113-02 Sutphin Boulevard
Queens, NY 11435BBL 4-11966-0008Map
Owner of record: 191 Jamaica INC
113-02 Sutphin Boulevard is a mixed residential and retail building built in 1910 in Queens, 11435. It has 2 residential units across 2 floors. The owner of record is 191 Jamaica INC. HPD has recorded 41 housing violations here, most recently on March 25, 2019. 31 of the 41 most recent violations are still open.
- HPD violations
- 41
- DOB violations
- 18
- ECB violations
- 5
- HPD complaints
- 70
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 41
- BHazardous
Abate the infestation consisting of roaches located at apt 2, 2nd story, apartment at south
Mar 25, 2019 · Apt 2
Open — Violation will be reinspected - BHazardous
Abate the infestation consisting of mice located at apt 2, 2nd story, apartment at south
Mar 25, 2019 · Apt 2
Open — Violation will be reinspected - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2, 2nd story, apartment at south
Mar 25, 2019 · Apt 2
Open — Violation will be reinspected - CImmediately hazardous
Remove the illegal fastening a double cylinder key operated lock installed at the metal security door of building entrance.
Mar 25, 2019
Closed — Violation closed - CImmediately hazardous
Section 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1f, 2nd story
Mar 8, 2015 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1f, 2nd story
Mar 8, 2015 · Apt 1F
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story
Jan 26, 2015 · Apt 2FL
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 2fl, 2nd story
Jan 26, 2015 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2fl, 2nd story
Jan 26, 2015 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2fl, 2nd story
Jan 26, 2015 · Apt 2FL
Closed — Violation closed
Show 31 more ↓
- CImmediately hazardous
Remove the illegal fastening consisting of double cylinder lock at front entrance door to building at public hall, 1st story
Jan 17, 2015
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1f, 1st story
Jan 17, 2015 · Apt 1F
Open — Nov sent out - BHazardous
Abate the nuisance consisting of uncaped radiator shut-off valve in the bathroom located at apt 1f, 1st story
Jan 17, 2015 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1f, 1st story
Jan 17, 2015 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1f, 2nd story
Jan 17, 2015 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Section 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1f, 2nd story
Jan 17, 2015 · Apt 1F
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at lower window sash in the entire apartment located at apt 2r, 2nd story
Dec 18, 2014 · Apt 2R
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures .. in the entire apartment located at apt 2r, 2nd story
Dec 18, 2014 · Apt 2R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the entire apartment located at apt 2r, 2nd story
Dec 18, 2014 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the broken or defective light fixture at south wall at public hall, 2nd story
Dec 18, 2014
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2r, 2nd story
Dec 18, 2014 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2r, 2nd story
Dec 18, 2014 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair the broken or defective electric outlets at walls in the entire apartment located at apt 2r, 2nd story
Dec 18, 2014 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated building and vestibule door lock
Dec 18, 2014
Open — Nov sent out - BHazardous
Abate the nuisance consisting of uncapped radiator line in the bathroom located at apt 1f, 2nd story
Aug 19, 2014 · Apt 1F
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1f, 2nd story
Aug 19, 2014 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1f, 2nd story
Aug 19, 2014 · Apt 1F
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at vestibule door 1st story public hall.
Nov 8, 2013
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at metal security door front entrance to building
Nov 8, 2013
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilings in the entire apartment located at apt 2r, 2nd story
Feb 17, 2012 · Apt 2R
Open — Nov sent out - BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations .. in the entire apartment located at apt 2r, 2nd story
Feb 17, 2012 · Apt 2R
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2r, 2nd story
Feb 17, 2012 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the broken or defective electric out-let walls in the 1st bedroom from east at south located at apt 2r, 2nd story
Feb 17, 2012 · Apt 2R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over. in the entire apartment located at apt 2r, 2nd story
Feb 17, 2012 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the broken or defective windows sash upper and lower in the bathroom located at apt 2r, 2nd story
Feb 17, 2012 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story
Feb 1, 2003 · Apt 2F
Open — Nov sent out - BHazardous
Abate the nuisance consisting of no electric service provided to light fixture at public hall
Feb 1, 2003
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story
Nov 1, 2002 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story
Jul 26, 2002 · Apt 2F
Open — Nov sent out - BHazardous
Provide adequate lighting for ..... at public hall, 2nd story
Jul 26, 2002
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures -- in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
Dec 6, 2000 · Apt 2F
Open — Nov sent out
DOB building violations · 18
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active
Show 8 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2013
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active
ECB violations · 5
- Class - 2
36,15,16,24b,32a,38,50a,34b,50b,50c,50d,50e. b254-36 found dunkirk gas fired boiler not registered; 50a-boiler room door not fire proof; b-signage missing form fire door c-discharge pipe missing from relief va
Jul 11, 2018 · Penalty $3,125
Active - Class - 2
B265-as per class 2(b265)28-303.7 failure to file a complete boiler i nspection report as per dob records 50a storage around boiler b)manualcow water cutoff wrong position c)no clean out on chimney base.submit
Jul 13, 2016 · Penalty $2,500
Active - Class - 2
Use or installation of plumbing materials which do not comply with rs-16. at time of inspection i observed p.v.c. waste and vent piping installed in the cellar.pv.c. piping are not allowed in mix use or commer-
Jul 24, 2013 · Penalty $2,500
Active - Class - 1
Work w/o a permit. at time of inspection i observed new 3/4 gas pipinginsalled from the second flr tenants meter in the cellar to one boilerin the cellar w/o a permit also noted one a.o.smith non-gas hotwater
Jul 24, 2013 · Penalty $8,000
Active - Class - 1
Failure to have new or altered plumbing system tested. at time of inspection i observed new gas piping servicing boiler in the cellar w/o gas test performed. rmdy:perform test.
