150-26 115 Drive
Queens, NY 11434BBL 4-12192-0020Map
Owner of record: Zaman, Arm Shiam
150-26 115 Drive is a two-family home built in 1930 in Queens, 11434. It has 2 residential units across 2.5 floors. The owner of record is Zaman, Arm Shiam. HPD has recorded 79 housing violations here, most recently on December 5, 2024.
- HPD violations
- 79
- DOB violations
- 1
- ECB violations
- 7
- HPD complaints
- 137
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 79
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 5, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 2nd room from north located at apt 1floor, 1st story, 1st apartment from east at south
Sep 19, 2023 · Apt 1FLOOR
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 1floor, 1st story, 1st apartment from east at south
Sep 19, 2023 · Apt 1FLOOR
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective base shelve inside base cabinet at kitchen sink in the kitchen located at apt 1floor, 1st story, 1st apartment from east at south
Sep 19, 2023 · Apt 1FLOOR
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 1floor, 1st story, 1st apartment from east at south
Sep 19, 2023 · Apt 1FLOOR
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1floor, 1st story, 1st apartment from east at south
Sep 19, 2023 · Apt 1FLOOR
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures .. in the entire apartment located at apt 1floor, 1st story, 1st apartment from east at south
Sep 19, 2023 · Apt 1FLOOR
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Jan 11, 2018
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter balance at lower sash at north 2 window in the 1st room from north located at apt 2, 2nd story
Dec 28, 2013 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell-buzzer/intercom system located at apt 2, 2nd story
Dec 28, 2013 · Apt 2
Closed — Violation closed
Show 40 more ↓
- BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2, 2nd story
Dec 28, 2013 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story
Dec 28, 2013 · Apt 2
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at east and south walls at cellar
Oct 5, 2013
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective connection waste pipe at ceiling at rear at cellar
Oct 5, 2013
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires at junction box at front at cellar
Oct 5, 2013
Closed — Violation closed - BHazardous
Replace with new the broken or defective wash basin cabinet in the bathroom located at apt 1, 1st story
Aug 28, 2013 · Apt 1
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 3rd room from north at east located at apt 1, 1st story
Aug 28, 2013 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly secure the loose entrance door to bldg. , 1st story
Aug 28, 2013
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective connection waste pipe at ceiling at cellar
Aug 28, 2013
Closed — Violation closed - CImmediately hazardous
Cleanse and disinfect to the satisfaction of this department after removing the raw sewage at cellar
Aug 28, 2013
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood door frame at public hall, 1st story
Aug 11, 2013
Closed — Violation closed - CImmediately hazardous
Replace with new the missing entrance door at public hall, 1st story
Aug 11, 2013
Closed — Violation closed - ANon-hazardous
Refit entrance door at public hall, 1st story
May 3, 2013
Closed — Violation closed - BHazardous
Properly secure the loose water closet in the bathroom located at apt 2, 2nd story
May 3, 2013 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2flr, 2nd story
Mar 7, 2013 · Apt 2FLR
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story
Nov 29, 2012 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the bathroom located at apt 2, 2nd story
Nov 29, 2012 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective cold water shut-off valve under washbasin in the bathroom located at apt 2, 2nd story
Nov 29, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly secure the loose hand rail 1sty to 2sty. at public hall, 1st story
Nov 29, 2012
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2, 2nd story
Nov 29, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective wall cabinets door in the kitchen located at apt 2, 2nd story
Nov 29, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective top and bottom window sash in the 1st living room from north located at apt 2, 2nd story
Nov 29, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective sagging floor at radiator in the 1st living room from north located at apt 2, 2nd story
Nov 29, 2012 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the missing radiator shut-off valve handle in the bedroom located at apt 2, 2nd story
Nov 29, 2012 · Apt 2
Closed — Violation closed - CImmediately hazardous
Section 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2, 2nd story
Nov 29, 2012 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective unhinge entrance door to building at public hall, 1st story
Nov 29, 2012
Closed — Violation closed - BHazardous
Properly secure the loose lower sash window in the 1st room from north located at apt 2, 2nd story
Oct 3, 2012 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of uncapped radiator connection in the kitchen located at apt 2, 2nd story
Oct 3, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor under radiator in the 1st room from north located at apt 2, 2nd story
Oct 3, 2012 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at apt 2, 2nd story
Oct 3, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood door to north wall cabinet in the kitchen located at apt 2, 2nd story
Oct 3, 2012 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of low cold water pressure to fixture at washbasin in the bathroom located at apt 2, 2nd story
Oct 3, 2012 · Apt 2
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 2, 2nd story
Oct 3, 2012 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south wall in the bathroom located at apt 2, 2nd story
Oct 3, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell system from front entrance to in the entire apartment located at apt 2, 2nd story
Oct 3, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly secure the loose light fixture at ceiling in the kitchen located at apt 2, 2nd story
Oct 3, 2012 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective air valve to radiator in the 4th room from north located at apt 2, 2nd story
Oct 3, 2012 · Apt 2
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... north and west walls approx 10 sq. ft. in the bathroom located at apt 2, 2nd story
Oct 3, 2012 · Apt 2
Closed — Violation closed - BHazardous
Properly secure the loose off hinges door to entrance front at public hall, 1st story
Oct 3, 2012
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling all stories at public hall
Oct 3, 2012
Closed — Violation closed
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 3, 2012
Dob violation - dismissed
ECB violations · 7
- Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34987612k issued on 7/3/12 pursuant to 28-204.4 & 1rcny 102-01. work w/o a work permit.
Mar 7, 2013
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34987612k issued on 7.3.12. (work w/o permit). remedy: comply w/the commissioner's order.
