Close - Heat/hot water
Entire building
Dec 24, 2023 · Apt 2D
Close - Door/window
Window frame
Nov 8, 2023 · Apt 3E
Close - Heat/hot water
Entire building
Aug 16, 2023 · Apt BLDG
Close - Plumbing
Bathtub/shower
Jun 3, 2023 · Apt 2D
Close - Paint/plaster
Wall
Jun 3, 2023 · Apt 2D
Close - Door/window
Door
Jun 3, 2023 · Apt 2D
Close - Appliance
Refrigerator
Jun 3, 2023 · Apt 2D
Close - Plumbing
Bathtub/shower
Jun 3, 2023 · Apt 2D
Close - Heat/hot water
Apartment only
Apr 15, 2023 · Apt 5K
Close - Heat/hot water
Apartment only
Apr 14, 2023 · Apt 5K
Close - Heat/hot water
Apartment only
Apr 5, 2023 · Apt 5K
Close - Heat/hot water
Apartment only
Mar 29, 2023 · Apt 5K
Close - Heat/hot water
Apartment only
Dec 24, 2022 · Apt 4E
Close - Paint/plaster
Ceiling
Aug 28, 2022 · Apt 5B
Close - Unsanitary condition
Pests
Oct 26, 2021 · Apt 3E
Close - Unsanitary condition
Pests
May 3, 2021 · Apt 5G
Close - Unsanitary condition
Pests
Apr 16, 2021 · Apt 5K
Close - Unsanitary condition
Pests
Apr 6, 2021 · Apt 5K
Close - Unsanitary condition
Mold
Jul 23, 2020 · Apt 5G
Close - Appliance
Refrigerator
Jun 23, 2020 · Apt 3E
Close - Unsanitary condition
Garbage/recycling storage
Nov 8, 2018 · Apt 2G
Close - Door/window
Door
Nov 8, 2018 · Apt 2G
Close - Flooring/stairs
Floor
Nov 8, 2018 · Apt 2G
Close - Water leak
Damp spot
Nov 8, 2018 · Apt 2G
Close - Unsanitary condition
Mold
Nov 8, 2018 · Apt 2G
Close - Appliance
Electric/gas range
Nov 8, 2018 · Apt 2G
Close - Paint/plaster
Ceiling
Nov 8, 2018 · Apt 2G
Close - Water leak
Damp spot
Nov 8, 2018 · Apt 2G
Close - Water leak
Slow leak
Nov 8, 2018 · Apt 2G
Close - Heat/hot water
Apartment only
Oct 28, 2018 · Apt 4E
Close - Unsanitary condition
Pests
Oct 21, 2018 · Apt 3E
Close - Heat/hot water
Entire building
Apr 16, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 15, 2018 · Apt 5C
Close - Heat/hot water
Entire building
Apr 14, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 12, 2018 · Apt BLDG
Close - Unsanitary condition
Mold
Apr 11, 2018 · Apt 2G
Close - Heat/hot water
Apartment only
Apr 11, 2018 · Apt 2G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D9)
- Year built
- 2007
- Floors
- 5
- Residential units
- 99
- Building area
- 25,355 ft²
- Lot area
- 10,141 ft²
- Zoning
- R6A
- Community board
- 414
- Council district
- 31
- Block / lot
- 15744 / 1
- Assessed value
- $1,672,650
- Landmark / historic district
- No
HPD registration #432330, last renewed Jul 8, 2025.
Questions about 29-64 Beach Channel Drive
Who owns 29-64 Beach Channel Drive?
The owner of record in NYC Department of City Planning PLUTO data is Psch INC.
Does 29-64 Beach Channel Drive have violations?
Yes. NYC HPD has recorded 43 housing violations at this property.
Is 29-64 Beach Channel Drive rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 29-64 Beach Channel Drive built?
City records list 2007 as the year it was built.
How many apartments are in 29-64 Beach Channel Drive?
It has 99 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.