85-06 Pitkin Avenue
Queens, NY 11417BBL 4-11348-0044Map
Owner of record: Nardozi, Peter
85-06 Pitkin Avenue is a mixed residential and retail building built in 1925 in Queens, 11417. It has 1 residential unit across 1 floor. The owner of record is Nardozi, Peter. HPD has recorded 8 housing violations here, most recently on October 15, 2021. 8 of the 8 most recent violations are still open.
- HPD violations
- 8
- DOB violations
- 4
- ECB violations
- 2
- HPD complaints
- 60
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 8
- BHazardous
Properly repair the broken or defective paving south yard
Oct 15, 2021
Open — Nov sent out - ANon-hazardous
Provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Oct 15, 2021
Open — Nov sent out - ANon-hazardous
Discontinue use of interior room for living or provide an alcove opening of at least 32 1/2 sq.ft. to room having a window opening directly to street or yard in the 1st room from north at west located at apt 1, 1st story, 1st apartment from east at south
Oct 15, 2021 · Apt 1
Open — Nov sent out - BHazardous
§ 27-2005,2007 admon. code: fire egress defective. remove obstructing bars or gates from at least 1 window. in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Oct 15, 2021 · Apt 1
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Oct 15, 2021 · Apt 1
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 1rear, 1st story
Apr 16, 2014 · Apt 1REAR
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceiling in the entire apartment located at apt 1rear, 1st story
Apr 16, 2014 · Apt 1REAR
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective grouting at ceramic tile at walls in the bathroom located at apt 1rear, 1st story
Apr 16, 2014 · Apt 1REAR
Open — Nov sent out
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 18, 1993
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Jun 18, 1993
Vw*-violation - work w/o permit dismissed
ECB violations · 2
- Non-hazardous
Occupancy contrary to that allowed by the cofo cofo#186279. states from: cellar for storage to:bedroom with 3 beds. remedy:discontinue illegal use.
Jun 18, 1993 · Penalty $175
Resolve - Non-hazardous
Work wwithout a permit. work noted. construction of partitions walls in cellar forming a bedroom in cellar with stairwell constructed and stair access form 1st fl. rear apt. remedy:obtain a permit if feasible
Jun 18, 1993 · Penalty $350
Resolve
Complaints
- Safety
Window guard broken/missing
Oct 14, 2021 · Apt GROUND
Close - Outside building
Pavement
Oct 14, 2021 · Apt GROUND
Close - Unsanitary condition
Garbage/recycling storage
Oct 14, 2021 · Apt GROUND
Close - Unsanitary condition
Pests
Sep 12, 2021 · Apt BACKYA
Close - Safety
Window guard broken/missing
Sep 10, 2021 · Apt 1
Close - Heat/hot water
Apartment only
Oct 29, 2016 · Apt 1REAR
Close - Heat/hot water
Entire building
Oct 27, 2016 · Apt BLDG
Close - Plumbing
Toilet
Mar 28, 2014 · Apt 1REAR
Close - Electric
Outlet/switch
Mar 27, 2014 · Apt 1REAR
Close - Plumbing
Toilet
Mar 27, 2014 · Apt 1REAR
Close
Show 40 more ↓
- Water leak
Slow leak
Mar 27, 2014 · Apt 1REAR
Close - Water leak
Slow leak
Mar 26, 2014 · Apt 1R
Close - Plumbing
Toilet
Mar 26, 2014 · Apt 1R
Close - Electric
Outlet/switch
Mar 26, 2014 · Apt 1R
Close - Electric
Outlet/switch
Mar 20, 2014 · Apt 1R
Close - Electric
Outlet/switch
Mar 20, 2014 · Apt 1R
Close - Plumbing
Toilet
Mar 20, 2014 · Apt 1R
Close - Water leak
Slow leak
Mar 20, 2014 · Apt 1R
Close - General
Mold
Feb 22, 2014 · Apt 1REAR
Close - Plumbing
Bathtub/shower
Feb 22, 2014 · Apt 1REAR
Close - Electric
Wiring
Feb 22, 2014 · Apt 1REAR
Close - Electric
Wiring
Feb 22, 2014 · Apt 1REAR
Close - Plumbing
Water-leaks
Feb 22, 2014 · Apt 1REAR
Close - Paint/plaster
Ceiling
Feb 22, 2014 · Apt 1REAR
Close - General
Mold
Feb 22, 2014 · Apt 1REAR
Close - Plumbing
Water-leaks
Feb 5, 2014 · Apt 1R
Close - Heating
Heat related
Dec 24, 2009 · Apt 1R
Close - Heating
Heat related
Sep 13, 2008 · Apt 1R
Close - Heating
Heat related
Sep 12, 2008 · Apt 1R
Close - Paint/plaster
Wall
Aug 28, 2008 · Apt 1R
Close - Plumbing
Basin/sink
Aug 28, 2008 · Apt 1R
Close - Nonconst
Vermin
Aug 28, 2008 · Apt 1R
Close - Nonconst
Vermin
Aug 28, 2008 · Apt 1R
Close - Plumbing
Water supply
Feb 27, 2008 · Apt 1R
Close - Heating
Heat related
Feb 27, 2008 · Apt 1R
Close - Plumbing
Water supply
Feb 27, 2008 · Apt 1R
Close - Plumbing
Water supply
Nov 16, 2007 · Apt 1R
Close - Plumbing
Water supply
Nov 16, 2007 · Apt 1R
Close - Plumbing
Water supply
Nov 16, 2007 · Apt 1
Close - Heating
Heat related
Oct 28, 2005 · Apt BLDG
Close - Plumbing
Toilet
Nov 15, 2004 · Apt 2
Close - General
Doors
Nov 15, 2004 · Apt 2
Close - Plumbing
Toilet
Nov 15, 2004 · Apt 2
Close - Paint/plaster
Ceiling
Nov 15, 2004 · Apt 2
Close - General
Doors
Nov 15, 2004 · Apt 2
Close - Plumbing
Water-leaks
Nov 15, 2004 · Apt 2
Close - General
Floor
Nov 15, 2004 · Apt 2
Close - General
Floor
Nov 15, 2004 · Apt 2
Close - Plumbing
Water-leaks
Nov 15, 2004 · Apt 2
Close - Paint/plaster
Ceiling
Nov 3, 2004 · Apt 1FL
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Apr 23, 2026 | Non-market transfer | One family dwellings | 2 |
Building details
- Building type
- Mixed residential and retail building (S1)
- Year built
- 1925
- Floors
- 1
- Residential units
- 1
- Building area
- 1,580 ft²
- Lot area
- 1,728 ft²
- Zoning
- R4-1
- Community board
- 410
- Council district
- 32
- Block / lot
- 11348 / 44
- Assessed value
- $49,920
- Landmark / historic district
- No
Questions about 85-06 Pitkin Avenue
Who owns 85-06 Pitkin Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Nardozi, Peter.
Does 85-06 Pitkin Avenue have violations?
Yes. NYC HPD has recorded 8 housing violations at this property.
Is 85-06 Pitkin Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 85-06 Pitkin Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 85-06 Pitkin Avenue?
It has 1 residential units and 2 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.