Jul 24, 2013 · Penalty $7,500
Resolve
Complaints
- Heat/hot water
Entire building
Mar 22, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 22, 2019 · Apt 2
Close - Unsanitary condition
Pests
Dec 26, 2018 · Apt 2
Close - Door/window
Window pane
Dec 26, 2018 · Apt 2
Close - Plumbing
Radiator
Dec 26, 2018 · Apt 2
Close - General
Cooking gas
Dec 26, 2018 · Apt 2
Close - Heat/hot water
Entire building
Jan 24, 2018 · Apt 2R
Close - General
Bell/buzzer/intercom
Dec 26, 2017 · Apt 2R
Close - Electric
Outlet/switch
Dec 26, 2017 · Apt 2R
Close - Heat/hot water
Entire building
Dec 26, 2017 · Apt 2R
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 26, 2017 · Apt 2R
Close - Heat/hot water
Apartment only
Dec 26, 2017 · Apt 2R
Close - Heat/hot water
Entire building
Dec 23, 2017 · Apt 2R
Close - Heat/hot water
Entire building
Dec 21, 2017 · Apt 2R
Close - Heat/hot water
Entire building
Dec 21, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2017 · Apt 2R
Close - Heat/hot water
Entire building
Dec 15, 2017 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 5, 2016 · Apt 1F
Close - Heat/hot water
Entire building
Mar 6, 2015 · Apt 2R
Close - Heat/hot water
Entire building
Mar 6, 2015 · Apt 1F
Close - Appliance
Electric/gas range
Jan 21, 2015 · Apt 2FL
Close - Heat/hot water
Apartment only
Jan 21, 2015 · Apt 2FL
Close - Heat/hot water
Entire building
Jan 14, 2015 · Apt 1F
Close - General
Cooking gas
Dec 15, 2014 · Apt 2R
Close - Door/window
Window frame
Dec 15, 2014 · Apt 2R
Close - Flooring/stairs
Floor
Dec 15, 2014 · Apt 2R
Close - Water leak
Heavy flow
Dec 15, 2014 · Apt 2R
Close - Electric
No lighting
Dec 15, 2014 · Apt 2R
Close - Flooring/stairs
Floor
Dec 15, 2014 · Apt 2R
Close - Heat/hot water
Entire building
Dec 11, 2014 · Apt 2R
Close - Flooring/stairs
Floor
Nov 22, 2014 · Apt 2R
Close - Outside building
Roofing
Nov 22, 2014 · Apt 2R
Close - General
Cabinet
Nov 22, 2014 · Apt 2R
Close - Flooring/stairs
Floor
Nov 22, 2014 · Apt 2R
Close - Door/window
Window frame
Nov 22, 2014 · Apt 2R
Close - General
Cooking gas
Nov 22, 2014 · Apt 2R
Close - Heat/hot water
Apartment only
Oct 23, 2014 · Apt 1F
Close - General
Cooking gas
Aug 13, 2014 · Apt 1F
Close - Heating
Heat related
Nov 4, 2013 · Apt 2F
Close - Heating
Heat related
Oct 30, 2013 · Apt 2R
Close - Heating
Heat related
Oct 7, 2013 · Apt 2R
Close - General
Cooking gas
Oct 7, 2013 · Apt 2R
Close - Heating
Heat related
Sep 27, 2013 · Apt 2R
Close - Heating
Heat related
Mar 12, 2012 · Apt 1F
Close - Heating
Heat related
Jan 31, 2012 · Apt 2R
Close - Plumbing
Water-leaks
Jan 31, 2012 · Apt 2R
Close - General
Windows
Jan 31, 2012 · Apt 2R
Close - Electric
Wiring
Jan 31, 2012 · Apt 2R
Close - Paint/plaster
Wall
Jan 31, 2012 · Apt 2R
Close - Nonconst
Carbon monoxide
Jan 31, 2012 · Apt 2R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1910
- Floors
- 2
- Residential units
- 2
- Building area
- 2,720 ft²
- Lot area
- 3,548 ft²
- Zoning
- R5D
- Community board
- 412
- Council district
- 28
- Block / lot
- 11966 / 8
- Assessed value
- $61,140
- Landmark / historic district
- No
HPD registration #915976, last renewed Sep 2, 2025.
Questions about 113-02 Sutphin Boulevard
Who owns 113-02 Sutphin Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 191 Jamaica INC.
Does 113-02 Sutphin Boulevard have violations?
Yes. NYC HPD has recorded 41 housing violations at this property.
Is 113-02 Sutphin Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 113-02 Sutphin Boulevard built?
City records list 1910 as the year it was built.
How many apartments are in 113-02 Sutphin Boulevard?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.