250-11 Hook Creek Boulevard
Queens, NY 11422BBL 4-13625-0005Map
Owner of record: Aime, Carole
250-11 Hook Creek Boulevard is a mixed residential and retail building built in 1925 in Queens, 11422. It has 1 residential unit across 2 floors. The owner of record is Aime, Carole. HPD has recorded 60 housing violations here, most recently on August 26, 2026. 20 of the 50 most recent violations are still open.
- HPD violations
- 60
- DOB violations
- 11
- ECB violations
- 1
- HPD complaints
- 20
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 60
- CImmediately hazardous
Abate the nuisance consisting of hot water exceeding maximum allowable temp of 130 degrees at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Aug 26, 2026 · Apt 2FL
Closed — Violation closed - ANon-hazardous
Abate the nuisance consisting of rusty radiator at east wall in the 5th room from east at north located at apt 2fl, 2nd story, 1st apartment from north at east
Aug 26, 2026 · Apt 2FL
Open — Civ14 mailed - ANon-hazardous
Abate the nuisance consisting of rusty radiator at west wall in the 4th room from east located at apt 2fl, 2nd story, 1st apartment from north at east
Aug 26, 2026 · Apt 2FL
Open — Civ14 mailed - CImmediately hazardous
Abate the nuisance consisting of scalding hot water (at 160 degrees f.) exceeding the maximum allowable temperature of 130 degrees (f) at all fixtures creating a hazard. in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 13, 2025 · Apt 2FL
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 13, 2025 · Apt 2FL
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color at the east wall in the 4th room from east located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 13, 2025 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame in the 5th room from east at north located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st door frame from west at north wall, 1st window frame from south at west wall in the 5th room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, east wall in the 4th room from east located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Open — Defect letter issued
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at west wall, 1st door frame from south at west wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall in the foyer located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from west at north wall in the 1st room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from south at west wall in the 1st room from east at north located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall in the private hallway located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door, 1st window frame from south at west wall in the 5th room from east at north located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from north at east wall in the 5th room from east at north located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from south at west wall in the 4th room from east located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from west at north wall in the foyer located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall in the 1st room from east at south located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the private hallway located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall, ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 7, 2025 · Apt 2FL
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood base cabinets at east wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 1, 2025 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 4th room from east located at apt 2fl, 2nd story, 1st apartment from north at east
Nov 1, 2025 · Apt 2FL
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 6th room from east, the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Jul 17, 2025 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding maximum allowable temparature of 130 degrees at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jul 11, 2025 · Apt 2
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt second, 2nd story, 1st apartment from north at east
Mar 25, 2025 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt second, 2nd story, 1st apartment from north at east
Mar 25, 2025 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding the maximum allowable temperature of 130 degrees fahrenheit at all hot water fixtures in the entire apartment located at apt 2 , 2nd story, 1st apartment from north at east
Mar 20, 2025 · Apt 2
Open — Not complied with - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door . in the entrance located at apt 2 , 2nd story, 1st apartment from north at east
Mar 20, 2025 · Apt 2
Open — Not complied with - ANon-hazardous
Properly repair or replace the broken or defective storm door at building front entrance , 1st story
Mar 8, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from north located at apt 2, 2nd story, 1st apartment from north at east
Mar 5, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Feb 8, 2025 · Apt 2FL
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 2fl, 2nd story, 1st apartment from north at east
Feb 8, 2025 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from north at east
Feb 8, 2025 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 4th room from east located at apt 2fl, 2nd story, 1st apartment from north at east
Feb 8, 2025 · Apt 2FL
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the 5th room from east located at apt 2fl, 2nd story, 1st apartment from north at east
Feb 3, 2025 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the 4th room from east located at apt 2floor, 2nd story, 1st apartment from north at east
Feb 3, 2025 · Apt 2FLOOR
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 6th room from east, the 1st room from east at south, the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east
Feb 3, 2025 · Apt 2FLOOR
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2floor, 2nd story, 1st apartment from north at east
Feb 3, 2025 · Apt 2FLOOR
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 4th room from east located at apt 2floor, 2nd story, 1st apartment from north at east
Feb 3, 2025 · Apt 2FLOOR
Closed — Violation closed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door at apartment entrance located at apt 2fl, 2nd story, 1st apartment from north at east
Feb 3, 2025 · Apt 2FL
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2fl, 2nd story, 1st apartment from north at east
Feb 3, 2025 · Apt 2FL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood base cabinets at east wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from north at east
Feb 3, 2025 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 4th room from east located at apt 2fl, 2nd story, 1st apartment from north at east
Feb 3, 2025 · Apt 2FL
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 5th room from east located at apt 2floor, 2nd story, 1st apartment from north at east
Jan 29, 2025 · Apt 2FLOOR
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective drop ceiling in the 5th room from east located at apt 2floor, 2nd story, 1st apartment from north at east
Jan 29, 2025 · Apt 2FLOOR
Open — Not complied with - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door at apartment entrance in the private hallway located at apt 2floor, 2nd story, 1st apartment from north at east
Jan 29, 2025 · Apt 2FLOOR
Open — Not complied with
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active
ECB violations · 1
- Non-hazardous
B4b,bq9,36,24b,32a,50,50a,b,c,d,21b. bq9 work w/o permit 50 brass syphon tube missing from pressure guage 50a pop safety valve in horizontal position and missing discharge pipe. 50b smoke pipe supported with
Oct 29, 2007
Resolve
Complaints
- Heat/hot water
Apartment only
Nov 16, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Nov 14, 2025 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Nov 13, 2025 · Apt 2FLOOR
Close - Heat/hot water
Apartment only
Nov 12, 2025 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Nov 11, 2025 · Apt 2FL
Open - Heat/hot water
Entire building
Nov 7, 2025 · Apt 2FLOOR
Close - Heat/hot water
Apartment only
Oct 28, 2025 · Apt 2FL
Close - Plumbing
Water supply
Jun 11, 2025 · Apt 2NDFL
Close - Electric
Power outage
Jun 5, 2025 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Mar 20, 2025 · Apt 2NDFLO
Close
Show 10 more ↓
- Heat/hot water
Apartment only
Mar 19, 2025 · Apt SECOND
Close - Heat/hot water
Apartment only
Mar 8, 2025 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Mar 7, 2025 · Apt 2ND
Close - Heat/hot water
Apartment only
Mar 4, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Jan 31, 2025 · Apt 2FL
Close - Heat/hot water
Apartment only
Jan 27, 2025 · Apt 2FLOOR
Close - Paint/plaster
Ceiling
Mar 13, 2009 · Apt 2
Close - Appliance
Electric/gas range
Mar 13, 2009 · Apt 2
Close - General
Mold
Mar 13, 2009 · Apt 2
Close - Heating
Heat related
Mar 1, 2009 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S1)
- Year built
- 1925
- Floors
- 2
- Residential units
- 1
- Building area
- 2,080 ft²
- Lot area
- 2,160 ft²
- Zoning
- R3X
- Community board
- 413
- Council district
- 31
- Block / lot
- 13625 / 5
- Assessed value
- $42,720
- Landmark / historic district
- No
HPD registration #914743, last renewed Apr 9, 2026.
Questions about 250-11 Hook Creek Boulevard
Who owns 250-11 Hook Creek Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Aime, Carole.
Does 250-11 Hook Creek Boulevard have violations?
Yes. NYC HPD has recorded 60 housing violations at this property.
Is 250-11 Hook Creek Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 250-11 Hook Creek Boulevard built?
City records list 1925 as the year it was built.
How many apartments are in 250-11 Hook Creek Boulevard?
It has 1 residential units and 2 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.