roofy

15-20 Beach 12 Street

Queens, NY 11691BBL 4-15502-0011Map

Owner of record: Rodney, Caswell

15-20 Beach 12 Street is a two-family home built in 1945 in Queens, 11691. It has 2 residential units across 1 floor. The owner of record is Rodney, Caswell. HPD has recorded 35 housing violations here, most recently on August 25, 2015. 34 of the 35 most recent violations are still open.

HPD violations
35
DOB violations
1
ECB violations
0
HPD complaints
64

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Aug 25, 2015

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 35

  • B

    Properly repair with similar material the broken or defective concrete stair tread 1st up from landing at front entrance steps

    Aug 25, 2015

    Open — Nov sent out
  • B

    Properly repair the broken or defective electric outlet on walls in the 1st room from east at south located at apt 2fl, 1st story

    Aug 25, 2015 · Apt 2FL

    Open — Nov sent out
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed electric wire at light switch on south wall in the 2nd room from east at south located at apt 2fl, 1st story

    Aug 25, 2015 · Apt 2FL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in private hall and walls in the 4th room from east at south located at apt 2fl, 1st story

    Aug 25, 2015 · Apt 2FL

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 4th room from east at south located at apt 2fl, 1st story

    Aug 25, 2015 · Apt 2FL

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak over ceiling in private hall in the 4th room from east at south located at apt 2fl, 1st story

    Aug 25, 2015 · Apt 2FL

    Open — Nov sent out
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east

    Jul 23, 2015 · Apt 2FL

    Open — Nov sent out
  • A

    Replace with new the missing receptacle plate at west wall in the 1st room from east located at apt 2fl, 2nd story, 1st apartment from north at east

    Jul 23, 2015 · Apt 2FL

    Open — Nov sent out
  • A

    Properly repair and abate unsafe electric wiring condition consisting of exposed wires at north wall in the 3rd room from east located at apt 2fl, 2nd story, 1st apartment from north at east

    Jul 23, 2015 · Apt 2FL

    Open — Nov sent out
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east

    Jul 23, 2015 · Apt 2FL

    Open — Nov sent out
Show 25 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from north at east located at apt 2fl, 2nd story, 1st apartment from west at north

    Jun 11, 2015 · Apt 2FL

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling in the 1st room from north at east located at apt 2fl, 2nd story, 1st apartment from west at north

    Jun 11, 2015 · Apt 2FL

    Open — Nov sent out
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... west wall in the 1st room from north at east located at apt 2fl, 2nd story, 1st apartment from west at north

    Jun 11, 2015 · Apt 2FL

    Open — Nov sent out
  • B

    Properly repair the broken or defective ceiling light fixture in the 2nd room from north at east located at apt 2fl, 2nd story, apartment at north

    Jun 11, 2015 · Apt 2FL

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; missing one way screws and 1 window guard in the entire apartment located at apt 2fl, 2nd story

    Jun 11, 2015 · Apt 2FL

    Closed — Violation closed
  • B

    Repair the broken or defective connection waste line at sink in the kitchen located at apt 2fl, 2nd story

    Jun 11, 2015 · Apt 2FL

    Open — Nov sent out
  • B

    Properly repair the broken or defective electrical outlets through out in the entire apartment located at apt 2fl, 2nd story, 1st apartment from west at north

    Jun 11, 2015 · Apt 2FL

    Open — Nov sent out
  • B

    Replace with new the missing upper sash window glass in the 1st bedroom from east located at apt 1 fl, 1st story, 1st apartment from west at north

    Dec 18, 2013 · Apt 1 FL

    Open — Nov sent out
  • C

    Trace and repair the source and abate the nuisance consisting of mold ... walls and ceiling in the entire apartment located at apt 1 fl, 1st story, 1st apartment from west at north

    Dec 18, 2013 · Apt 1 FL

    Open — Nov sent out
  • B

    Abate the nuisance consisting of nailed shut windows in the entire apartment located at apt 1 fl, 1st story, 1st apartment from west at north

    Dec 18, 2013 · Apt 1 FL

    Open — Nov sent out
  • B

    Replace with new the broken or defective doors in the entire apartment located at apt 1 fl, 1st story, 1st apartment from west at north

    Dec 18, 2013 · Apt 1 FL

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st living room from north located at apt 2 fl, 2nd story, 1st apartment from west at north

    Dec 18, 2013 · Apt 2 FL

    Open — Nov sent out
  • A

    Properly repair the broken or defective boiler duct brace at ceiling at boiler room

    Dec 18, 2013

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling. in the bathroom located at apt 1fl, 1st story

    Apr 26, 2006 · Apt 1FL

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in waste line at wash basin. in the bathroom located at apt 1fl, 1st story

    Apr 26, 2006 · Apt 1FL

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in water closet. in the bathroom located at apt 1fl, 1st story

    Apr 26, 2006 · Apt 1FL

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 1fl

    Dec 17, 2005 · Apt 1FL

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 1fl

    Dec 17, 2005 · Apt 1FL

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2, 1st story

    Nov 1, 2005 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceilings in the entire apartment located at apt 2, 1st story

    Nov 1, 2005 · Apt 2

    Open — Nov sent out
  • A

    Refit door in the 1st room from north at east located at apt 2, 1st story

    Nov 1, 2005 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color walls in the 1st room from east at south located at apt 2, 1st story

    Nov 1, 2005 · Apt 2

    Open — Nov sent out
  • C

    Trace and repair the source and abate the nuisance consisting of mold ... north and east wall in the 1st room from north at east located at apt 2, 1st story

