132-26 South Conduit Avenue
Queens, NY 11430BBL 4-11886-0010Map
Owner of record: Mlt Canyon LLC C/O J
132-26 South Conduit Avenue is a hotel built in 2005 in Queens, 11430. The owner of record is Mlt Canyon LLC C/O J. HPD has recorded 6 housing violations here, most recently on April 17, 2024.
- HPD violations
- 6
- DOB violations
- 41
- ECB violations
- 49
- HPD complaints
- 9
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 6
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 41
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 1, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 1, 2020
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 27, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 27, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 19, 2019
Dob violation - dismissed
Show 31 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Aug 19, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 19, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 19, 2019
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2017
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Construction other optional
Emerg work:at roof level on west facing exp, arch overhangs been part dislodged&instab of these overhangs poses a risk.bottom of the strl compromised overhangs is not prop secured.remedy:owner immed engage nys prof eng'r&cont'r install sidewalk shed, eval bldg&prep/submit report to qns boro off w/scope of repair.file sidewalk shed w/48hrs
May 1, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 9, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 9, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 23, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 23, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 23, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2010
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 21, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 21, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2008
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed
ECB violations · 49
- Class - 1
Atoi located in basement pvc used for drainage which is contrary to pc 1101.10 failure to maintain building in code-compliant manner., repair and/replace
Jul 21, 2026 · Penalty $2,500
Active - Class - 1
Electrical work without a permit. observed in the kitchen new electric oven 35 amp installed and in the kitchen new 30 amp line installed also in stairway a & b new emergency lights installed checked bis / dob
Jul 21, 2026 · Penalty $2,500
Active - Class - 1
Electrical closet not dedicated to electrical distribution equipment only. observed in the electrical closet thru out the installation of camera, wifi , telephone equipment is installed. all electrical closets
Jul 21, 2026 · Penalty $1,200
Active - Class - 2
Unapproved/unsafe/unsuitable electrical equipment. observed in the main electrical room the con edison ct cabinet is not locked this cabinet should be locked at all times after all work is complete. con edison
Jul 21, 2026
Resolve - Class - 1
Atoi observed obsrtucted sprinkler heads throughout the building also on 6th floor open drain line as per fgc 903.3.3 failure to maintain building in code-compliant manner, repair and/replace
Jul 21, 2026 · Penalty $2,500
Resolve - Class - 3
@7th fl hw room>#2+#3ao smith hwh's are not operable/@6th fl hw room>#1ao smith hwh is not operable+chimney termination is incorrect/@5th fl hw room>#1ao smith hwh has incorrect discharge pipe+#5ao smith hwh is
Jul 8, 2026 · Penalty $500
Active - Class - 1
Observed newly installed gas piping serving water heaters. an limited alteration application (laa) was signed off in may 2023 (job no. q08055575-l1-la); however, the observed work was performed outside the appr
Jul 8, 2026 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code-compliant manner. at the time of inspection observed gas odor coming from gas meter room. gas leak was found following shut off by national grid., repair and/replace
Jul 8, 2026 · Penalty $2,500
Active - Class - 2
Pedestrian protection does not meet code specifications.note:at time of inspection at a 7 story building with a sidewalk shed erected at exp#1,2,3 and 4,i observed there was no parapet information panel at any
Mar 9, 2023 · Penalty $2,400
Resolve - Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control916476.submit acceptable required technical report
Dec 9, 2022 · Penalty $1,250
Resolve
Show 39 more ↓
- Class - 2
