245-44 148 Drive
Queens, NY 11422BBL 4-13643-0024Map
Owner of record: Germain Andre
245-44 148 Drive is a two-family home built in 1960 in Queens, 11422. It has 2 residential units across 2 floors. The owner of record is Germain Andre. HPD has recorded 19 housing violations here, most recently on February 1, 2019. 18 of the 19 most recent violations are still open.
- HPD violations
- 19
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 17
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 19
- BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling (4 sq. ft.) in the bathroom located at apt 1fl, 1st story original violation 12889764 issued 01-feb-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Feb 1, 2019 · Apt 1FL
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... at ceiling (4 sq. ft.) in the bathroom located at apt 1fl, 1st story
Feb 1, 2019 · Apt 1FL
Closed — Violation closed - ANon-hazardous
Repair the leaky and/or defective water supply pipe shower head in the bathroom located at apt 1fl, 1st story
Feb 1, 2019 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective lower sash window in the 2nd room from north located at apt 1fl, 1st story
Feb 1, 2019 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective lower sash window in the 1st room from north at west located at apt 1fl, 1st story
Feb 1, 2019 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroom located at apt 1fl, 1st story
Feb 1, 2019 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and east wall in the bathroom located at apt 1fl, 1st story
Feb 1, 2019 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder lock at metal gate door in the entrance located at apt 1fl, 1st story
Feb 1, 2019 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective connection wasteline at washbasin in the bathroom located at apt 1fl, 1st story
Feb 1, 2019 · Apt 1FL
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling ( approx 4 sq ft ) in the 1st bathroom from north located at apt 1stfl, 1st story, 1st apartment from east at south
Nov 21, 2018 · Apt 1STFL
Open — Nov sent out
Show 9 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 1st bathroom from north located at apt 1stfl, 1st story, 1st apartment from east at south
Nov 21, 2018 · Apt 1STFL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak moisture penetrating east wall in the 1st room from north at east located at apt 1stfl, 1st story, 1st apartment from east at south
Nov 21, 2018 · Apt 1STFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st bathroom from north located at apt 1stfl, 1st story, 1st apartment from east at south
Nov 21, 2018 · Apt 1STFL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the 1st bathroom from north located at apt 1stfl, 1st story, 1st apartment from east at south
Nov 21, 2018 · Apt 1STFL
Open — Nov sent out - BHazardous
Replace with new the broken or defective marble saddle in the 1st bathroom from north located at apt 1stfl, 1st story, 1st apartment from east at south
Nov 21, 2018 · Apt 1STFL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color east wall in the 1st room from north at east located at apt 1stfl, 1st story, 1st apartment from east at south
Nov 21, 2018 · Apt 1STFL
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1stfl, 1st story, 1st apartment from east at south
Nov 21, 2018 · Apt 1STFL
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock install at metal security door in the entrance located at apt 1stfl, 1st story, 1st apartment from east at south
Nov 21, 2018 · Apt 1STFL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling at south center at cellar
Nov 21, 2018
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Hazardous
Work without a permit: illegal work noted at cellar level: a 3 piece bathroom, as well as a sink in what used to be kitchen area has been installed. remedy: obtain approvals and permits for work stated above
Aug 23, 1999
Resolve
Complaints
- Unsanitary condition
Mold
Jan 30, 2019 · Apt 1FL
Close - Plumbing
Bathtub/shower
Jan 30, 2019 · Apt 1FL
Close - Door/window
Window frame
Jan 30, 2019 · Apt 1FL
Close - Door/window
Window frame
Jan 30, 2019 · Apt 1FL
Close - Water leak
Slow leak
Jan 30, 2019 · Apt 1FL
Close - Door/window
Door
Jan 30, 2019 · Apt 1FL
Close - Plumbing
Basin/sink
Jan 30, 2019 · Apt 1FL
Close - Unsanitary condition
Mold
Nov 3, 2018 · Apt 1STFL
Close - Unsanitary condition
Mold
Nov 3, 2018 · Apt 1STFL
Close - Unsanitary condition
Mold
Nov 3, 2018 · Apt 1STFL
Close
Show 7 more ↓
- Plumbing
Bathtub/shower
Nov 3, 2018 · Apt 1STFL
Close - Water leak
Slow leak
Nov 3, 2018 · Apt 1STFL
Close - Water leak
Slow leak
Nov 3, 2018 · Apt 1STFL
Close - Unsanitary condition
Mold
Apr 19, 2018 · Apt 1
Close - Plumbing
Bathtub/shower
Apr 19, 2018 · Apt 1
Close - Water leak
Slow leak
Apr 19, 2018 · Apt 1
Close - Heat/hot water
Apartment only
Nov 23, 2015 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1960
- Floors
- 2
- Residential units
- 2
- Building area
- 2,750 ft²
- Lot area
- 4,000 ft²
- Zoning
- R3X
- Community board
- 413
- Council district
- 31
- Block / lot
- 13643 / 24
- Assessed value
- $82,920
- Landmark / historic district
- No
Questions about 245-44 148 Drive
Who owns 245-44 148 Drive?
The owner of record in NYC Department of City Planning PLUTO data is Germain Andre.
Does 245-44 148 Drive have violations?
Yes. NYC HPD has recorded 19 housing violations at this property.
Is 245-44 148 Drive rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 245-44 148 Drive built?
City records list 1960 as the year it was built.
How many apartments are in 245-44 148 Drive?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.