    Nov 1, 2005 · Apt 2

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2, 1st story

    Nov 1, 2005 · Apt 2

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2, 1st story

    Nov 1, 2005 · Apt 2

    Open — Nov sent out

DOB building violations · 1

  • Construction other optional

    C-construction other optional

    Mar 7, 2011

    Dob violation - active

ECB violations · 0

No ECB violations on record

Complaints

  • Water leak

    Heavy flow

    Aug 21, 2015 · Apt 2FL

    Close
  • Water leak

    Heavy flow

    Aug 21, 2015 · Apt 2FL

    Close
  • Paint/plaster

    Ceiling

    Aug 21, 2015 · Apt 2FL

    Close
  • Electric

    No lighting

    Jul 21, 2015 · Apt 2FL

    Close
  • Water leak

    Heavy flow

    Jul 21, 2015 · Apt 2FL

    Close
  • Electric

    Outlet/switch

    Jul 21, 2015 · Apt 2FL

    Close
  • Electric

    Wiring

    Jul 21, 2015 · Apt 2FL

    Close
  • Paint/plaster

    Ceiling

    Jul 21, 2015 · Apt 2FL

    Close
  • Electric

    No lighting

    Jul 15, 2015 · Apt 2

    Close
  • Electric

    No lighting

    Jul 15, 2015 · Apt 2

    Close
Show 40 more ↓
  • Electric

    Outlet/switch

    Jul 15, 2015 · Apt 2

    Close
  • Electric

    Outlet/switch

    Jul 15, 2015 · Apt 2

    Close
  • Water leak

    Heavy flow

    Jul 15, 2015 · Apt 2

    Close
  • Electric

    Lighting

    Jun 8, 2015 · Apt 2FL

    Close
  • Water leak

    Heavy flow

    Jun 8, 2015 · Apt 2FL

    Close
  • Paint/plaster

    Ceiling

    Jun 8, 2015 · Apt 2FL

    Close
  • Water leak

    Slow leak

    Sep 18, 2014 · Apt 2FL

    Close
  • Paint/plaster

    Ceiling

    Sep 18, 2014 · Apt 2FL

    Close
  • Heating

    Heat related

    Mar 22, 2013 · Apt 2

    Close
  • Heating

    Heat related

    Mar 21, 2013 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Feb 13, 2013 · Apt GRDFL

    Close
  • General

    Mold

    Feb 13, 2013 · Apt GRDFL

    Close
  • Plumbing

    Water-leaks

    Feb 13, 2013 · Apt GRDFL

    Close
  • Paint/plaster

    Wall

    Feb 13, 2013 · Apt GRDFL

    Close
  • Paint/plaster

    Wall

    Feb 13, 2013 · Apt GRDFL

    Close
  • Plumbing

    Water-leaks

    Feb 13, 2013 · Apt GRDFL

    Close
  • Plumbing

    Water-leaks

    Feb 13, 2013 · Apt GRDFL

    Close
  • Paint/plaster

    Wall

    Feb 13, 2013 · Apt GRDFL

    Close
  • General

    Mold

    Nov 30, 2012 · Apt 2

    Close
  • Heating

    Heat related

    Nov 30, 2012 · Apt 2

    Close
  • Electric

    Electric-supply

    Jun 15, 2006 · Apt 1

    Close
  • Electric

    Electric-supply

    Jun 15, 2006 · Apt 2

    Close
  • Plumbing

    Sewer

    Apr 26, 2006 · Apt 1FL

    Close
  • Plumbing

    Basin/sink

    Apr 26, 2006 · Apt 1FL

    Close
  • Plumbing

    Basin/sink

    Apr 26, 2006 · Apt 1FL

    Close
  • Plumbing

    Toilet

    Apr 26, 2006 · Apt 1FL

    Close
  • Plumbing

    Water supply

    Apr 26, 2006 · Apt 1FL

    Close
  • Plumbing

    Water supply

    Apr 26, 2006 · Apt 2FL

    Close
  • Plumbing

    Sewer

    Apr 21, 2006 · Apt 1FL

    Close
  • Plumbing

    Basin/sink

    Apr 21, 2006 · Apt 1FL

    Close
  • Plumbing

    Toilet

    Apr 21, 2006 · Apt 1FL

    Close
  • Plumbing

    Water-leaks

    Apr 20, 2006 · Apt 1FL

    Close
  • Heating

    Heat related

    Dec 12, 2005 · Apt 1FL

    Close
  • Heating

    Heat related

    Nov 20, 2005 · Apt GRD

    Close
  • Plumbing

    Water-leaks

    Oct 29, 2005 · Apt 2FL

    Close
  • Paint/plaster

    Wall

    Oct 29, 2005 · Apt 2FL

    Close
  • Heating

    Heat related

    Oct 29, 2005 · Apt 2FL

    Close
  • General

    Mold

    Oct 29, 2005 · Apt 2FL

    Close
  • Nonconst

    Vermin

    Oct 29, 2005 · Apt 2FL

    Close
  • Nonconst

    Vermin

    Oct 29, 2005 · Apt 2FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B2)
Year built
1945
Floors
1
Residential units
2
Building area
1,380 ft²
Lot area
2,130 ft²
Zoning
R5
Community board
414
Council district
31
Block / lot
15502 / 11
Assessed value
$35,040
Landmark / historic district
No

Questions about 15-20 Beach 12 Street

Who owns 15-20 Beach 12 Street?

The owner of record in NYC Department of City Planning PLUTO data is Rodney, Caswell.

Does 15-20 Beach 12 Street have violations?

Yes. NYC HPD has recorded 35 housing violations at this property.

Is 15-20 Beach 12 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 15-20 Beach 12 Street built?

City records list 1945 as the year it was built.

How many apartments are in 15-20 Beach 12 Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.