199-23 Linden Boulevard
Queens, NY 11412BBL 4-11071-0005Map
Owner of record: 19923 Silver Property LLC
199-23 Linden Boulevard is a mixed residential and retail building built in 1931 in Queens, 11412. It has 2 residential units across 2 floors. The owner of record is 19923 Silver Property LLC. HPD has recorded 81 housing violations here, most recently on September 2, 2010. 50 of the 50 most recent violations are still open.
- HPD violations
- 81
- DOB violations
- 11
- ECB violations
- 1
- HPD complaints
- 35
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 81
- BHazardous
Repair the broken or defective connection sink wasteline in the kitchen located at apt 2fl, 2nd story
Sep 2, 2010 · Apt 2FL
Open — Nov sent out - BHazardous
Replace with new the broken or defective window pane apt 2f in the 4th room from north at west located at apt 2fl, 2nd story
Sep 2, 2010 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets bath-tub apt 2f in the bathroom located at apt 2fl, 2nd story
Sep 2, 2010 · Apt 2FL
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of concealed water leak ceiling at public hall, 1st story
Sep 2, 2010
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling & walls at public hall, 1st story
Sep 2, 2010
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture at public hall, 1st story
Sep 2, 2010
Open — Nov sent out - ANon-hazardous
Refit window apt 2f in the 4th room from north at east located at apt 2fl, 2nd story
Sep 2, 2010 · Apt 2FL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2fl, 2nd story
Sep 2, 2010 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over in the 1st room from north at west located at apt 2, 2nd story
Sep 2, 2010 · Apt 2
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items etc. from stair bulkhead to roof at public hall, 2nd story
Mar 10, 2006
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair the broken or defective frame at entrance door located at apt 2r, 2nd story
Mar 10, 2006 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlet north wall in the first room from north at east located at apt 2r, 2nd story
Mar 10, 2006 · Apt 2R
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2r, 2nd story
Mar 10, 2006 · Apt 2R
Open — Nov sent out - BHazardous
Replace with new the broken or defective leaky radiator valve in the 1st room from north at west located at apt 2r, 2nd story
Mar 10, 2006 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the broken or defective upper window sash north wall in the 1st room from north at west located at apt 2r, 2nd story
Mar 10, 2006 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retarding material at ceiling at public hall, 1st story
Oct 11, 2005
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2r, 2nd story
Oct 11, 2005 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from north located at apt 2r, 2nd story
Oct 11, 2005 · Apt 2R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from north located at apt 2r, 2nd story
Oct 11, 2005 · Apt 2R
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2r, 2nd story
Oct 11, 2005 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair the broken or defective radiator shut-off valve in the 2nd room from north located at apt 1f, 2nd story
Jun 11, 2004 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair the broken or defective radiator shut-off valve in the room from north located at apt 1f, 2nd story
Jun 11, 2004 · Apt 1F
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak north wall by the windows in the 1st room from north at east located at apt 2r, 2nd story
Oct 1, 2002 · Apt 2R
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass lower sash east window in the 1st room from north at east located at apt 2r, 2nd story
Oct 1, 2002 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall in the 1st room from north at east located at apt 2r, 2nd story
Oct 1, 2002 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceilings throughout in the entire apartment located at apt 2r, 2nd story
Oct 1, 2002 · Apt 2R
Open — Nov sent out - BHazardous
Properly secure the loose electric outlet west wall in the 1st room from north at west located at apt 2r, 2nd story
Oct 1, 2002 · Apt 2R
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mildew on the walls in the 1st room from north at west located at apt 2r, 2nd story
Oct 1, 2002 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color north wall in the 1st room from north at west located at apt 2r, 2nd story
Oct 1, 2002 · Apt 2R
Open — Nov sent out - BHazardous
Abate the nuisance consisting of concealed water leak north wall by the windows in the 1st room from north at west located at apt 2r, 2nd story
Oct 1, 2002 · Apt 2R
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures shower in the bathroom located at apt 2r, 2nd story
Oct 1, 2002 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 2r, 2nd story
Oct 1, 2002 · Apt 2R
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak from the ceiling by the skylight in the bathroom located at apt 2r, 2nd story
Oct 1, 2002 · Apt 2R
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures shower in the bathroom located at apt 2r, 2nd story
Oct 1, 2002 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of no electric service provided at light fixtures all stories public hall. er.
Mar 6, 2002
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective -wood floor of 1st story public hall affecting egress. er-1 1583127 6-7-1993
Mar 6, 2002
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of concealed ceiling water leak 1st story public hall. er1
Mar 6, 2002
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures -2nd story apartment 2r. er
Mar 6, 2002
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall and floor tiles 2nd sty. front apt. bathroom.
Mar 6, 2002
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak - over 2nd sty. front apt. throughout.
Mar 6, 2002
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color - walls and ceiling 2nd sty. front apt. throughout.
