153-75 Rockaway Boulevard
Queens, NY 11434BBL 4-12292-0037Map
Owner of record: Risingsam Rockaway LLC
153-75 Rockaway Boulevard is a hotel built in 2008 in Queens, 11434. The owner of record is Risingsam Rockaway LLC. HPD has recorded 5 housing violations here, most recently on March 31, 2023.
- HPD violations
- 5
- DOB violations
- 4
- ECB violations
- 14
- HPD complaints
- 7
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 5
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 26, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 11, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 30, 2016
Closed — Violation dismissed
DOB building violations · 4
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2013
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed
ECB violations · 14
- Class - 2
Observed on the first floor under the kitchen sinks using pvc piping on waste lines. on the third floor in the hot water heater room exhausted vent to hot water heater is not sealed properly and sprinkler head
Oct 1, 2025
Resolve - Class - 1
Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. observed hole penetrations throughout building. unpermitted plastic access panels
Oct 1, 2025 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code-compliant manner. observed obstructed passageway. located at ground floor. metal detector obstructing stairway. potential fire hazard, repair and/or replace
Oct 1, 2025 · Penalty $625
Resolve - Class - 2
Failure to maintain blg code compliant. noted: spalling,loose and missing bricks throughout exteiror facade.numerous brick face have separated and exterior bulkhead bricks completely eroded.rmdy:comply w/nov
Feb 18, 2016 · Penalty $500
Resolve - Class - 2
Failure to maintain bldg code compliant:lack of emergency lighting perbc1006.1. noted: at stair a 2nd flr and cellar,stair b 3rd flr, inoperative emergency lighting with batter back up. rmdy:comply w/notice of
Feb 18, 2016 · Penalty $250
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. noted:at front and rear exterior perimeter of job site has construction debris scattered throughout. rem:maintain adequate housekeeping.
Dec 20, 2011
Resolve - Class - 2
Jobsite fence not constructed pursuant to subsection. noted: warping, pulling away,defective sections of site fence on perimeter of site,w/stickin out nails,at various locations of site fence. remedy: immeditel
Mar 23, 2011
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. noted: at time of inspection at stalled/unactive jobsite observed accumulations of loose wood,construction debris at front/rear yards of site
Mar 23, 2011
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments 14 installed steel i beams evident in each fl from 1st l to roof plan indicates 16steel & i beams in each fl contrary to nb#41
Feb 18, 2010
Resolve - Class - 2
Misc viol failure to comply w/ safety requirements during constructionoperations as pers 27-203 missing handrail at stair southside exp4 from cellar to 2nd fl elevator shaft opening at cellar is open no guardra
Feb 18, 2010
Resolve
Show 4 more ↓
- Class - 2
Failure to provide signs @ job site pursuant of subsection. noted: contractor sign missing on rockaway blvd side; contractor sign on 137 avesign is incorrect; contractor sign missing on 154 side. no contractor
Feb 3, 2010
Resolve - Class - 2
Job site fences not constructed pursuant to subsection. noted: on adjacent property 153-63 approx 16' of construction fence missing. construction fences has nails, staples, etc. sticking out on to public sidewa
Feb 3, 2010
Resolve - Class - 2
Jobsite fence not const pursuant to subsection. defects noted: at timeof inspection the job site fence erected at site under job 410063229 has approx 50 linear ft of fence collapsed onto sidewalk at exp 4 137 a
Jan 27, 2010 · Penalty $800
Resolve - Class - 2
Job site fence not constructed pursuant to subsection. noted: erected job site fence under job #410063229 with gates that have hinges allowing 2-4'x8' sections of gates to open onto public sidewalk. at time of
Jan 26, 2009
Resolve
Complaints
- Heat/hot water
Entire building
Oct 19, 2020 · Apt 301
Close - Heat/hot water
Entire building
Jan 10, 2020 · Apt 107
Close - Heat/hot water
Entire building
Jan 24, 2019 · Apt 313
Close - Heat/hot water
Entire building
Dec 10, 2018 · Apt 211
Close - Heat/hot water
Entire building
Dec 16, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2014 · Apt B10
Close - Heating
Heat related
Oct 22, 2013 · Apt NA
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H4)
- Year built
- 2008
- Floors
- 4
- Residential units
- —
- Building area
- 18,780 ft²
- Lot area
- 14,626 ft²
- Zoning
- R3-1
- Community board
- 412
- Council district
- 28
- Block / lot
- 12292 / 37
- Assessed value
- $3,323,250
- Landmark / historic district
- No
HPD registration #431751, last renewed Jun 5, 2025.
Questions about 153-75 Rockaway Boulevard
Who owns 153-75 Rockaway Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Risingsam Rockaway LLC.
Does 153-75 Rockaway Boulevard have violations?
Yes. NYC HPD has recorded 5 housing violations at this property.
Is 153-75 Rockaway Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 153-75 Rockaway Boulevard built?
City records list 2008 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.