172-30 93 Avenue
Queens, NY 11433BBL 4-10219-0032Map
Owner of record: Parental Properties LLC
172-30 93 Avenue is an elevator apartment building built in 2021 in Queens, 11433. It has 9 residential units across 4 floors. The owner of record is Parental Properties LLC. HPD has recorded 9 housing violations here, most recently on April 25, 2008. 9 of the 9 most recent violations are still open.
- HPD violations
- 9
- DOB violations
- 6
- ECB violations
- 35
- HPD complaints
- 23
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & west wall in the 5th room from north located at apt 1, 1st story
Apr 25, 2008 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 6th room from north at east located at apt 1, 1st story
Apr 25, 2008 · Apt 1
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over in the 6th room from north at east located at apt 1, 1st story
Apr 25, 2008 · Apt 1
Open — Nov sent out - BHazardous
Properly secure the loose ceiling tiles in the private hallway located at apt 1, 1st story
Apr 25, 2008 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & walls in the 6th room from north at west located at apt 1, 1st story
Apr 25, 2008 · Apt 1
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over in the 6th room from north at west located at apt 1, 1st story
Apr 25, 2008 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective window pane in the kitchen located at apt 1, 1st story
Apr 25, 2008 · Apt 1
Open — Nov sent out - BHazardous
Properly secure the loose ceiling tiles in the kitchen located at apt 1, 1st story
Apr 25, 2008 · Apt 1
Open — Nov sent out - BHazardous
Replace with new the missing ceiling tiles in the kitchen located at apt 1, 1st story
Apr 25, 2008 · Apt 1
Open — Nov sent out
DOB building violations · 6
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 30, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - dismissed - Immediate emergency anythingoptional
Seal all accessible openings, repair fence and obtain all required permits
Oct 28, 2019
Dob violation - dismissed - Construction other optional
.due to fire,
Oct 27, 2019
Dob violation - active
ECB violations · 35
- Class - 2
I observed a closed site, while researching i found several temporary equipment permits expired( including pipe scaffold erected at exposure #1 on 3rd floor setback)
Jul 9, 2025 · Penalty $6,250
Active - Class - 2
I observed a closed site. construction fence not maintained and permit expired
Jul 9, 2025 · Penalty $6,250
Active - Class - 2
I observed a poorly maintained construction fence while conducting an inspection. fence permit is expired as well
Jul 9, 2025 · Penalty $5,000
Active - Class - 2
During inspection of a new build with a construction fence around the perimeter, i observed that the fence was leaning, had graffiti all over it and it was missing or had covered viewing panels. the fence has n
Aug 20, 2024 · Penalty $5,000
Active - Class - 2
During inspection of a 4 story new build, i observed in dob records that the construction fence permit expired april 03, 2024 all permits must be kept updated for the duration of the time construction equipment
Aug 20, 2024 · Penalty $6,250
Active - Class - 2
During inspection i observed part of a construction fence approximately 36 linear feet had collapsed on to the adjacent property driveway. the down fence panels had exposed and protruding screws that could inju
Jan 10, 2024 · Penalty $5,000
Resolve - Class - 2
During inspection there were several cars parked in the driveway, the home owner showed a white car with concrete splatter in multiple locations which was in the driveway during construction concrete operation
Jan 10, 2024 · Penalty $10,000
Active - Class - 2
Failure to provide/maintain supported pipe scaffold: at inspection, it was observed scaffold on exposures 2 & 4 that were having loose and hanging netting, not fully planked and missing guardrails contrary to c
Jul 7, 2023
Resolve - Class - 2
Failure to provide p.e. approved detail design drawings.noted:at time of inspection on active construction site observed at exp #1 floor #1 to #4 steel panel staircase in place & no pe approved detail design dr
Sep 7, 2022
