115-56 191 Street
Queens, NY 11412BBL 4-11056-0032Map
Owner of record: Ramdin, Nazim
115-56 191 Street is a two-family home built in 1925 in Queens, 11412. It has 2 residential units across 2.5 floors. The owner of record is Ramdin, Nazim. HPD has recorded 57 housing violations here, most recently on December 26, 2023. 46 of the 50 most recent violations are still open.
- HPD violations
- 57
- DOB violations
- 2
- ECB violations
- 2
- HPD complaints
- 101
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 57
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 26, 2023
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 1, 1st story, 1st apartment from south at west
Dec 25, 2023 · Apt 1
Open — Invalid certification - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west
Dec 25, 2023 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west
Dec 25, 2023 · Apt 1
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at metal gate and at front yard and at building entarnce , 1st story
Mar 17, 2012
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story
Mar 17, 2012 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color walls and ceilngs in the entire apartment located at apt 1, 1st story
Mar 17, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlets at walls in the entire apartment located at apt 1, 1st story
Mar 17, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt 1, 1st story
Mar 17, 2012 · Apt 1
Open — Nov sent out - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit located at apt 1, 1st story
Feb 18, 2012 · Apt 1
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1, 1st story
Feb 18, 2012 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 1, 1st story
Feb 18, 2012 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 1st room from east at north located at apt 1, 1st story
Feb 18, 2012 · Apt 1
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at extension roof in the 1st room from east at north located at apt 1, 1st story
Feb 18, 2012 · Apt 1
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1, 1st story
Feb 18, 2012 · Apt 1
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story
Jan 4, 2012 · Apt 2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story
Jan 4, 2012 · Apt 1
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated building entrance metal door lock , 1st story
Jan 4, 2012
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story
Dec 13, 2011 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the kitchen located at apt 2, 2nd story
Dec 13, 2011 · Apt 2
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at extension roof in the 2nd room from north at east located at apt 1, 1st story
Sep 22, 2011 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the broken or defective south wall electrical outlet in the 1st room from north at west located at apt 1, 1st story
Sep 22, 2011 · Apt 1
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock metal security gate at entrance to building
Sep 22, 2011
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Sep 22, 2011
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from north at east located at apt 1, 1st story
Sep 22, 2011 · Apt 1
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1, 1st story
Sep 22, 2011 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... and mildew at east wall in the 2nd room from north at east located at apt 1, 1st story
Sep 22, 2011 · Apt 1
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1, 1st story
Sep 22, 2011 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1, 1st story
Sep 22, 2011 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the broken or defective electrical outlet at north wall in the bathroom located at apt 1, 1st story
Sep 22, 2011 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing glass panes at entrance door in the 1st room from north at east located at apt 1, 1st story
Sep 22, 2011 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the broken or defective electrical outlet at north wall in the 1st room from north at east located at apt 1, 1st story
Sep 22, 2011 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the broken or defective electrical outlets at wall in the 2nd room from north at east located at apt 1, 1st story
Sep 22, 2011 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlet at south wall in the 2nd room from east located at apt 1, 1st story
Jun 22, 2011 · Apt 1
Open — Certification postponment granted - BHazardous
Replace with new the broken or defective missing knob to door in the 1st room from east at north located at apt 1, 1st story
Jun 22, 2011 · Apt 1
Open — Certification postponment granted - ANon-hazardous
Properly repair with similar material the broken or defective silicon between bathtub and tiles in the bathroom located at apt 1, 1st story
Jun 22, 2011 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical outlet at south wall in the 3rd room from east located at apt 1, 1st story
Jun 22, 2011 · Apt 1
Open — Certification postponment granted - BHazardous
Properly repair with similar material the broken or defective fire retarted sheetrock ceiling over boiler at cellar
Jun 22, 2011
Open — Certification postponment denied - BHazardous
Abate the nuisance consisting of make door to rear yard openable at cellar
Jun 22, 2011
Open — Certification postponment denied - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .... in the bathroom located at apt 1, 1st story
Jun 22, 2011 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls in the 2nd room from east at south located at apt 1, 1st story
Jun 22, 2011 · Apt 1
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective broken ceramic tiles at floor in the kitchen located at apt 1, 1st story
Jun 22, 2011 · Apt 1
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective knob at door in the bathroom located at apt 1, 1st story
Jun 22, 2011 · Apt 1
Open — Nov sent out - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the throughout at cellar
Jun 22, 2011
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1, 1st story
Jun 22, 2011 · Apt 1
Open — Certification postponment granted - ANon-hazardous
Properly repair the broken or defective bell-buzzer system at front entrance to in the entire apartment located at apt 1, 1st story
Jun 22, 2011 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass to panel door total 3 lite. in the 1st room from east at north located at apt 1, 1st story
Jun 22, 2011 · Apt 1
Open — Certification postponment granted - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 2nd room from east at south located at apt 1, 1st story
Jun 22, 2011 · Apt 1
Open — Certification postponment granted - BHazardous
Properly repair with similar material the broken or defective fire retarted ceiling front at cellar
Jun 22, 2011
Open — Certification postponment denied - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rubbish at rear yard
Jun 22, 2011
Open — Certification postponment denied
DOB building violations · 2
- Construction other optional
Noted at cellar level installed 2x3 stud framing for a 3pc bathroom & to enclose boiler & hwh. new pex water supply lines for toilet, sink & shower. new romex wiring throughout areas of cellar running to panel with electrical boxes for switches & outlets on the new framing. stop all framing, electrical & plumbing work at cellar.