Mar 6, 2002
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures 2nd sty. front apt. 448285.
Mar 6, 2002
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures -2nd story front apartment #2f at kitchen and bathroom fixtures.
Mar 6, 2002
Open — Nov sent out - BHazardous
Replace with new the missing -kitchen sink at 2nd sty. rear apt. 2r kitchen.
Mar 6, 2002
Open — Nov sent out - BHazardous
Replace with new the broken or defective celotex ceiling tiles kitchen and east room - 2nd sty. apt. 2 - front.
Mar 6, 2002
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color -ceiling private hall 2nd sty. apt. 2- front.
Mar 6, 2002
Open — Nov sent out - BHazardous
Properly repair the broken or defective -wood window sill front room 2nd sty. apt. 2 front.
Mar 6, 2002
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at bathroom and kitchen sink at 2nd sty. rear apt. 2r.
Mar 6, 2002
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at 2nd sty. rear apt. 2r kitchen and bathroom.
Mar 6, 2002
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at 2nd sty. rear apt. 2r water closet bathroom er1.
Mar 6, 2002
Open — Nov sent out
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 1
- Hazardous
Failure to maintain. defect noted: at south side of premises on 2nd fl approx. 20' non loadbearing wall has water damage. damage has loosen shoe plate & wall is in danger of collapsing. wood framed wall approx
Mar 13, 2006 · Penalty $2,500
Resolve
Complaints
- Door/window
Door
Oct 14, 2026 · Apt 2
Open - Paint/plaster
Ceiling
Oct 14, 2026 · Apt 2
Open - Electric
Wiring
Oct 14, 2026 · Apt 2
Open - Paint/plaster
Ceiling
Oct 13, 2026 · Apt 2
Open - Electric
Wiring
Oct 13, 2026 · Apt 2
Open - General
Tenant harassment
Oct 13, 2026 · Apt 2
Open - Electric
Wiring
Oct 8, 2026 · Apt TOPOFR
Close - Door/window
Door
Oct 8, 2026 · Apt TOPOFR
Close - Paint/plaster
Wall
Oct 8, 2026 · Apt TOPOFR
Close - Unsanitary condition
Mold
Oct 2, 2026 · Apt 2
Close
Show 25 more ↓
- Appliance
Refrigerator
Apr 29, 2015 · Apt 2
Close - Heat/hot water
Apartment only
Feb 12, 2015 · Apt 2
Close - Heat/hot water
Entire building
Feb 2, 2015 · Apt 2
Close - Heat/hot water
Entire building
Feb 1, 2015 · Apt BLDG
Close - Plumbing
Toilet
Jan 30, 2015 · Apt 2
Close - Plumbing
Basin/sink
Jan 30, 2015 · Apt 2
Close - Heating
Heat related
Jan 1, 2014 · Apt 1
Close - Heating
Heat related
Dec 3, 2012 · Apt 2R
Close - General
Mold
Aug 27, 2010 · Apt 2
Close - Plumbing
Water-leaks
Aug 27, 2010 · Apt 2
Close - General
Doors
Aug 27, 2010 · Apt 2
Close - Plumbing
Basin/sink
Aug 27, 2010 · Apt 2FL
Close - Plumbing
Basin/sink
Aug 27, 2010 · Apt 2FL
Close - General
Windows
Aug 27, 2010 · Apt 2FL
Close - Heating
Heat related
Feb 19, 2009 · Apt 2FL
Close - Heating
Heat-plant
Feb 19, 2009 · Apt 2FL
Close - Plumbing
Water supply
Feb 25, 2006 · Apt 2R
Close - Plumbing
Water supply
Feb 24, 2006 · Apt 2R
Close - Plumbing
Water supply
Feb 24, 2006 · Apt 2R
Close - General
Windows
Feb 24, 2006 · Apt 2R
Close - Plumbing
Radiator
Feb 24, 2006 · Apt 2R
Close - Plumbing
Water supply
Feb 24, 2006 · Apt 1FL
Close - Plumbing
Water supply
Feb 19, 2006 · Apt 1FL
Close - Paint/plaster
Ceiling
Oct 8, 2005 · Apt 2R
Close - Heating
Radiator
Jun 10, 2004 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1931
- Floors
- 2
- Residential units
- 2
- Building area
- 2,800 ft²
- Lot area
- 2,032 ft²
- Zoning
- R5B
- Community board
- 412
- Council district
- 27
- Block / lot
- 11071 / 5
- Assessed value
- $53,580
- Landmark / historic district
- No
Questions about 199-23 Linden Boulevard
Who owns 199-23 Linden Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 19923 Silver Property LLC.
Does 199-23 Linden Boulevard have violations?
Yes. NYC HPD has recorded 81 housing violations at this property.
Is 199-23 Linden Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 199-23 Linden Boulevard built?
City records list 1931 as the year it was built.
How many apartments are in 199-23 Linden Boulevard?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.