221-20 137 Avenue
Queens, NY 11413BBL 4-13127-0023Map
Owner of record: Billey, Alexis
221-20 137 Avenue is a two-family home built in 1950 in Queens, 11413. It has 2 residential units across 1.67 floors. The owner of record is Billey, Alexis. HPD has recorded 21 housing violations here, most recently on August 17, 2018. 21 of the 21 most recent violations are still open.
- HPD violations
- 21
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 29
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 21
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Aug 17, 2018
Open — Info nov sent out - BHazardous
Properly repair with similar material the broken or defective linoleum tiles at floor in the kitchen located at apt second, 2nd story
Aug 15, 2018 · Apt SECOND
Open — Nov sent out - BHazardous
Repair the broken or defective connection at waste pipe at sink in the kitchen located at apt second, 2nd story
Aug 15, 2018 · Apt SECOND
Open — Nov sent out - BHazardous
Properly repair the broken or defective window inoperable in the kitchen located at apt second, 2nd story
Aug 15, 2018 · Apt SECOND
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of extremely hot water (152 degrees fahrenheit) in the entire apartment located at apt second, 2nd story
Aug 15, 2018 · Apt SECOND
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at south wall / window and window frame in the bathroom located at apt second, 2nd story
Aug 15, 2018 · Apt SECOND
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt second, 2nd story
Aug 15, 2018 · Apt SECOND
Open — Nov sent out - ANon-hazardous
Refit door to 2nd story balcony in the 4th room from east at north located at apt second, 2nd story
Aug 15, 2018 · Apt SECOND
Open — Nov sent out - BHazardous
Properly repair the broken or defective light fixture at ceiling in the private hallway located at apt second, 2nd story
Aug 15, 2018 · Apt SECOND
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock installed at b storm metal door to balcony in the 1st room from north located at apt 2, 2nd story
Aug 10, 2018 · Apt 2
Open — Nov sent out
Show 11 more ↓
- BHazardous
Properly repair with similar material the broken or defective wooden door to balcony in the 1st room from north located at apt 2, 2nd story
Aug 10, 2018 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden lower sash in the 1st room from north located at apt 2, 2nd story
Aug 10, 2018 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical fixture at ceiling in the private hallway located at apt 2, 2nd story
Aug 10, 2018 · Apt 2
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... 2 sq, ft at west wall in the bathroom located at apt 2, 2nd story
Aug 10, 2018 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department window frame in the bathroom located at apt 2, 2nd story
Aug 10, 2018 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder lock at metal security door at entrance door building located at apt 2, 1st story
Aug 10, 2018 · Apt 2
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 10, 2018
Open — Nov sent out - BHazardous
Abate the nuisance consisting of broken plexi glass at storm metal door to balcony in the 1st room from north located at apt 2, 2nd story
Aug 10, 2018 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective lower window sash in the kitchen located at apt 2, 2nd story
Aug 10, 2018 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tile in the kitchen located at apt 2, 2nd story
Aug 10, 2018 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story
Aug 10, 2018 · Apt 2
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Electric
No lighting
Aug 8, 2018 · Apt SECOND
Close - Heat/hot water
Apartment only
Aug 8, 2018 · Apt SECOND
Close - Door/window
Door
Aug 8, 2018 · Apt SECOND
Close - Door/window
Door
Aug 8, 2018 · Apt SECOND
Close - Door/window
Door
Aug 8, 2018 · Apt SECOND
Close - Electric
Lighting
Aug 8, 2018 · Apt SECOND
Close - Water leak
Slow leak
Aug 8, 2018 · Apt SECOND
Close - Flooring/stairs
Floor
Aug 8, 2018 · Apt SECOND
Close - Plumbing
Toilet
Aug 8, 2018 · Apt SECOND
Close - Unsanitary condition
Mold
Aug 8, 2018 · Apt SECOND
Close
Show 19 more ↓
- Unsanitary condition
Mold
Aug 3, 2018 · Apt 2
Close - Plumbing
Radiator
Aug 3, 2018 · Apt 2
Close - Door/window
Window pane
Aug 3, 2018 · Apt 2
Close - Door/window
Window pane
Aug 3, 2018 · Apt 2
Close - Door/window
Door
Aug 3, 2018 · Apt 2
Close - Water leak
Damp spot
Aug 3, 2018 · Apt 2
Close - Electric
Outlet/switch
Feb 12, 2018 · Apt 2FL
Close - Water leak
Slow leak
Feb 12, 2018 · Apt 2FL
Close - Electric
Outlet/switch
Feb 12, 2018 · Apt 2FL
Close - Electric
Outlet/switch
Feb 12, 2018 · Apt 2FL
Close - Door/window
Window pane
Feb 12, 2018 · Apt 2FL
Close - Door/window
Door
Feb 8, 2018 · Apt 2
Close - Door/window
Window pane
Feb 8, 2018 · Apt 2
Close - Door/window
Window pane
Feb 8, 2018 · Apt 2
Close - Flooring/stairs
Floor
Feb 8, 2018 · Apt 2
Close - Water leak
Slow leak
Feb 8, 2018 · Apt 2
Close - Heat/hot water
Apartment only
Feb 8, 2018 · Apt 2
Close - Plumbing
Radiator
Feb 8, 2018 · Apt 2
Close - Heat/hot water
Entire building
Dec 24, 2014 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| May 6, 2026 | $850,000 | Two family dwellings | 2 |
Building details
- Building type
- Two-family home (B1)
- Year built
- 1950
- Floors
- 1.67
- Residential units
- 2
- Building area
- 1,544 ft²
- Lot area
- 6,468 ft²
- Zoning
- R2A
- Community board
- 413
- Council district
- 31
- Block / lot
- 13127 / 23
- Assessed value
- $47,340
- Landmark / historic district
- No
Questions about 221-20 137 Avenue
Who owns 221-20 137 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Billey, Alexis.
Does 221-20 137 Avenue have violations?
Yes. NYC HPD has recorded 21 housing violations at this property.
Is 221-20 137 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 221-20 137 Avenue built?
City records list 1950 as the year it was built.
How many apartments are in 221-20 137 Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.