11-28 Dickens Street
Queens, NY 11691BBL 4-15716-0024Map
Owner of record: 1128a Dickens Street LLC
11-28 Dickens Street is a walk-up apartment building built in 1920 in Queens, 11691. It has 3 residential units across 2.5 floors. The owner of record is 1128a Dickens Street LLC. HPD has recorded 117 housing violations here, most recently on May 7, 2026. 42 of the 50 most recent violations are still open.
- HPD violations
- 117
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 82
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 117
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system ,locked door at basement at boiler room
Apr 30, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1stflo, 1st story, 1st apartment from east at south
Apr 30, 2026 · Apt 1STFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ,ceramic floor tiles in the bathroom located at apt 1stflo, 1st story, 1st apartment from east at south
Apr 30, 2026 · Apt 1STFLO
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1stflo, 1st story, 1st apartment from east at south
Apr 30, 2026 · Apt 1STFLO
Open — Notice of issuance sent to tenant - CImmediately hazardous
M/d law abate the nuisance consisting of key operated door knob at door leading to fire escape window in the 3rd room from east located at apt 3, 3rd story, 1st apartment from east at south
Apr 21, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
Apr 21, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
Apr 21, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
Apr 21, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective 1st from west hydronic baseboard heater missing cover at north wall. in the 1st room from east at north located at apt 1r, 1st story, 1st apartment from east at south
Jan 27, 2026 · Apt 1R
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from east at north located at apt 1r, 1st story, 1st apartment from east at south
Jan 27, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Jan 27, 2026 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the private hallway located at apt 1r, 1st story, 1st apartment from east at south
Jan 27, 2026 · Apt 1R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximum allowable operating temperature of 130f. 151 f found. in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Jan 27, 2026 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet at sink. in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Jan 27, 2026 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st closet from east at south wall door frame, 1st door frame from south at west wall in the 1st room from east at north located at apt 1r, 1st story, 1st apartment from east at south
Jan 27, 2026 · Apt 1R
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Jan 27, 2026 · Apt 1R
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st door frame from south at west wall in the private hallway located at apt 1r, 1st story, 1st apartment from east at south
Jan 27, 2026 · Apt 1R
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from east at south wall, 1st door frame from south at west wall in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Jan 27, 2026 · Apt 1R
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, ceiling, 1st closet from north at east wall door frame, 1st door frame from south at west wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 1r, 1st story, 1st apartment from east at south
Jan 27, 2026 · Apt 1R
Open — Defect letter issued - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1r, 1st story, 1st apartment from east at south
Jan 27, 2026 · Apt 1R
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Mar 29, 2023 · Apt 2NDFLO
Open — Notice of issuance sent to tenant - BHazardous
Replace with new the missing electrical light switch cover plate at north wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Mar 29, 2023 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Replace with new the missing electrcal light switch cover plate at south wall in the private hallway located at apt 2ndflo, 2nd story, 1st apartment from north at east
Mar 29, 2023 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Replace with new the missing electrical lighgt switch cover plate in the foyer located at apt 2ndflo, 2nd story, 1st apartment from north at east
Mar 29, 2023 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Mar 29, 2023 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Mar 29, 2023 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at south located at apt 2ndfl, 2nd story, 1st apartment from north at east
Mar 29, 2023 · Apt 2NDFL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 2ndfl, 2nd story, 1st apartment from north at east
Mar 29, 2023 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Dec 12, 2022
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at front entrance to building , 1st story
Dec 12, 2022
