roofy

250-11 Hook Creek Boulevard

Queens, NY 11422BBL 4-13625-0005Map

Owner of record: Aime, Carole

250-11 Hook Creek Boulevard is a mixed residential and retail building built in 1925 in Queens, 11422. It has 1 residential unit across 2 floors. The owner of record is Aime, Carole. HPD has recorded 60 housing violations here, most recently on August 26, 2026. 20 of the 50 most recent violations are still open.

HPD violations
60
DOB violations
11
ECB violations
1
HPD complaints
20

What to know

Concern
17 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 26, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 60

  • C

    Abate the nuisance consisting of hot water exceeding maximum allowable temp of 130 degrees at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east

    Aug 26, 2026 · Apt 2FL

    Closed — Violation closed
  • A

    Abate the nuisance consisting of rusty radiator at east wall in the 5th room from east at north located at apt 2fl, 2nd story, 1st apartment from north at east

    Aug 26, 2026 · Apt 2FL

    Open — Civ14 mailed
  • A

    Abate the nuisance consisting of rusty radiator at west wall in the 4th room from east located at apt 2fl, 2nd story, 1st apartment from north at east

    Aug 26, 2026 · Apt 2FL

    Open — Civ14 mailed
  • C

    Abate the nuisance consisting of scalding hot water (at 160 degrees f.) exceeding the maximum allowable temperature of 130 degrees (f) at all fixtures creating a hazard. in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 13, 2025 · Apt 2FL

    Open — Not complied with
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 13, 2025 · Apt 2FL

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in uniform color at the east wall in the 4th room from east located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 13, 2025 · Apt 2FL

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame in the 5th room from east at north located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st door frame from west at north wall, 1st window frame from south at west wall in the 5th room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, east wall in the 4th room from east located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Open — Defect letter issued
Show 40 more ↓
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at west wall, 1st door frame from south at west wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall in the foyer located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from west at north wall in the 1st room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from south at west wall in the 1st room from east at north located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall in the private hallway located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door, 1st window frame from south at west wall in the 5th room from east at north located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from north at east wall in the 5th room from east at north located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from south at west wall in the 4th room from east located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from west at north wall in the foyer located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall in the 1st room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the private hallway located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall, ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 7, 2025 · Apt 2FL

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 3, 2025

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood base cabinets at east wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 1, 2025 · Apt 2FL

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the 4th room from east located at apt 2fl, 2nd story, 1st apartment from north at east

    Nov 1, 2025 · Apt 2FL

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 6th room from east, the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Jul 17, 2025 · Apt 2

    Closed — Violation closed
  • C

    Abate the nuisance consisting of hot water exceeding maximum allowable temparature of 130 degrees at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Jul 11, 2025 · Apt 2

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt second, 2nd story, 1st apartment from north at east

    Mar 25, 2025 · Apt SECOND

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt second, 2nd story, 1st apartment from north at east

    Mar 25, 2025 · Apt SECOND

    Closed — Violation closed
  • C

    Abate the nuisance consisting of hot water exceeding the maximum allowable temperature of 130 degrees fahrenheit at all hot water fixtures in the entire apartment located at apt 2 , 2nd story, 1st apartment from north at east

    Mar 20, 2025 · Apt 2

    Open — Not complied with
  • C

    Remove the illegal double cylinder key operated locking device at door . in the entrance located at apt 2 , 2nd story, 1st apartment from north at east

    Mar 20, 2025 · Apt 2

    Open — Not complied with
  • A

    Properly repair or replace the broken or defective storm door at building front entrance , 1st story

    Mar 8, 2025

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the 1st room from north located at apt 2, 2nd story, 1st apartment from north at east

    Mar 5, 2025 · Apt 2

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east

    Feb 8, 2025 · Apt 2FL

    Closed — Violation dismissed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 2fl, 2nd story, 1st apartment from north at east

    Feb 8, 2025 · Apt 2FL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east

    Feb 8, 2025 · Apt 2FL

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 4th room from east located at apt 2fl, 2nd story, 1st apartment from north at east

    Feb 8, 2025 · Apt 2FL

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over ceiling in the 5th room from east located at apt 2fl, 2nd story, 1st apartment from north at east

