roofy

145-38 110 Avenue

Queens, NY 11435BBL 4-11943-0376Map

Owner of record: Basal, Farhad

145-38 110 Avenue is a two-family home built in 1925 in Queens, 11435. It has 2 residential units across 2.5 floors. The owner of record is Basal, Farhad. HPD has recorded 51 housing violations here, most recently on September 2, 2026. 40 of the 50 most recent violations are still open.

HPD violations
51
DOB violations
0
ECB violations
0
HPD complaints
51

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 2, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 51

  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq feet west wall in the foyer located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 2, 2026 · Apt 2NDFLO

    Open — Notice of issuance sent to tenant
  • C

    Properly repair or replace the broken or defective interior glass pane at lower sash at 1st window from east at north wall in the 1st room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 2, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vinyl floor tiles in the private hallway located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 2, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at shower stall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 2, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective gasket at upper and lower refrigerator doors in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 2, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 2, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective room entrance door at west wall in the 2nd room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 2, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Replace with new the missing shower head at shower stall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 2, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective rotted countertop at sink cabinet in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 2, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 2, 2026 · Apt 2NDFLO

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair or replace the broken or defective window frame at east wall in the 2nd room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 2, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway , the 2nd room from north at east located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 2, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east, the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east

    Sep 2, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Aug 25, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Aug 25, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective door at the west wall in the 3rd room from east located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Aug 25, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Aug 25, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective at wash basin in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Aug 25, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective lower window sash spring balance at the 2nd window from south at west in the 3rd room from east located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Aug 25, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Aug 25, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls, trims and ceiling in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from west at north

    Aug 25, 2026 · Apt 2NDFLO

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Open — Nov certified late
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 2nd room from north at east located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, north wall, west wall, 1st window frame from east at south wall, 1st door from south at west wall, 1st door frame from south at west wall in the 2nd room from north at east located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, 1st door from south at west wall, 1st door frame from south at west wall, 1st closet from north at east wall door, 1st closet from north at east wall door frame in the private hallway located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, 1st door from west at north wall in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, east wall in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from north at east located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the private hallway located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, east wall in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the bathroom located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from north at east located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the private hallway located at apt 2ndfl, 2nd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2NDFL

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south

    Jan 7, 2024 · Apt 1FL

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1fl, 1st story, 1st apartment from east at south

    Jan 7, 2024 · Apt 1FL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south

    Jan 7, 2024 · Apt 1FL

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south

    Jan 7, 2024 · Apt 1FL

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north located at apt 1fl, 1st story, 1st apartment from east at south

    Jan 7, 2024 · Apt 1FL

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 1fl, 1st story, 1st apartment from east at south

    Jan 7, 2024 · Apt 1FL

    Open — Nov sent out
  • C

    Trace and repair the source and abate the visible mold condition... at east closet walls in the 3rd room from north located at apt 1fl, 1st story, 1st apartment from east at south

    Jan 7, 2024 · Apt 1FL

    Open — Notice of issuance sent to tenant
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 22, 2021

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over ceiling from extension roof above in the 1st room from north located at apt 1stflo, 1st story, 1st apartment from east at south

    Jan 10, 2020 · Apt 1STFLO

    Open — Nov certified late
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from north located at apt 1stflo, 1st story, 1st apartment from east at south

    Jan 10, 2020 · Apt 1STFLO

    Open — Nov certified late
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1stflo, 1st story, 1st apartment from east at south

    Jan 10, 2020 · Apt 1STFLO

    Open — Invalid certification
  • B

    Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 1, 1st story, apartment at north

    Jul 26, 2019 · Apt 1

    Open — Nov certified late
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the 1st room from north located at apt 1, 1st story, apartment at north

    Jul 26, 2019 · Apt 1

    Open — Nov certified late
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 30, 2018