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 12, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 12, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Dec 12, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Dec 12, 2022
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Dec 12, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire-retardant material consisting of plaster at ceiling at public hall stairs, 2nd story
May 21, 2022
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
May 21, 2022
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
May 21, 2022
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 1, 1st story, 1st apartment from east at south
May 21, 2022 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective concrete tread, 1st stair tread from bottom, at building front at south at stoop
May 21, 2022
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
May 21, 2022
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire-retardant material consisting of plaster at ceiling at public hall, 1st story
May 21, 2022
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling at public hall, 1st story
May 21, 2022
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Pests
Jul 2, 2026 · Apt 1FLOOR
Open - Heat/hot water
Entire building
May 3, 2026 · Apt FIRSTF
Close - Heat/hot water
Entire building
Apr 30, 2026 · Apt FIRSTF
Close - Heat/hot water
Apartment only
Apr 29, 2026 · Apt 1STFLO
Close - Unsanitary condition
Pests
Apr 29, 2026 · Apt 1STFLO
Close - Unsanitary condition
Pests
Apr 29, 2026 · Apt 1STFLO
Close - Heat/hot water
Entire building
Apr 19, 2026 · Apt 1
Close - Heat/hot water
Entire building
Apr 13, 2026 · Apt BLDG
Close - Electric
Power outage
Apr 13, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 12, 2026 · Apt 1STFLO
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Apr 12, 2026 · Apt 1STFLO
Close - Flooring/stairs
Floor
Apr 12, 2026 · Apt 1STFLO
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt 1STFLO
Close - Paint/plaster
Wall
Jan 26, 2026 · Apt 1FLBAC
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 1FLBAC
Close - Electric
Power outage
Jan 26, 2026 · Apt 1FLBAC
Close - Paint/plaster
Wall
Jan 26, 2026 · Apt 1FLBAC
Close - Flooring/stairs
Floor
Jan 26, 2026 · Apt 1FLBAC
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt FIRSTF
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt FIRSTF
Close - Paint/plaster
Wall
Jan 21, 2026 · Apt FIRSTF
Close - Paint/plaster
Wall
Jan 21, 2026 · Apt FIRSTF
Close - Paint/plaster
Ceiling
Jan 19, 2026 · Apt 1STFLO
Close - Heat/hot water
Apartment only
Jan 19, 2026 · Apt 1STFLO
Close - Paint/plaster
Wall
Jan 19, 2026 · Apt 1STFLO
Close - Plumbing
Water supply
Apr 8, 2023 · Apt 3
Close - Heat/hot water
Apartment only
Mar 23, 2023 · Apt 2
Close - Water leak
Heavy flow
Mar 23, 2023 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Mar 14, 2023 · Apt 2NDFL
Close - Water leak
Heavy flow
Mar 14, 2023 · Apt 2NDFL
Close - Water leak
Slow leak
Feb 20, 2023 · Apt 2NDFLO
Close - Paint/plaster
Wall
Feb 17, 2023 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Dec 9, 2022 · Apt 2FLOOR
Close - Heat/hot water
Apartment only
Oct 20, 2022 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Oct 18, 2022 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Oct 17, 2022 · Apt HOUSE
Close - Heat/hot water
Apartment only
Oct 3, 2022 · Apt 2
Close - Heat/hot water
Apartment only
Apr 28, 2022 · Apt 2FLOOR
Close - Heat/hot water
Apartment only
Apr 16, 2022 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Apr 10, 2022 · Apt 2FL
Close - Heat/hot water
Apartment only
Mar 22, 2022 · Apt 2NDFLO
Close - Door/window
Door frame
Mar 18, 2022 · Apt 2NDFLO
Close - Paint/plaster
Ceiling
Mar 18, 2022 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Mar 18, 2022 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Mar 18, 2022 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Mar 18, 2022 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Dec 22, 2021 · Apt 2
Close - Unsanitary condition
Pests
Dec 22, 2021 · Apt 2
Close - Unsanitary condition
Pests
Dec 22, 2021 · Apt 2
Close - Heat/hot water
Apartment only
Mar 12, 2021 · Apt 2NDFLO
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1920
- Floors
- 2.5
- Residential units
- 3
- Building area
- 3,737 ft²
- Lot area
- 5,775 ft²
- Zoning
- R2
- Community board
- 414
- Council district
- 31
- Block / lot
- 15716 / 24
- Assessed value
- $48,480
- Landmark / historic district
- No
HPD registration #410265, last renewed Jul 30, 2024.
Questions about 11-28 Dickens Street
Who owns 11-28 Dickens Street?
The owner of record in NYC Department of City Planning PLUTO data is 1128a Dickens Street LLC.
Does 11-28 Dickens Street have violations?
Yes. NYC HPD has recorded 117 housing violations at this property.
Is 11-28 Dickens Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 11-28 Dickens Street built?
City records list 1920 as the year it was built.
How many apartments are in 11-28 Dickens Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.