Pedestrian protection does not meet code specifications.at the time ofinspection i observed,there was a gap between sidewalk shed and building facade at exposure#1,2& 3.the gap/spacing was more than 3 feet/more
Apr 30, 2022
Resolve - Class - 2
Project information panel was not provided at the time of inspection iobserved,there was no project information panel on sidewalk shed parapet panels.which requires as per code.additionally there was no locatio
Apr 30, 2022 · Penalty $625
Resolve - Class - 2
Housekeeping.note:at the time of my inspection observed 6 story occupied building roof and parapet repairing working in progress.i observed construction materials,debris through on roof and storage on sidewalk
Dec 20, 2021 · Penalty $625
Resolve - Class - 1
Failure to provide maintain/display on site approved drawing.note:at the time of my inspection observed active job site.upon request for approved drawing unable to provide as required create an unsafe condition
Dec 20, 2021 · Penalty $1,250
Resolve - Class - 1
Unsafe storage of combustible material & equipment. noted: 2 5 pound propanne cylinders left on roof after jobsite was closed. no workers present on site at time of inspection. as per nyc fire code section 2703
May 25, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain adequate housekeeping per section bc 3303.4 for construction jobs. at the time of inspection i observe a dumpster being used for construction debris & left uncovered at the end of the work
May 25, 2021
Resolve - Class - 2
Pedestrians protection does not meet standards-sidewalk shed illuminating lights are off in multiple locations,creating a hazardous & unsafeconditions for pedestrians. remedy: replace bulbs. maintain illuminati
May 25, 2021
Resolve - Class - 1
Failure to provide safety zone for demolition operation at the time fo my inspection contractor was off site building mgmt excerted me in response to safety complaint observed wall full length of exposure #3
Dec 29, 2020
Resolve - Class - 2
27-2009.2-failure to distribute or post notice of tenant protection plan at the time of inspection i walked teh building with mr a holley asst chief for the premises i di dnot observed a tenant protetction prem
Dec 29, 2020 · Penalty $620
Resolve - Class - 2
Failure to distribute or post safe construction bill of rights at the time of inspection i walked the building with mr a hollay asst chief for the building i did not observe a safe construction bill of rights
Dec 29, 2020
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirments at the time of my inspection observed 12 a 12 masonry material stored safety at emergency exit at roof seven bags of demolsihed masonry were sto
Dec 29, 2020
Resolve - Class - 2
Noted: observed vertical and horizontal cracks throughout all elevations of concrete masonry unit wall parapet., maintain exterior building wall
Feb 5, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35452347y issued on 10/12/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Dec 12, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/comm's order contained in summons/violation #35381123j issued on 2/6/19,& to file a certificate of correction pursuant to 28.201.1&1rcny 102-01(d)(2).an acceptable certificate has not yet be
Dec 9, 2019 · Penalty $1,250
Resolve - Class - 1
Reissue ecb#35452163j issued 9/7/19.failure to maintain bldg walls or appurtenances,noted:a time of inspection observed roof level parapet wall with having cracks throughout various location.photo taken.remedy:
Oct 12, 2019 · Penalty $6,250
Resolve - Class - 1
Unlawful acts unable to comply with an order of the commissioner.records indicate no application was made to correct and certify violation#35383993k.remedy:comply with commissioners order.
Oct 7, 2019
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances noted: @roof lvl parapet wall with having cracks throughout in various locations. previous ecb #35423234p.rem: maintain exterior building walls.
Sep 7, 2019 · Penalty $6,250
Resolve - Class - 2
Cease use 42g11-improper fusing on the controller jumped
Aug 28, 2019 · Penalty $625
Resolve - Class - 1
An unlawful act failure to comply with an order of the commissioner failure ro correct and certify summons #35383933k issued on 2-6-2019 for having the hot water emergency shut off switch inside of the mechanic
Aug 15, 2019
Resolve - Class - 2
Failure to maintain bldg walls or appurtenances. noted: at roof level at various locations at parapet(the are cracks). remey: maintain exterior bldg wall.
