115-47 Sutphin Boulevard
Queens, NY 11434BBL 4-12189-0001Map
Owner of record: Mazura International, INC
115-47 Sutphin Boulevard is a mixed residential and retail building built in 1901 in Queens, 11434. It has 2 residential units across 2 floors. The owner of record is Mazura International, INC. HPD has recorded 81 housing violations here, most recently on May 7, 2026. 31 of the 50 most recent violations are still open.
- HPD violations
- 81
- DOB violations
- 15
- ECB violations
- 1
- HPD complaints
- 64
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 81
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2025
Open — Info nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the kitchen located at apt 2f, 2nd story, 1st apartment from west at north
Nov 17, 2024 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room, 1st story
May 16, 2024
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 2f, 2nd story, 1st apartment from west at north
May 16, 2024 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 11, 2024
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at light fixture at ceiling in the 1st room from east at north located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at light fixture at ceiling in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective light fixture at east wall in the private hallway located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at light fixture at north wall in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of plastic covers encasing electrical wires instead of bx cables in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch at apartment entrance door in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
May 11, 2024
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of uncapped steam riser pipe in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
May 11, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
May 8, 2024 · Apt 2F
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
May 8, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west
May 8, 2024 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
May 8, 2024 · Apt 2F
Open — Notice of issuance sent to tenant - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story
May 8, 2024
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures gasrange in the kitchen located at apt 2f, 2nd story, 1st apartment from south at west
May 8, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2f, 2nd story, 1st apartment from south at west
May 8, 2024 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
May 8, 2024
Open — Nov sent out - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof . at public hall, 2nd story
May 6, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at secondary exit door to public hall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
May 6, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 6, 2024
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of uncapped steam riser in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
May 6, 2024 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the missing door knob latch at door in the entrance located at apt 2, 2nd story, 1st apartment from north at east
May 6, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 2, 2nd story, 1st apartment from north at east
May 6, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures all walls and ceiling in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
May 6, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum allowable temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
May 6, 2024 · Apt 2
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 8, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 16, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 1, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Mar 9, 2018
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ,
Mar 9, 2018
Closed — Violation closed
DOB building violations · 15
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active
Show 5 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
ECB violations · 1
- Class - 2
As per class 2(b265) 28-303-7 failure to file a complete boiler inspection report as per dob records last inspection 12-21-2015 submit a current bo-9 report
Jun 3, 2024 · Penalty $3,125
Active
Complaints
- Heat/hot water
Entire building
Nov 29, 2024 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Nov 25, 2024 · Apt 2F
Close - Plumbing
Basin/sink
Nov 19, 2024 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 14, 2024 · Apt 2F
Close - Plumbing
Basin/sink
Nov 14, 2024 · Apt 2F
Close - Heat/hot water
Entire building
May 15, 2024 · Apt 2F
Close - Electric
Wiring
May 11, 2024 · Apt 2
Close - Heat/hot water
Entire building
May 10, 2024 · Apt 2F
Close - General
Cooking gas
May 10, 2024 · Apt 2F
Close - General
Cooking gas
May 9, 2024 · Apt 2
Close
Show 40 more ↓
- Heat/hot water
Apartment only
May 9, 2024 · Apt 2
Close - General
Cooking gas
May 8, 2024 · Apt 2F
Close - Heat/hot water
Entire building
May 8, 2024 · Apt 2F
Close - Electric
No lighting
May 7, 2024 · Apt 2
Close - Heat/hot water
Entire building
May 6, 2024 · Apt BLDG
Close - Electric
Power outage
May 6, 2024 · Apt 2FL
Close - Heat/hot water
Entire building
Nov 27, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 10, 2022 · Apt 1
Close - Door/window
Door
Jan 10, 2022 · Apt 1
Close - Electric
Outlet/switch
Jan 10, 2022 · Apt 1
Close - Unsanitary condition
Mold
Jan 10, 2022 · Apt 1
Close - Electric
No lighting
Jan 24, 2019 · Apt 3
Close - Heat/hot water
Entire building
Dec 7, 2018 · Apt BLDG
Close - Appliance
Electric/gas range
Sep 9, 2018 · Apt 2FLR
Close - Unsanitary condition
Pests
Mar 5, 2018 · Apt RM1
Close - Water leak
Heavy flow
Jan 16, 2018 · Apt 2
Close - Paint/plaster
Ceiling
Jan 16, 2018 · Apt 1
Close - Water leak
Slow leak
Jan 16, 2018 · Apt 1
Close - Unsanitary condition
Pests
Jan 16, 2018 · Apt 1
Close - Plumbing
Toilet
Jan 16, 2018 · Apt 1
Close - Unsanitary condition
Pests
Jan 16, 2018 · Apt 1
Close - Plumbing
Basin/sink
Jan 16, 2018 · Apt 1
Close - Plumbing
Basin/sink
Oct 25, 2017 · Apt RM1
Close - Electric
No lighting
Oct 25, 2017 · Apt RM1
Close - Unsanitary condition
Pests
Oct 25, 2017 · Apt RM1
Close - Plumbing
Toilet
Oct 25, 2017 · Apt RM1
Close - Door/window
Door
Oct 25, 2017 · Apt RM1
Close - Appliance
Electric/gas range
Oct 25, 2017 · Apt RM1
Close - Electric
Outlet/switch
Oct 25, 2017 · Apt RM1
Close - Unsanitary condition
Pests
Oct 25, 2017 · Apt RM1
Close - General
Cabinet
Oct 25, 2017 · Apt RM1
Close - Plumbing
Basin/sink
Oct 2, 2017 · Apt 1
Close - Electric
Outlet/switch
Oct 2, 2017 · Apt 1
Close - Flooring/stairs
Floor
Oct 2, 2017 · Apt 1
Close - Door/window
Door
Oct 2, 2017 · Apt 1
Close - Flooring/stairs
Floor
Oct 2, 2017 · Apt 1
Close - Plumbing
Toilet
Oct 2, 2017 · Apt 1
Close - Safety
Smoke detector
Oct 2, 2017 · Apt 1
Close - Safety
Carbon monoxide detector
Oct 2, 2017 · Apt 1
Close - Electric
Outlet/switch
Oct 2, 2017 · Apt 1
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Feb 6, 2026 | $900,000 | Rentals - 4-10 unit | 4 |
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1901
- Floors
- 2
- Residential units
- 2
- Building area
- 2,812 ft²
- Lot area
- 2,435 ft²
- Zoning
- R5D
- Community board
- 412
- Council district
- 28
- Block / lot
- 12189 / 1
- Assessed value
- $280,350
- Landmark / historic district
- No
HPD registration #417791, last renewed —.
Questions about 115-47 Sutphin Boulevard
Who owns 115-47 Sutphin Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Mazura International, INC.
Does 115-47 Sutphin Boulevard have violations?
Yes. NYC HPD has recorded 81 housing violations at this property.
Is 115-47 Sutphin Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 115-47 Sutphin Boulevard built?
City records list 1901 as the year it was built.
How many apartments are in 115-47 Sutphin Boulevard?
It has 2 residential units and 4 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.