145-38 110 Avenue
Queens, NY 11435BBL 4-11943-0376Map
Owner of record: Basal, Farhad
145-38 110 Avenue is a two-family home built in 1925 in Queens, 11435. It has 2 residential units across 2.5 floors. The owner of record is Basal, Farhad. HPD has recorded 51 housing violations here, most recently on September 2, 2026. 40 of the 50 most recent violations are still open.
- HPD violations
- 51
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 51
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 51
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq feet west wall in the foyer located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 2, 2026 · Apt 2NDFLO
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair or replace the broken or defective interior glass pane at lower sash at 1st window from east at north wall in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 2, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vinyl floor tiles in the private hallway located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 2, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at shower stall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 2, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective gasket at upper and lower refrigerator doors in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 2, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 2, 2026 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective room entrance door at west wall in the 2nd room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 2, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Replace with new the missing shower head at shower stall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 2, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective rotted countertop at sink cabinet in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 2, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 2, 2026 · Apt 2NDFLO
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective window frame at east wall in the 2nd room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 2, 2026 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway , the 2nd room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 2, 2026 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east, the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Sep 2, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north
Aug 25, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north
Aug 25, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door at the west wall in the 3rd room from east located at apt 2ndflo, 2nd story, 1st apartment from west at north
Aug 25, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north
Aug 25, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective at wash basin in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from west at north
Aug 25, 2026 · Apt 2NDFLO
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lower window sash spring balance at the 2nd window from south at west in the 3rd room from east located at apt 2ndflo, 2nd story, 1st apartment from west at north
Aug 25, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north
Aug 25, 2026 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls, trims and ceiling in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north
Aug 25, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Open — Nov certified late - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 2nd room from north at east located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, north wall, west wall, 1st window frame from east at south wall, 1st door from south at west wall, 1st door frame from south at west wall in the 2nd room from north at east located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, 1st door from south at west wall, 1st door frame from south at west wall, 1st closet from north at east wall door, 1st closet from north at east wall door frame in the private hallway located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, 1st door from west at north wall in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, east wall in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from north at east located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the private hallway located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, east wall in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from north at east located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the private hallway located at apt 2ndfl, 2nd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2NDFL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south
Jan 7, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south
Jan 7, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south
Jan 7, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south
Jan 7, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north located at apt 1fl, 1st story, 1st apartment from east at south
Jan 7, 2024 · Apt 1FL
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 1fl, 1st story, 1st apartment from east at south
Jan 7, 2024 · Apt 1FL
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... at east closet walls in the 3rd room from north located at apt 1fl, 1st story, 1st apartment from east at south
Jan 7, 2024 · Apt 1FL
Open — Notice of issuance sent to tenant - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 22, 2021
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling from extension roof above in the 1st room from north located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 10, 2020 · Apt 1STFLO
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 10, 2020 · Apt 1STFLO
Open — Nov certified late - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1stflo, 1st story, 1st apartment from east at south
Jan 10, 2020 · Apt 1STFLO
Open — Invalid certification - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 1, 1st story, apartment at north
Jul 26, 2019 · Apt 1
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north located at apt 1, 1st story, apartment at north
Jul 26, 2019 · Apt 1
Open — Nov certified late - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 30, 2018
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Door/window
Window pane
Sep 1, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Mold
Sep 1, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Sep 1, 2026 · Apt 2NDFLO
Close - Plumbing
Bathtub/shower
Sep 1, 2026 · Apt 2NDFLO
Close - Door/window
Window frame
Sep 1, 2026 · Apt 2NDFLO
Close - Appliance
Refrigerator
Sep 1, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Sep 1, 2026 · Apt 2NDFLO
Close - Door/window
Door
Sep 1, 2026 · Apt 2NDFLO
Close - Plumbing
Bathtub/shower
Sep 1, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Sep 1, 2026 · Apt 2NDFLO
Close
Show 40 more ↓
- Paint/plaster
Wall
Sep 1, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Aug 12, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Aug 12, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Aug 12, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Mold
Aug 12, 2026 · Apt 2NDFLO
Close - Door/window
Door
Aug 12, 2026 · Apt 2NDFLO
Close - Door/window
Window frame
Aug 12, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Aug 12, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Aug 12, 2026 · Apt 2NDFLO
Close - Plumbing
Bathtub/shower
Aug 12, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Aug 12, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Aug 12, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Aug 12, 2026 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Jan 2, 2025 · Apt 2NDFL
Close - Door/window
Window frame
Jan 2, 2025 · Apt 2NDFL
Close - Paint/plaster
Cabinet
Jan 2, 2025 · Apt 2NDFL
Close - Plumbing
Bathtub/shower
Jan 2, 2025 · Apt 2NDFL
Close - Unsanitary condition
Pests
Jan 2, 2025 · Apt 2NDFL
Close - Paint/plaster
Wall
Jan 2, 2025 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Jan 2, 2025 · Apt 2NDFL
Close - Unsanitary condition
Mold
Jan 4, 2024 · Apt 1FL
Close - Water leak
Heavy flow
Jan 4, 2024 · Apt 1FL
Close - Door/window
Door
Jan 4, 2024 · Apt 1FL
Close - Flooring/stairs
Floor
Apr 26, 2023 · Apt 2NDFLO
Close - Door/window
Window pane
Apr 26, 2023 · Apt 2NDFLO
Close - Door/window
Door frame
Apr 26, 2023 · Apt 2NDFLO
Close - Plumbing
Bathtub/shower
Apr 26, 2023 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Apr 26, 2023 · Apt 2NDFLO
Close - Appliance
Electric/gas range
Apr 26, 2023 · Apt 2NDFLO
Close - Water leak
Heavy flow
Aug 22, 2019 · Apt 1STFLO
Close - Water leak
Slow leak
Jul 22, 2019 · Apt 1
Close - Water leak
Heavy flow
Dec 20, 2018 · Apt 2FL
Close - Heat/hot water
Entire building
Jan 9, 2015 · Apt 2
Close - Heating
Heat related
Jan 18, 2013 · Apt 1
Close - General
Mold
Jan 18, 2013 · Apt 1
Close - General
Mold
Jan 18, 2013 · Apt 1
Close - Plumbing
Shower-stall
Jan 18, 2013 · Apt 1
Close - Plumbing
Basin/sink
Jan 18, 2013 · Apt 1
Close - Paint/plaster
Wall
Jan 18, 2013 · Apt 1
Close - General
Mold
Jan 18, 2013 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1925
- Floors
- 2.5
- Residential units
- 2
- Building area
- 1,631 ft²
- Lot area
- 2,850 ft²
- Zoning
- R3A
- Community board
- 412
- Council district
- 28
- Block / lot
- 11943 / 376
- Assessed value
- $46,860
- Landmark / historic district
- No
HPD registration #912315, last renewed Jul 18, 2025.
Questions about 145-38 110 Avenue
Who owns 145-38 110 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Basal, Farhad.
Does 145-38 110 Avenue have violations?
Yes. NYC HPD has recorded 51 housing violations at this property.
Is 145-38 110 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 145-38 110 Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 145-38 110 Avenue?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.