144-16 Rockaway Boulevard
Queens, NY 11436BBL 4-12062-0058Map
Owner of record: Triangle Real Estate Firm LLC
144-16 Rockaway Boulevard is a mixed residential and retail building built in 1930 in Queens, 11436. It has 2 residential units across 2 floors. The owner of record is Triangle Real Estate Firm LLC. HPD has recorded 13 housing violations here, most recently on October 22, 2025. 13 of the 13 most recent violations are still open.
- HPD violations
- 13
- DOB violations
- 0
- ECB violations
- 5
- HPD complaints
- 24
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 13
- BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Oct 22, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Oct 22, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Oct 22, 2025 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north at east located at apt front, 2nd story
Aug 10, 2010 · Apt FRONT
Open — Nov sent out - BHazardous
Properly secure the loose electric light switch north wall in the bathroom located at apt front, 2nd story, 1st apartment from west at north
Aug 10, 2010 · Apt FRONT
Open — Nov sent out - BHazardous
Properly secure the loose electric outlet west wall in the bathroom located at apt front, 2nd story, 1st apartment from west at north
Aug 10, 2010 · Apt FRONT
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles south wall in the bathroom located at apt front, 2nd story, 1st apartment from west at north
Aug 10, 2010 · Apt FRONT
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color south wall in the bathroom located at apt front, 2nd story, 1st apartment from west at north
Aug 10, 2010 · Apt FRONT
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt front, 2nd story, 1st apartment from west at north
Aug 10, 2010 · Apt FRONT
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of excessive storage of bicycles 1 to 2 story at public hall
Mar 20, 2004
Open — Nov sent out
Show 3 more ↓
- BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas stove located at cellar .
Mar 20, 2004 · Apt .
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections water closet wash basin shower stall and sink located at cellar .
Mar 20, 2004 · Apt .
Open — Nov sent out - BHazardous
Replace with new the broken or defective window glass, transom over front entrance door to bldg.
Nov 16, 2001
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 5
- Class - 3
Failure to maintain building in a code-compliant manner. at the time of inspection, i observed improper drainage of the leader located at rear of the building not connected to storm drain and is allowing excess
May 31, 2022
Resolve - Class - 3
Work without a permit. at the time of inspection, i observed newly installed elevated concrete surface at rear yard. size is approx. 40'x 20 = 800sf 16" high. work is completed, no filings in dob records for wo
May 31, 2022
Resolve - Class - 2
Failure to maintain building in a code-compliant manner. at the time of inspection, at front of the building below the first-floor window i observed masonry brick facade in disrepair. missing mortar on brick jo
Sep 1, 2021 · Penalty $625
Resolve - Class - 3
Failure to maintain building in a code-compliant manner. at rear of the building, i observed improper drainage for leader that is detached and not connected to storm drain. condition will allow excess water to
Sep 1, 2021 · Penalty $500
Resolve - Class - 3
Entire rear yard is concreted approx. 750 sft without proper drainage allowing rainwater to flow to neighbor's property. no permits on file., obtain permit or restore premises to prior legal condition
Dec 31, 2020
Resolve
Complaints
- Heat/hot water
Apartment only
Nov 11, 2025 · Apt 2R
Close - Heat/hot water
Apartment only
Oct 25, 2025 · Apt 2R
Close - Electric
Outlet/switch
Oct 25, 2025 · Apt 2R
Close - Heat/hot water
Apartment only
Oct 21, 2025 · Apt 2R
Close - Electric
Wiring
Oct 21, 2025 · Apt 2R
Close - Heat/hot water
Apartment only
Oct 17, 2025 · Apt 2R
Close - Electric
Power outage
Oct 17, 2025 · Apt 2R
Close - Heat/hot water
Apartment only
Oct 16, 2025 · Apt 2R
Close - Electric
Outlet/switch
Oct 16, 2025 · Apt 2R
Close - Electric
Wiring
Oct 11, 2025 · Apt 2R
Close
Show 14 more ↓
- Heat/hot water
Apartment only
Oct 11, 2025 · Apt 2R
Close - General
Cabinet
Mar 22, 2017 · Apt APT1
Close - Paint/plaster
Wall
Mar 22, 2017 · Apt APT1
Close - Unsanitary condition
Pests
Mar 22, 2017 · Apt APT1
Close - Water leak
Slow leak
Mar 22, 2017 · Apt APT1
Close - Flooring/stairs
Floor
Mar 22, 2017 · Apt APT1
Close - Door/window
Window frame
Mar 22, 2017 · Apt APT1
Close - Heating
Heat related
Jul 21, 2010 · Apt FRONT
Close - Appliance
Electric/gas range
Jul 21, 2010 · Apt FRONT
Close - Electric
Wiring
Jul 21, 2010 · Apt FRONT
Close - General
Cooking gas
Jul 15, 2010 · Apt FRONT
Close - Heating
Heat related
Jul 15, 2010 · Apt FRONT
Close - Plumbing
Water-leaks
Apr 23, 2006 · Apt 2FL
Close - Heating
Heat related
Mar 19, 2004 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1930
- Floors
- 2
- Residential units
- 2
- Building area
- 2,000 ft²
- Lot area
- 1,962 ft²
- Zoning
- R5D
- Community board
- 412
- Council district
- 28
- Block / lot
- 12062 / 58
- Assessed value
- $51,720
- Landmark / historic district
- No
Questions about 144-16 Rockaway Boulevard
Who owns 144-16 Rockaway Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Triangle Real Estate Firm LLC.
Does 144-16 Rockaway Boulevard have violations?
Yes. NYC HPD has recorded 13 housing violations at this property.
Is 144-16 Rockaway Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 144-16 Rockaway Boulevard built?
City records list 1930 as the year it was built.
How many apartments are in 144-16 Rockaway Boulevard?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.