roofy

117-30 146 Street

Queens, NY 11436BBL 4-12020-0021Map

Owner of record: Ramdass, Adesh

117-30 146 Street is a two-family home built in 1930 in Queens, 11436. It has 2 residential units across 2.5 floors. The owner of record is Ramdass, Adesh. HPD has recorded 15 housing violations here, most recently on April 11, 2025. 12 of the 15 most recent violations are still open.

HPD violations
15
DOB violations
2
ECB violations
2
HPD complaints
34

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 11, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 15

  • B

    Replace with new the missing door knob at door in the entrance located at apt 2, 2nd story, 1st apartment from south at west

    Apr 11, 2025 · Apt 2

    Open — Nov sent out
  • C

    Repair the broken or defective connection waste line at wash basin in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Apr 11, 2025 · Apt 2

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Apr 11, 2025 · Apt 2

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Apr 2, 2025 · Apt 2

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west

    Apr 2, 2025 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west

    Apr 2, 2025 · Apt 2

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Apr 2, 2025 · Apt 2

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Apr 2, 2025 · Apt 2

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Mar 26, 2025

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Mar 25, 2025 · Apt 2

    Open — Nov sent out
Show 5 more ↓
  • C

    Properly repair or replace the broken or defective lock and handle assembly at door in the entrance located at apt 2, 2nd story, 1st apartment from south at west

    Mar 25, 2025 · Apt 2

    Open — Nov sent out
  • C

    Abate the nuisance consisting of hot water exceeding maximum temperature of 130 degrees in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Mar 25, 2025 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the broken or defective connection waste pipe at wash basin in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Mar 25, 2025 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west

    Mar 25, 2025 · Apt 2

    Open — Nov sent out
  • C

    Abate the nuisance consisting of free standing radiator at public hall, 1st story

    Mar 25, 2025

    Closed — Violation dismissed

DOB building violations · 2

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 25, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 25, 2017

    Dob violation - dismissed

ECB violations · 2

  • Class - 1

    Work w/o permit. time of inspection 12:30pm. at time of inspection in basement boiler room, i observed new gas valve for hot water heater, gas piping was repiping.observed new 3pc bathroom in basement/cellar

    Oct 24, 2016

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner. time of inspec tion 12:30pm. at time of inspection in boiler room i observed two unions prohibited material on gas line.*photos taken.rmdy: repair and/or r

    Oct 24, 2016

    Resolve

Complaints

  • Door/window

    Window pane

    Jun 26, 2025 · Apt 2

    Close
  • Plumbing

    Toilet

    Jun 26, 2025 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Jun 26, 2025 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Jun 26, 2025 · Apt 2

    Close
  • Door/window

    Door

    Jun 26, 2025 · Apt 2

    Close
  • Plumbing

    Water supply

    Jun 26, 2025 · Apt 2

    Close
  • Plumbing

    Water supply

    Jun 26, 2025 · Apt 2

    Close
  • Door/window

    Window frame

    Jun 16, 2025 · Apt 2

    Close
  • Door/window

    Door

    Jun 16, 2025 · Apt 2

    Close
  • Plumbing

    Toilet

    Jun 16, 2025 · Apt 2

    Close
Show 24 more ↓
  • Heat/hot water

    Apartment only

    Apr 17, 2025 · Apt 2NDFLO

    Close
  • Door/window

    Door

    Apr 17, 2025 · Apt 2NDFLO

    Close
  • Plumbing

    Toilet

    Apr 17, 2025 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Apr 10, 2025 · Apt 2FL

    Close
  • Door/window

    Door

    Apr 10, 2025 · Apt 2FL

    Close
  • Plumbing

    Toilet

    Apr 10, 2025 · Apt 2FL

    Close
  • Heat/hot water

    Apartment only

    Apr 8, 2025 · Apt 2NDFLO

    Close
  • Plumbing

    Toilet

    Apr 8, 2025 · Apt 2NDFLO

    Close
  • Door/window

    Door

    Apr 8, 2025 · Apt 2NDFLO

    Close
  • Door/window

    Door

    Apr 1, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Apr 1, 2025 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Apr 1, 2025 · Apt 2

    Close
  • Door/window

    Door

    Mar 30, 2025 · Apt 2NDPIS

    Close
  • Plumbing

    Toilet

    Mar 30, 2025 · Apt 2NDPIS

    Close
  • Heat/hot water

    Apartment only

    Mar 30, 2025 · Apt 2NDPIS

    Close
  • Door/window

    Door

    Mar 28, 2025 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Mar 28, 2025 · Apt 2

    Close
  • Plumbing

    Toilet

    Mar 28, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Mar 28, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Mar 24, 2025 · Apt 2

    Close
  • Door/window

    Door

    Mar 24, 2025 · Apt 2

    Close
  • Door/window

    Door

    Mar 24, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Mar 20, 2025 · Apt 2FL

    Close
  • Heat/hot water

    Entire building

    Jan 13, 2015 · Apt 1STFL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B3)
Year built
1930
Floors
2.5
Residential units
2
Building area
1,600 ft²
Lot area
2,400 ft²
Zoning
R3A
Community board
412
Council district
28
Block / lot
12020 / 21
Assessed value
$51,660
Landmark / historic district
No

HPD registration #928754, last renewed Apr 28, 2025.

Questions about 117-30 146 Street

Who owns 117-30 146 Street?

The owner of record in NYC Department of City Planning PLUTO data is Ramdass, Adesh.

Does 117-30 146 Street have violations?

Yes. NYC HPD has recorded 15 housing violations at this property.

Is 117-30 146 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 117-30 146 Street built?

City records list 1930 as the year it was built.

How many apartments are in 117-30 146 Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.