    Feb 3, 2025 · Apt 2FL

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the 4th room from east located at apt 2floor, 2nd story, 1st apartment from north at east

    Feb 3, 2025 · Apt 2FLOOR

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 6th room from east, the 1st room from east at south, the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east

    Feb 3, 2025 · Apt 2FLOOR

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2floor, 2nd story, 1st apartment from north at east

    Feb 3, 2025 · Apt 2FLOOR

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 4th room from east located at apt 2floor, 2nd story, 1st apartment from north at east

    Feb 3, 2025 · Apt 2FLOOR

    Closed — Violation closed
  • C

    Remove the illegal double cylinder key operated locking device at door at apartment entrance located at apt 2fl, 2nd story, 1st apartment from north at east

    Feb 3, 2025 · Apt 2FL

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east

    Feb 3, 2025 · Apt 2FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood base cabinets at east wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east

    Feb 3, 2025 · Apt 2FL

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the 4th room from east located at apt 2fl, 2nd story, 1st apartment from north at east

    Feb 3, 2025 · Apt 2FL

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over ceiling in the 5th room from east located at apt 2floor, 2nd story, 1st apartment from north at east

    Jan 29, 2025 · Apt 2FLOOR

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective drop ceiling in the 5th room from east located at apt 2floor, 2nd story, 1st apartment from north at east

    Jan 29, 2025 · Apt 2FLOOR

    Open — Not complied with
  • C

    Remove the illegal double cylinder key operated locking device at door at apartment entrance in the private hallway located at apt 2floor, 2nd story, 1st apartment from north at east

    Jan 29, 2025 · Apt 2FLOOR

    Open — Not complied with

DOB building violations · 11

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
Show 1 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active

ECB violations · 1

  • Non-hazardous

    B4b,bq9,36,24b,32a,50,50a,b,c,d,21b. bq9 work w/o permit 50 brass syphon tube missing from pressure guage 50a pop safety valve in horizontal position and missing discharge pipe. 50b smoke pipe supported with

    Oct 29, 2007

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Nov 16, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Nov 14, 2025 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Nov 13, 2025 · Apt 2FLOOR

    Close
  • Heat/hot water

    Apartment only

    Nov 12, 2025 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Nov 11, 2025 · Apt 2FL

    Open
  • Heat/hot water

    Entire building

    Nov 7, 2025 · Apt 2FLOOR

    Close
  • Heat/hot water

    Apartment only

    Oct 28, 2025 · Apt 2FL

    Close
  • Plumbing

    Water supply

    Jun 11, 2025 · Apt 2NDFL

    Close
  • Electric

    Power outage

    Jun 5, 2025 · Apt 2NDFL

    Close
  • Heat/hot water

    Apartment only

    Mar 20, 2025 · Apt 2NDFLO

    Close
Show 10 more ↓
  • Heat/hot water

    Apartment only

    Mar 19, 2025 · Apt SECOND

    Close
  • Heat/hot water

    Apartment only

    Mar 8, 2025 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Mar 7, 2025 · Apt 2ND

    Close
  • Heat/hot water

    Apartment only

    Mar 4, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2025 · Apt 2FL

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2025 · Apt 2FLOOR

    Close
  • Paint/plaster

    Ceiling

    Mar 13, 2009 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Mar 13, 2009 · Apt 2

    Close
  • General

    Mold

    Mar 13, 2009 · Apt 2

    Close
  • Heating

    Heat related

    Mar 1, 2009 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S1)
Year built
1925
Floors
2
Residential units
1
Building area
2,080 ft²
Lot area
2,160 ft²
Zoning
R3X
Community board
413
Council district
31
Block / lot
13625 / 5
Assessed value
$42,720
Landmark / historic district
No

HPD registration #914743, last renewed Apr 9, 2026.

Questions about 250-11 Hook Creek Boulevard

Who owns 250-11 Hook Creek Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is Aime, Carole.

Does 250-11 Hook Creek Boulevard have violations?

Yes. NYC HPD has recorded 60 housing violations at this property.

Is 250-11 Hook Creek Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 250-11 Hook Creek Boulevard built?

City records list 1925 as the year it was built.

How many apartments are in 250-11 Hook Creek Boulevard?

It has 1 residential units and 2 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.