Resolve - Class - 1
3301.2 at time of my inspection at an active jobsite,observed a metal staircase in use place from 1st to 4th floor level,missing the stair infills which created a safety hazard such as trip and fall for workers
Jul 29, 2022 · Penalty $2,500
Active
Show 25 more ↓
- Class - 1
Failure to maintain adequate housekeeping per section requirements.observed at an active jobsite inadequate housekeeping at exp2 and 4 consisted of debris,grabage and combustible materials(wood)that also blocke
Jul 29, 2022 · Penalty $2,500
Resolve - Class - 2
Bc3314.8.2 debris netting supported scaffold inadequate.at time of inspection of closed permitted job site observed supported scaffolds 5' sections in height installed at building exposures debris netting not m
Apr 19, 2022 · Penalty $1,250
Resolve - Class - 1
False statements in certificates,forms,written statements,applicationsreports or certificates of correction.in response to an ongoing concrete enforcement unit audit job#nb421862746,the respondent submitted a t
Feb 4, 2022 · Penalty $10,000
Resolve - Class - 1
Bc3301.7 failure to provide approved const formwork drawing.as noted:atoi for active const site during (illegible) placement for columns&shear walls from 3rd level to 4th slab level.observed concrete placed on
Dec 9, 2021 · Penalty $312
Resolve - Class - 2
Failure to perform proper concrete washout procedures&collection containment.atoi for active const site during placement concrete 130cy@4th level slab&(illegible),columns.observed concrete truck washout water@e
Dec 9, 2021 · Penalty $2,500
Resolve - Class - 1
Const super failed to perform duties per code.as noted:atoi for activeconst site during concrete placement.observed (1)concrete placed for slabs,columns&shear walls up to 4th slab level w/o approved concrete de
Dec 9, 2021 · Penalty $2,500
Resolve - Class - 1
Bc1905.12 failure to implement cold weather requirements for concrete placed during freezing or near freezing weather.as noted:atoi for active const site during concrete placement@4th slab level.observed curren
Dec 9, 2021
Resolve - Class - 2
Failure to perform spc insp&verification for concrete const as required by sec&(illegible)1704.4.as noted atoi for active const site clearing placement of 130cy 5000psi for shear walls,columns from 3rd slab to
Dec 9, 2021
Resolve - Class - 2
28-116.2.3 failure to provide adequate insp program tr3 as noted:atoi for active const site during (illegible) concrete@4th slab level.observed placing 130cy 5000psi pressure strength.however upon request for t
Dec 9, 2021
Resolve - Class - 2
Failure to provide adequate curing box.as noted:atoi for active const site during concrete placement for 130cy@4th slab level.observed 10#s of cylinder 4"x8" of concrete sample placed@1st level exposed to cold
Dec 9, 2021 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments.at time of inspection at an active new building project,i observed conditions of supported pipe scaffold at all 4 exposures wh
Dec 6, 2021 · Penalty $625
Resolve - Class - 1
Unsafe storage of combustible material&equipment.noted:ato my insp of n4styb,const in progress@3fl aprx6workers onsite,i observed 4large plastic gasoline containers beneath some netting in concrete pourer,i the
Nov 12, 2021 · Penalty $625
Resolve - Class - 2
Bc3309.1 protection of adjoining property.noted:ato my insp of n4styb,const in progress@3fl level,aprx6workers onsite,i observed adjoining properties@exp2&4 didnt have any overhead projection for active drivewa
Nov 12, 2021
Resolve - Class - 2
Bc3301.13.1 inadequate ssp.noted:ato my insp of n4styb,const in progress@3fl level,aprx6workers onsite,i asked to rev ssp for project,i was given 5pg doc markeda-001.00-a-005.00 (not ssp) only 1pg showed plan o
Nov 12, 2021
Resolve - Class - 1
Failure to maintain record of orientations performed@worksite noted:ato my insp of n4styb,const in progress@3fl level,aprx6workers onsite,i informed const super that i would randomly pick 1worker onsite&he woul
Nov 12, 2021 · Penalty $1,250
Resolve - Class - 2
Jobsite fence not const or maintained pursuant to subsec noted:ato my insp of n4styb,const in progress@3fl level,aprx6workers onsite,i observed double gates in fenec@exp1 were leaning back aprx1.5'&fence@exp3 w