Jan 17, 2013
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #34987612k issued on 7.3.12 for construction work etc done w/o a permit. remedy: comply w/the commissioner's order.
Nov 27, 2012
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34987612k issued on 7/3/12. at cellar partitions w/water & waste lines & gas line. remedy: comply w/the comm's order.
Sep 19, 2012
Resolve - Class - 2
Occupancy contrary to that allowed by cofo or bldg dept records.cellaruse changed from storage & ordinary use to an apartment.partitions erected with bathroom facilities installed.
Jul 11, 2012
Resolve - Class - 1
Illegal work w/o permit illegal work noted at cellar lvl full height partitions installed w/ water waste gas line for residential 3pc rem: restore to prior legal condition obtain permit
Jul 3, 2012 · Penalty $4,000
Resolve - Class - 2
Residence altered for occupancy for more than the family approved number from a 2 family to a 3 familly cofo #59145 indicate cellar to be occupied as boiler room/storage now converted to class "a" apt 3 pc bath
Jul 3, 2012 · Penalty $3,000
Resolve
Complaints
- Plumbing
Water supply
Sep 18, 2023 · Apt 1FLOOR
Close - Electric
Power outage
Apr 22, 2014 · Apt 2FL
Close - Appliance
Refrigerator
Nov 24, 2013 · Apt 2
Close - General
Windows
Oct 25, 2013 · Apt 2
Close - Electric
Bell-buzzer/intercom
Oct 25, 2013 · Apt 2
Close - Nonconst
Vermin
Oct 25, 2013 · Apt 2
Close - Nonconst
Vermin
Oct 25, 2013 · Apt 2
Close - Heating
Heat related
Oct 25, 2013 · Apt 1
Close - Plumbing
Sewer
Oct 17, 2013 · Apt 1STFL
Close - Plumbing
Sewer
Oct 17, 2013 · Apt 1STFL
Close
Show 40 more ↓
- Plumbing
Toilet
Oct 17, 2013 · Apt 1STFL
Close - Plumbing
Basin/sink
Oct 17, 2013 · Apt 1STFL
Close - Plumbing
Toilet
Oct 17, 2013 · Apt 1STFL
Close - Plumbing
Sewer
Oct 2, 2013 · Apt 2
Close - General
Mold
Oct 2, 2013 · Apt 2
Close - Plumbing
Water-leaks
Oct 2, 2013 · Apt 2
Close - Electric
Wiring
Oct 2, 2013 · Apt 2
Close - Electric
Wiring
Sep 29, 2013 · Apt 2
Close - Electric
Wiring
Sep 29, 2013 · Apt 2
Close - Plumbing
Sewer
Aug 26, 2013 · Apt 2
Close - Plumbing
Sewer
Aug 26, 2013 · Apt 2
Close - General
Doors
Aug 26, 2013 · Apt 2
Close - Plumbing
Bathtub/shower
Aug 5, 2013 · Apt 2FL
Close - General
Doors
Aug 5, 2013 · Apt 2FL
Close - General
Doors
Aug 1, 2013 · Apt 2
Close - General
Doors
May 31, 2013 · Apt 2
Close - Plumbing
Toilet
Apr 30, 2013 · Apt 2
Close - Heating
Heat related
Apr 5, 2013 · Apt 1FL
Close - Heating
Heat related
Mar 12, 2013 · Apt 2
Close - Heating
Heat related
Mar 6, 2013 · Apt 2FLR
Close - General
Windows
Nov 26, 2012 · Apt 2
Close - Plumbing
Basin/sink
Nov 26, 2012 · Apt 2
Close - General
Mold
Nov 26, 2012 · Apt 2
Close - Nonconst
Vermin
Nov 26, 2012 · Apt 2
Close - Appliance
Refrigerator
Nov 26, 2012 · Apt 2
Close - General
Cabinet
Nov 26, 2012 · Apt 2
Close - General
Floor
Nov 26, 2012 · Apt 2
Close - Plumbing
Radiator
Nov 26, 2012 · Apt 2
Close - Heating
Heat related
Nov 26, 2012 · Apt 2
Close - Heating
Heat related
Nov 8, 2012 · Apt NA
Close - General
Doors
Oct 11, 2012 · Apt 2
Close - Heating
Heat related
Oct 10, 2012 · Apt 2
Close - General
Cabinet
Sep 18, 2012 · Apt 2
Close - General
Windows
Sep 18, 2012 · Apt 2
Close - General
Floor
Sep 18, 2012 · Apt 2
Close - Plumbing
Bathtub/shower
Sep 4, 2012 · Apt 2
Close - Plumbing
Shower-stall
Sep 4, 2012 · Apt 2
Close - Plumbing
Basin/sink
Sep 4, 2012 · Apt 2
Close - Plumbing
Radiator
Sep 4, 2012 · Apt 2
Close - Electric
Lighting
Sep 4, 2012 · Apt 2
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Dec 24, 2025 | $884,000 | Two family dwellings | 2 |
Building details
- Building type
- Two-family home (B3)
- Year built
- 1930
- Floors
- 2.5
- Residential units
- 2
- Building area
- 1,592 ft²
- Lot area
- 2,417 ft²
- Zoning
- R3A
- Community board
- 412
- Council district
- 28
- Block / lot
- 12192 / 20
- Assessed value
- $46,920
- Landmark / historic district
- No
HPD registration #915669, last renewed Nov 24, 2025.
Questions about 150-26 115 Drive
Who owns 150-26 115 Drive?
The owner of record in NYC Department of City Planning PLUTO data is Zaman, Arm Shiam.
Does 150-26 115 Drive have violations?
Yes. NYC HPD has recorded 79 housing violations at this property.
Is 150-26 115 Drive rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 150-26 115 Drive built?
City records list 1930 as the year it was built.
How many apartments are in 150-26 115 Drive?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.