140-11 169 Street
Queens, NY 11434BBL 4-12587-0057Map
Owner of record: Baptiste, Federline
140-11 169 Street is a two-family home built in 1920 in Queens, 11434. It has 2 residential units across 2 floors. The owner of record is Baptiste, Federline. HPD has recorded 19 housing violations here, most recently on January 2, 2015. 16 of the 19 most recent violations are still open.
- HPD violations
- 19
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 57
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 19
- BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet - in the bathroom located at apt 2, 2nd story
Jan 2, 2015 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective connection at drain pipe under sink in the kitchen located at apt 2, 2nd story
Jan 2, 2015 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective door bell from 1 sty front to 2 sty in the entrance located at apt 2, 2nd story
Jan 2, 2015 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall at closet in the 1st room from east at south located at apt 2, 2nd story
May 18, 2014 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 2, 2nd story
May 18, 2014 · Apt 2
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at gate at front yard
May 18, 2014
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile wall. in the bathroom located at apt 2, 2nd story
Jul 5, 2013 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets bathtub. in the bathroom located at apt 2, 2nd story
Jul 5, 2013 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 2, 2nd story
Jul 5, 2013 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets bathtub. in the bathroom located at apt 2, 2nd story
May 1, 2013 · Apt 2
Open — Certification postponment granted
Show 9 more ↓
- ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 2, 2nd story
May 1, 2013 · Apt 2
Open — Certification postponment granted - BHazardous
Properly repair with similar material the broken or defective ceramic tile wall. in the bathroom located at apt 2, 2nd story
May 1, 2013 · Apt 2
Open — Certification postponment granted - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling. in the bathroom located at apt 2, 2nd story
May 1, 2013 · Apt 2
Open — Certification postponment granted - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 1, 1st story
Mar 24, 2012 · Apt 1
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in wasteline at wash basin in the bathroom located at apt 1, 1st story
Mar 24, 2012 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective inoperative oven at gas range stove in the kitchen located at apt 1, 1st story
Mar 24, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective inoperative electric outlets thru-out in the entire apartment located at apt 1, 1st story
Mar 24, 2012 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hot water at bathroom & kitchen fixtures, temperature-136f. located at apt 2fl, 2nd story
Apr 20, 2008 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair the broken or defective door bell at entrance to entire apartment located at apt 2fl, 2nd story
Apr 20, 2008 · Apt 2FL
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Plumbing
Water supply
Jul 27, 2026 · Apt PRIVAT
Close - General
Signage missing
Jul 27, 2026 · Apt PRIVAT
Close - Plumbing
Water supply
Dec 30, 2014 · Apt 2
Close - Plumbing
Water supply
Dec 30, 2014 · Apt 2
Close - Heat/hot water
Apartment only
Dec 14, 2014 · Apt 2
Close - Heat/hot water
Apartment only
Dec 13, 2014 · Apt 2
Close - Heat/hot water
Apartment only
Dec 13, 2014 · Apt 2
Close - Plumbing
Basin/sink
Dec 9, 2014 · Apt 2
Close - Plumbing
Basin/sink
Dec 9, 2014 · Apt 2
Close - Plumbing
Toilet
Dec 9, 2014 · Apt 2
Close
Show 40 more ↓
- Plumbing
Toilet
Dec 9, 2014 · Apt 2
Close - Plumbing
Water supply
Nov 29, 2014 · Apt 2
Close - Water leak
Slow leak
Nov 29, 2014 · Apt 2
Close - General
Bell/buzzer/intercom
Nov 29, 2014 · Apt 2
Close - General
Bell/buzzer/intercom
Nov 26, 2014 · Apt 2
Close - Plumbing
Water supply
Nov 26, 2014 · Apt 2
Close - Plumbing
Water supply
Nov 23, 2014 · Apt 2
Close - Plumbing
Water supply
Nov 23, 2014 · Apt 2
Close - Plumbing
Toilet
Nov 20, 2014 · Apt 2
Close - Plumbing
Water supply
Nov 20, 2014 · Apt 2
Close - Plumbing
Water supply
Nov 20, 2014 · Apt 2
Close - Plumbing
Water supply
Nov 19, 2014 · Apt 2
Close - Plumbing
Water supply
Nov 13, 2014 · Apt 2
Close - Plumbing
Water supply
Nov 12, 2014 · Apt 2
Close - Heat/hot water
Apartment only
Oct 20, 2014 · Apt 2
Close - Unsanitary condition
Mold
May 6, 2014 · Apt 2
Close - Heating
Heat related
Dec 1, 2013 · Apt 1
Close - Heating
Heat related
Jul 3, 2013 · Apt 2
Close - General
Ceramic-tile
Jul 3, 2013 · Apt 2
Close - Plumbing
Bathtub/shower
Jul 3, 2013 · Apt 2
Close - Nonconst
Vermin
Jul 3, 2013 · Apt 2
Close - Heating
Heat related
Jun 19, 2013 · Apt 2FLR
Close - Heating
Heat related
Jun 11, 2013 · Apt NA
Close - Nonconst
Vermin
Jun 11, 2013 · Apt 2
Close - Plumbing
Bathtub/shower
Jun 11, 2013 · Apt 2
Close - General
Ceramic-tile
Jun 11, 2013 · Apt 2
Close - General
Floor
Apr 26, 2013 · Apt 2
Close - Nonconst
Vermin
Apr 26, 2013 · Apt 2
Close - General
Floor
Apr 26, 2013 · Apt 2
Close - Plumbing
Toilet
Apr 26, 2013 · Apt 2
Close - Plumbing
Bathtub/shower
Apr 26, 2013 · Apt 2
Close - General
Floor
Apr 14, 2013 · Apt 2
Close - Nonconst
Vermin
Apr 14, 2013 · Apt 2
Close - General
Floor
Apr 14, 2013 · Apt 2
Close - Plumbing
Toilet
Apr 14, 2013 · Apt 2
Close - Plumbing
Bathtub/shower
Apr 14, 2013 · Apt 2
Close - Heating
Heat related
Mar 30, 2013 · Apt 2NDF
Close - Nonconst
Vermin
Aug 10, 2012 · Apt 1
Close - Nonconst
Vermin
Jul 27, 2012 · Apt 1
Close - Plumbing
Toilet
Mar 16, 2012 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1920
- Floors
- 2
- Residential units
- 2
- Building area
- 1,760 ft²
- Lot area
- 3,136 ft²
- Zoning
- R3A
- Community board
- 412
- Council district
- 28
- Block / lot
- 12587 / 57
- Assessed value
- $54,420
- Landmark / historic district
- No
Questions about 140-11 169 Street
Who owns 140-11 169 Street?
The owner of record in NYC Department of City Planning PLUTO data is Baptiste, Federline.
Does 140-11 169 Street have violations?
Yes. NYC HPD has recorded 19 housing violations at this property.
Is 140-11 169 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 140-11 169 Street built?
City records list 1920 as the year it was built.
How many apartments are in 140-11 169 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.