Nov 12, 2021
Resolve - Class - 1
3303.4.1.1 maintenance-sidewalk.at the time of my inspection on a closed and permitted jobsite i observed at exp1 of the jobsite that the sidewalk was badly cracked due to construction activities at site of exc
Aug 23, 2021 · Penalty $1,250
Resolve - Class - 1
Permit holder failure to ensure that each construction or demolition worker working on site has sst card or temp sst card.atoi cruz palchizaca working at site without an sst card or temp sst card and also witho
Aug 4, 2021
Resolve - Class - 1
Owner failed to ensure that each construction or demolitions worker engaged at site has sst card or temp sst card. atoi cruz palchizaca working on site without sst card or temp sst card also without state id.re
Aug 4, 2021
Resolve - Class - 1
Permit holder failed to ensure each construction or demolition worker working at site has sst card or temp sst card. at time of inspection andrea tenezaca working at site without sst card or temp sst card also
Aug 4, 2021
Resolve - Class - 1
Owner failed to ensure that each construction or demolition worker engaged at site has sst card or temp sst card.atoi andrea tenezaca working at site without sst card or temp sst card also without state id.reme
Aug 4, 2021
Resolve - Class - 1
Permit holder failed to maintain daily log identifying each worker and a copy of sst card or temporary sst card.atoi observed luis palchizaca,cruz palchizaca,andrea tenezaca,segundo yupa working on site not lis
Aug 4, 2021
Resolve - Class - 1
Work without a permit.at time of inspection i was responding to an icident due to a fire.i observed a construction fence erected around premises.no record permit on bis of dob for work performed.remedy:obtain p
Oct 27, 2019 · Penalty $6,250
Resolve - Class - 2
3307.7.3=viewng panels no viewing panles installed on construction fence provide viewing panels as per code
Oct 27, 2019 · Penalty $3,125
Resolve - Class - 2
3301.9.1=ence project information panel at time of inspection no information panel with pemrit for construction not posted panble board pemrit posting missing proivde project information panel
Oct 27, 2019 · Penalty $3,125
Resolve
Complaints
- General
Mold
May 20, 2008 · Apt 1FL
Close - Plumbing
Water-leaks
May 20, 2008 · Apt 1FL
Close - Paint/plaster
Window/frame
May 20, 2008 · Apt 1FL
Close - General
Mold
May 20, 2008 · Apt 1FL
Close - Plumbing
Water-leaks
May 20, 2008 · Apt 1FL
Close - Paint/plaster
Window/frame
May 20, 2008 · Apt 1FL
Close - General
Windows
May 20, 2008 · Apt 1FL
Close - General
Windows
May 20, 2008 · Apt 1FL
Close - Paint/plaster
Window/frame
May 20, 2008 · Apt 1FL
Close - General
Ceramic-tile
May 20, 2008 · Apt 1FL
Close
Show 13 more ↓
- Paint/plaster
Window/frame
May 20, 2008 · Apt 1FL
Close - General
Floor
May 20, 2008 · Apt 1FL
Close - Plumbing
Basin/sink
May 20, 2008 · Apt 1FL
Close - Paint/plaster
Ceiling
May 20, 2008 · Apt 1FL
Close - Paint/plaster
Ceiling
May 20, 2008 · Apt 1FL
Close - Paint/plaster
Window/frame
May 20, 2008 · Apt 1FL
Close - General
Mold
Mar 14, 2008 · Apt 1
Close - Nonconst
Vermin
Mar 14, 2008 · Apt 1
Close - Paint/plaster
Ceiling
Mar 14, 2008 · Apt 1
Close - General
Windows
Mar 14, 2008 · Apt 1
Close - General
Windows
Mar 14, 2008 · Apt 1
Close - General
Windows
Mar 14, 2008 · Apt 1
Close - General
Doors
Mar 14, 2008 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2021
- Floors
- 4
- Residential units
- 9
- Building area
- 13,638 ft²
- Lot area
- 8,350 ft²
- Zoning
- R5
- Community board
- 412
- Council district
- 27
- Block / lot
- 10219 / 32
- Assessed value
- $666,000
- Landmark / historic district
- No
Questions about 172-30 93 Avenue
Who owns 172-30 93 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Parental Properties LLC.
Does 172-30 93 Avenue have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 172-30 93 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 172-30 93 Avenue built?
City records list 2021 as the year it was built.
How many apartments are in 172-30 93 Avenue?
It has 9 residential units and 10 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.