114-04 Rockaway Boulevard
Queens, NY 11420BBL 4-11706-0032Map
Owner of record: Zou, Zong Yong
114-04 Rockaway Boulevard is a mixed residential and retail building built in 1925 in Queens, 11420. It has 2 residential units across 2 floors. The owner of record is Zou, Zong Yong. HPD has recorded 14 housing violations here, most recently on March 4, 2026. 6 of the 14 most recent violations are still open.
- HPD violations
- 14
- DOB violations
- 19
- ECB violations
- 4
- HPD complaints
- 16
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- CImmediately hazardous
Abate the nuisance consisting of hot water temperature exceeds the allowable maximum of 130 degrees in the entire apartment located at apt 2floor, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2FLOOR
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the at caulking along bathtub in the bathroom located at apt 2floor, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2floor, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2floor, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the 1st room from north located at apt 2floor, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Properly secure the loose metal baseboard radiator cover at north wall in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from north at east
May 7, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the visible evidence of mold along the caulking at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
May 7, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
May 7, 2025 · Apt 2
Closed — Violation dismissed
Show 4 more ↓
- CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes conducive to pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls,ceilings, floors, fixing leaks and manage garbage in public areas. evidence found at , in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
May 7, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling, north and east walls in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from north at east
May 7, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from north at east
May 7, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
May 7, 2025 · Apt 2
Closed — Violation dismissed
DOB building violations · 19
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
Show 9 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed - Construction other optional
Do
Apr 30, 1992
Vpw*-violation unserved ecb-work without permit-dismissed - Construction other optional
Rd
Feb 21, 1992
Vpw-violation unserved ecb-work without permit-active - Boiler boiler optional
18b/36
May 7, 1990
Vp*-violation unserved ecb- dismissed
ECB violations · 4
- Non-hazardous
Work without a permit- work noted bathroom walls removed at 2nd story,center real, bedroom wall at rear removed (plus plumbing fixtures) remedy: obtain permits
Feb 21, 1992 · Penalty $285
Resolve - Non-hazardous
Work without a permit, work noted did erect extension in rear of bldg approx 20'lx 20'w x12'high installed 2 walk in boxes. remedy: obtain permits and approvals from this dept or remove all illegal work.
May 15, 1990 · Penalty $285
Resolve - Non-hazardous
Occupancy contrary to bldg dept records no c of o for bakery. remedy:provide a valid c of o.
May 15, 1990 · Penalty $285
Resolve - Non-hazardous
Boilers
May 12, 1988 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Pests
Oct 20, 2025 · Apt 2FLOOR
Close - Water leak
Heavy flow
Oct 20, 2025 · Apt 2FLOOR
Close - Electric
Lighting
Oct 20, 2025 · Apt 2FLOOR
Close - Plumbing
Radiator
Oct 20, 2025 · Apt 2FLOOR
Close - Paint/plaster
Wall
Oct 20, 2025 · Apt 2FLOOR
Close - Plumbing
Toilet
Oct 20, 2025 · Apt 2FLOOR
Close - Unsanitary condition
Pests
Oct 20, 2025 · Apt 2FLOOR
Close - Electric
Lighting
Oct 20, 2025 · Apt 2FLOOR
Close - Plumbing
Toilet
Jul 22, 2025 · Apt 2
Close - Paint/plaster
Cabinet
Jul 22, 2025 · Apt 2
Close
Show 6 more ↓
- Paint/plaster
Radiator
Jul 22, 2025 · Apt 2
Close - Door/window
Window frame
Jul 22, 2025 · Apt 2
Close - Unsanitary condition
Pests
Jul 22, 2025 · Apt 2
Close - Unsanitary condition
Mold
Jul 22, 2025 · Apt 2
Close - Unsanitary condition
Pests
Apr 30, 2025 · Apt 2
Close - Unsanitary condition
Pests
Apr 30, 2025 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1925
- Floors
- 2
- Residential units
- 2
- Building area
- 2,640 ft²
- Lot area
- 2,130 ft²
- Zoning
- R3-2
- Community board
- 410
- Council district
- 28
- Block / lot
- 11706 / 32
- Assessed value
- $69,600
- Landmark / historic district
- No
HPD registration #927562, last renewed Sep 8, 2025.
Questions about 114-04 Rockaway Boulevard
Who owns 114-04 Rockaway Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Zou, Zong Yong.
Does 114-04 Rockaway Boulevard have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 114-04 Rockaway Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 114-04 Rockaway Boulevard built?
City records list 1925 as the year it was built.
How many apartments are in 114-04 Rockaway Boulevard?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.