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Door/window

    Window pane

    Sep 1, 2026 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Mold

    Sep 1, 2026 · Apt 2NDFLO

    Close
  • Flooring/stairs

    Floor

    Sep 1, 2026 · Apt 2NDFLO

    Close
  • Plumbing

    Bathtub/shower

    Sep 1, 2026 · Apt 2NDFLO

    Close
  • Door/window

    Window frame

    Sep 1, 2026 · Apt 2NDFLO

    Close
  • Appliance

    Refrigerator

    Sep 1, 2026 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Pests

    Sep 1, 2026 · Apt 2NDFLO

    Close
  • Door/window

    Door

    Sep 1, 2026 · Apt 2NDFLO

    Close
  • Plumbing

    Bathtub/shower

    Sep 1, 2026 · Apt 2NDFLO

    Close
  • Paint/plaster

    Wall

    Sep 1, 2026 · Apt 2NDFLO

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Sep 1, 2026 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2026 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2026 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2026 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Mold

    Aug 12, 2026 · Apt 2NDFLO

    Close
  • Door/window

    Door

    Aug 12, 2026 · Apt 2NDFLO

    Close
  • Door/window

    Window frame

    Aug 12, 2026 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2026 · Apt 2NDFLO

    Close
  • Paint/plaster

    Wall

    Aug 12, 2026 · Apt 2NDFLO

    Close
  • Plumbing

    Bathtub/shower

    Aug 12, 2026 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2026 · Apt 2NDFLO

    Close
  • Flooring/stairs

    Floor

    Aug 12, 2026 · Apt 2NDFLO

    Close
  • Flooring/stairs

    Floor

    Aug 12, 2026 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Jan 2, 2025 · Apt 2NDFL

    Close
  • Door/window

    Window frame

    Jan 2, 2025 · Apt 2NDFL

    Close
  • Paint/plaster

    Cabinet

    Jan 2, 2025 · Apt 2NDFL

    Close
  • Plumbing

    Bathtub/shower

    Jan 2, 2025 · Apt 2NDFL

    Close
  • Unsanitary condition

    Pests

    Jan 2, 2025 · Apt 2NDFL

    Close
  • Paint/plaster

    Wall

    Jan 2, 2025 · Apt 2NDFL

    Close
  • Heat/hot water

    Apartment only

    Jan 2, 2025 · Apt 2NDFL

    Close
  • Unsanitary condition

    Mold

    Jan 4, 2024 · Apt 1FL

    Close
  • Water leak

    Heavy flow

    Jan 4, 2024 · Apt 1FL

    Close
  • Door/window

    Door

    Jan 4, 2024 · Apt 1FL

    Close
  • Flooring/stairs

    Floor

    Apr 26, 2023 · Apt 2NDFLO

    Close
  • Door/window

    Window pane

    Apr 26, 2023 · Apt 2NDFLO

    Close
  • Door/window

    Door frame

    Apr 26, 2023 · Apt 2NDFLO

    Close
  • Plumbing

    Bathtub/shower

    Apr 26, 2023 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Pests

    Apr 26, 2023 · Apt 2NDFLO

    Close
  • Appliance

    Electric/gas range

    Apr 26, 2023 · Apt 2NDFLO

    Close
  • Water leak

    Heavy flow

    Aug 22, 2019 · Apt 1STFLO

    Close
  • Water leak

    Slow leak

    Jul 22, 2019 · Apt 1

    Close
  • Water leak

    Heavy flow

    Dec 20, 2018 · Apt 2FL

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2015 · Apt 2

    Close
  • Heating

    Heat related

    Jan 18, 2013 · Apt 1

    Close
  • General

    Mold

    Jan 18, 2013 · Apt 1

    Close
  • General

    Mold

    Jan 18, 2013 · Apt 1

    Close
  • Plumbing

    Shower-stall

    Jan 18, 2013 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Jan 18, 2013 · Apt 1

    Close
  • Paint/plaster

    Wall

    Jan 18, 2013 · Apt 1

    Close
  • General

    Mold

    Jan 18, 2013 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B3)
Year built
1925
Floors
2.5
Residential units
2
Building area
1,631 ft²
Lot area
2,850 ft²
Zoning
R3A
Community board
412
Council district
28
Block / lot
11943 / 376
Assessed value
$46,860
Landmark / historic district
No

HPD registration #912315, last renewed Jul 18, 2025.

Questions about 145-38 110 Avenue

Who owns 145-38 110 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Basal, Farhad.

Does 145-38 110 Avenue have violations?

Yes. NYC HPD has recorded 51 housing violations at this property.

Is 145-38 110 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 145-38 110 Avenue built?

City records list 1925 as the year it was built.

How many apartments are in 145-38 110 Avenue?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.