Jun 22, 2019 · Penalty $3,125
Resolve - Class - 1
Unlawful acts failure to comply with an order of the commissioner. records indicate no application was made to correct and certify removal of violation contained in summons #35383933k. rmdy: comply with comm
Jun 21, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to comply, comply with commissioner's order; comply with code
May 7, 2019
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. noted: at roof,at various locations throughout all parapet walls,there are cracks,horizontal & verticle. i appears cracks may have been caused by the installatio
Apr 9, 2019 · Penalty $6,250
Resolve - Class - 1
Unlawful acts failure to comply w/ an order of the commissioner. records indicate no application was made to correct and certify removal of violation contained in summons#35383933k. remedy:comply w/ commissione
Mar 21, 2019 · Penalty $2,500
Resolve - Class - 2
Electrical closet not dedicated to electrical distribution equipment only. observed on all floors a room marked "associates only" the storage of metal shelving w/ towels and linens. there is no storage or other
Feb 6, 2019 · Penalty $600
Resolve - Class - 1
Sec. 408.2 misc violation: fixture connections exist on gas piping. observed in the mechanical room on the 5th fl where hot water heaters are installed a future connection exist on the gas supply piping to one
Feb 6, 2019
Resolve - Class - 1
Unapproved/unsafe/unsuitable electrical equipment,apparatus,materials,devices appliances or wiring in use. observed in mechanical rooms on various floors the shut off switch for the gas burner hot water heaters
Feb 6, 2019 · Penalty $1,600
Resolve - Class - 1
Sec. 411.1 misc violation: residential gas flex used on commercial equipment. observed in the kitchen area in the cellar residential gas flex hoses being used to supply gas to 2pc of cooking equipment. photos
Feb 6, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. observed at the top floor no inspectors test station installed & on floor 1 to 6 no pressure gauges installed at the floor control valves. remedy: repair &/or
Feb 6, 2019 · Penalty $625
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. noted: at roof at parapet walls throughout entire roof there are cracks on parapet wall in several locations throughout roof. appears cracks area caused by cell
Feb 6, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to maintain bldg in a code compliant manner: no fire stopping as per bc 712.3;27-345. noted: in all electrical panel rooms in bldg there are holes in ceiling & walls eliminating fire stopping. holes ran
Feb 6, 2019 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. observed on 7-12-18 at above address sprinkler head on the 5th fl to deep in the ceiling. also no pressure gauge on the inspectors test station. remedy: repair
Jul 12, 2018 · Penalty $310
Resolve - Class - 1
Failure to maintain exterior bldg walls & appurtenances. @ time of insp observed on exp#3, east elevation: loose & cracking stucco on parapet cornice/coping- on the north east end of (elevation east) east eleva
May 22, 2018
Resolve - Class - 2
Failure to sumbit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control # 816476. remedy:submit required technical report
May 18, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to maintain appurtenances. noted: @ exp#4 the 2 architectural overhangs are defective partially dislodged & remaining fiber board is a potential collapse hazard @ the roof level. make safe immediately,
Apr 29, 2017
Resolve - Non-hazardous
No permit as noted new bldg foundation already in placed in drilling caisons is in progress at the time of inspection however as rear per dob records no permit been issued for the above address for the record
Jan 15, 2004 · Penalty $800
Resolve - Non-hazardous
Openating a restarant no contificate or occupancy remedy obain certificate of occupancy.
Aug 21, 1996
Resolve - Hazardous
Operation of pa without a current permit remedy obtain permit failure to have approved pa plans available for inspection remedy have plans on premises framed or posted. usw of prohibited hardwar at kitchen exit
Nov 14, 1989 · Penalty $200
Resolve - Non-hazardous
Exit signs not illuminaged remedy repair or replace defective exit signs at rear dining area / kitchen emergency lighting is inoperative or defective in five locations in area of pool table 2 in rear dining rm
Nov 14, 1989 · Penalty $125
Resolve
Complaints
- Electric
Power outage
Jul 7, 2026 · Apt BLDG
Close - Electric
Power outage
Jul 3, 2026 · Apt BLDG
Close - Electric
Power outage
Jul 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 20, 2025 · Apt 417
Close - Unsanitary condition
Pests
Jul 6, 2024 · Apt 714
Close - Unsanitary condition
Pests
Jul 6, 2024 · Apt 714
Close - Heat/hot water
Entire building
Feb 20, 2020 · Apt 621
Close - Heat/hot water
Entire building
Feb 18, 2020 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H2)
- Year built
- 2005
- Floors
- 6
- Residential units
- —
- Building area
- 69,700 ft²
- Lot area
- 27,012 ft²
- Zoning
- M1-2
- Community board
- 410
- Council district
- 28
- Block / lot
- 11886 / 10
- Assessed value
- $12,024,000
- Landmark / historic district
- No
HPD registration #433447, last renewed Sep 24, 2025.
Questions about 132-26 South Conduit Avenue
Who owns 132-26 South Conduit Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Mlt Canyon LLC C/O J.
Does 132-26 South Conduit Avenue have violations?
Yes. NYC HPD has recorded 6 housing violations at this property.
Is 132-26 South Conduit Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 132-26 South Conduit Avenue built?
City records list 2005 as the year it was built.