Jan 5, 2024
Dob violation - active - Construction other optional
C-construction other optional
Nov 2, 2012
Dob violation - dismissed
ECB violations · 2
- Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with department of buildings contained in summon# 39108866z issued on 03/15/2024. to file a c of c pursuant to 28-204.4, 28-20
Dec 4, 2025 · Penalty $6,250
Active - Class - 1
Rca was issued on 1/05/2024 by inspector badge # 3440 for work without a permit. inspector observed at cellar level installed 2x3 stud framing for a 3pc bathroom & to enclose boiler & hwh. new pex water supply
Mar 15, 2024 · Penalty $2,530
Active
Complaints
- Plumbing
Water supply
Aug 13, 2026 · Apt 2NDFLO
Close - Paint/plaster
Wall
Aug 13, 2026 · Apt 2NDFLO
Close - Electric
Outlet/switch
Aug 13, 2026 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Aug 13, 2026 · Apt 2NDFLO
Close - Plumbing
Basin/sink
Aug 13, 2026 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Dec 22, 2023 · Apt 1
Close - Heat/hot water
Apartment only
Nov 28, 2023 · Apt 2
Close - Heat/hot water
Apartment only
Oct 13, 2019 · Apt 2
Close - Heat/hot water
Apartment only
Oct 31, 2017 · Apt 2FL
Close - Heating
Heat related
Mar 4, 2012 · Apt 1
Close
Show 40 more ↓
- General
Floor
Feb 14, 2012 · Apt 1
Close - Electric
Wiring
Feb 14, 2012 · Apt 1
Close - Electric
Wiring
Feb 14, 2012 · Apt 1
Close - Electric
Wiring
Feb 14, 2012 · Apt 1
Close - General
Floor
Feb 14, 2012 · Apt 1
Close - General
Mold
Feb 14, 2012 · Apt 1
Close - Electric
Lighting
Feb 14, 2012 · Apt 1
Close - Plumbing
Water-leaks
Feb 14, 2012 · Apt 1
Close - Plumbing
Toilet
Feb 14, 2012 · Apt 1
Close - Heating
Heat related
Feb 14, 2012 · Apt 1
Close - Heating
Heat related
Feb 10, 2012 · Apt 1
Close - Heating
Heat related
Feb 6, 2012 · Apt 1
Close - Heating
Heat related
Jan 6, 2012 · Apt 1
Close - Plumbing
Radiator
Jan 3, 2012 · Apt 2
Close - Heating
Heat related
Jan 3, 2012 · Apt 2
Close - Heating
Heat related
Jan 2, 2012 · Apt 1
Close - Heating
Heat related
Dec 8, 2011 · Apt 2
Close - Plumbing
Radiator
Nov 16, 2011 · Apt 2
Close - Heating
Heat related
Nov 14, 2011 · Apt 2
Close - Electric
Wiring
Sep 20, 2011 · Apt 1
Close - General
Floor
Sep 20, 2011 · Apt 1
Close - Electric
Wiring
Sep 20, 2011 · Apt 1
Close - Electric
Wiring
Sep 20, 2011 · Apt 1
Close - Electric
Wiring
Sep 20, 2011 · Apt 1
Close - Electric
Wiring
Sep 20, 2011 · Apt 1
Close - Nonconst
Vermin
Sep 20, 2011 · Apt 1
Close - Electric
Electric-supply
Sep 20, 2011 · Apt 1
Close - General
Ceramic-tile
Sep 20, 2011 · Apt 1
Close - Plumbing
Bathtub/shower
Sep 20, 2011 · Apt 1
Close - General
Mold
Sep 20, 2011 · Apt 1
Close - Plumbing
Toilet
Sep 20, 2011 · Apt 1
Close - General
Window guards
Sep 20, 2011 · Apt 1
Close - General
Mold
Sep 20, 2011 · Apt 1
Close - Plumbing
Water-leaks
Sep 20, 2011 · Apt 1
Close - Paint/plaster
Ceiling
Sep 20, 2011 · Apt 1
Close - Nonconst
Vermin
Sep 20, 2011 · Apt 1
Close - Plumbing
Bathtub/shower
Sep 9, 2011 · Apt 1
Close - Paint/plaster
Ceiling
Sep 9, 2011 · Apt 1
Close - Plumbing
Water-leaks
Sep 9, 2011 · Apt 1
Close - General
Doors
Sep 9, 2011 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1925
- Floors
- 2.5
- Residential units
- 2
- Building area
- 1,878 ft²
- Lot area
- 9,158 ft²
- Zoning
- R3X
- Community board
- 412
- Council district
- 27
- Block / lot
- 11056 / 32
- Assessed value
- $53,040
- Landmark / historic district
- No
Questions about 115-56 191 Street
Who owns 115-56 191 Street?
The owner of record in NYC Department of City Planning PLUTO data is Ramdin, Nazim.
Does 115-56 191 Street have violations?
Yes. NYC HPD has recorded 57 housing violations at this property.
Is 115-56 191 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 115-56 191 Street built?
City records list 1925 as the year it was built.
How many apartments are in 115-56 191 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.