roofy

107-03 Guy R Brewer Blvd

Queens, NY 11433BBL 4-10166-0029Map

Owner of record: Bizati Realty LLC

107-03 Guy R Brewer Blvd is a mixed residential and retail building built in 1930 in Queens, 11433. It has 3 residential units across 2 floors. The owner of record is Bizati Realty LLC. HPD has recorded 55 housing violations here, most recently on May 7, 2026.

HPD violations
55
DOB violations
0
ECB violations
0
HPD complaints
79

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 55

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the 1st room from north located at apt 2r, 2nd story, 1st apartment from east at south

    Dec 29, 2023 · Apt 2R

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of hotwater exceeding the maximum temperature of 130 degrees at all hotwater fixtures in entire apartment in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south

    Dec 29, 2023 · Apt 2R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south

    Dec 29, 2023 · Apt 2R

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south

    Dec 29, 2023 · Apt 2R

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south

    Dec 29, 2023 · Apt 2R

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    Dec 6, 2023 · Apt 2R

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room, 1st story

    Dec 6, 2023

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 29, 2023

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 3; missing one way screws and stops in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 16, 2022 · Apt 2F

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. missing wg to install = 4; wg to replace = 2; wg to repair = 0; in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south

    Apr 29, 2022 · Apt 2F

    Closed — Violation dismissed
  • C

    Replace with new the missing lower sash at south window in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Apr 29, 2022 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, west wall in the 4th room from east at south located at apt 2f, 2nd story, 1st apartment from east at south

    Apr 29, 2022 · Apt 2F

    Closed — Violation closed
  • B

    Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof .. at public hall, 2nd story

    Apr 22, 2022

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2021

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 15, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 5, 2019

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Nov 5, 2019

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Nov 5, 2019

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Nov 5, 2019

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Nov 5, 2019

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Nov 5, 2019

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Nov 5, 2019

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 1, 2019

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, west wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 3rd room from east located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 4th room from east at south located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, west wall in the 4th room from east at north located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective rotted wood base under sink at cabinet in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall, 1st window frame from east at south wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    May 25, 2018

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    May 25, 2018

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    May 25, 2018

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story

    May 25, 2018

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    May 25, 2018

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 4th room from east at south located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall, 1st closet from north at east wall wall in the 4th room from east at north located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the south wall in the 3rd room from east located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the west wall, south wall in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; missing oneway screws and stops in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • B

    Replace with new the broken or defective window glass upper sash in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south

    May 25, 2018 · Apt 2F

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of scalding hot water exceeding 130 deegrees f in the kitchen located at apt 2f, 2nd story, apartment at south

    Jan 29, 2018 · Apt 2F

    Closed — Violation dismissed
  • B

    Replace with new the missing ceramic tiles at the west wall in the bathroom located at apt 2f, 2nd story, apartment at south

    Jan 29, 2018 · Apt 2F

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the bathroom , the kitchen located at apt 2fl, 2nd story, 1st apartment from east at south

    Jul 28, 2017 · Apt 2FL

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, west wall, east wall, ceiling in the bathroom located at apt 2fl, 2nd story, 1st apartment from east at south

    Jul 28, 2017 · Apt 2FL

    Closed — Violation closed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Apartment only

    Dec 27, 2023 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Dec 4, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Oct 23, 2023 · Apt 2R

    Close
  • General

    Bell/buzzer/intercom

    Sep 30, 2023 · Apt 2F

    Close
  • Plumbing

    Water supply

    Jul 7, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2022 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Nov 1, 2019 · Apt 1

    Close
  • Paint/plaster

    Cabinet

    May 19, 2018 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Feb 3, 2018 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2018 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Jan 28, 2018 · Apt 2F

    Close
  • Plumbing

    Basin/sink

    Jan 28, 2018 · Apt 2F

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2018 · Apt 2F

    Close
  • Plumbing

    Steam pipe/riser

    Jan 25, 2018 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Jul 25, 2017 · Apt 2FL

    Close
  • Paint/plaster

    Wall

    Jul 25, 2017 · Apt 2FL

    Close
  • Heating

    Heat related

    Nov 10, 2012 · Apt 2F

    Close
  • Electric

    Lighting

    Nov 10, 2012 · Apt 2F

    Close
  • General

    Windows

    Nov 10, 2012 · Apt 2F

    Close
  • Electric

    Lighting

    Nov 10, 2012 · Apt 2F

    Close
  • Heating

    Heat related

    Nov 1, 2012 · Apt NA

    Close
  • Heating

    Heat related

    Jan 26, 2012 · Apt 2R

    Close
  • Heating

    Heat related

    Jan 25, 2012 · Apt 2R

    Close
  • Heating

    Heat related

    Jan 25, 2012 · Apt 2R

    Close
  • Heating

    Heat related

    Jan 24, 2012 · Apt 2F

    Close
  • Heating

    Heat related

    Jan 21, 2012 · Apt 2R

    Close
  • Heating

    Heat related

    Jan 11, 2012 · Apt 2R

    Close
  • Heating

    Heat related

    Dec 16, 2011 · Apt 2F

    Close
  • Heating

    Heat related

    Nov 30, 2011 · Apt 2F

    Close
  • Heating

    Heat related

    Oct 30, 2011 · Apt 2R

    Close
  • Heating

    Heat related

    Oct 30, 2011 · Apt 1

    Close
  • Paint/plaster

    Wall

    Jan 20, 2010 · Apt 2

    Close
  • Nonconst

    Vermin

    Jan 20, 2010 · Apt 2

    Close
  • Electric

    Electric-supply

    Jan 20, 2010 · Apt 2

    Close
  • Nonconst

    Vermin

    Jan 20, 2010 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jan 20, 2010 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jan 20, 2010 · Apt 2

    Close
  • Heating

    Heat related

    Jan 20, 2010 · Apt 2

    Close
  • Nonconst

    Vermin

    Jan 20, 2010 · Apt 2

    Close
  • Nonconst

    Vermin

    Jan 20, 2010 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Jan 20, 2010 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jan 20, 2010 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jan 20, 2010 · Apt 2

    Close
  • Electric

    Electric-supply

    Jan 20, 2010 · Apt 2

    Close
  • Electric

    Wiring

    Jan 20, 2010 · Apt 2

    Close
  • Plumbing

    Sewer

    Jan 20, 2010 · Apt 2

    Close
  • Heating

    Heat related

    Jan 20, 2010 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jan 20, 2010 · Apt 2

    Close
  • Nonconst

    Vermin

    Jan 20, 2010 · Apt 2

    Close
  • Plumbing

    Sewer

    Jan 20, 2010 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S3)
Year built
1930
Floors
2
Residential units
3
Building area
3,200 ft²
Lot area
2,000 ft²
Zoning
R6D
Community board
412
Council district
27
Block / lot
10166 / 29
Assessed value
$274,500
Landmark / historic district
No

HPD registration #414827, last renewed Jul 22, 2025.

Questions about 107-03 Guy R Brewer Blvd

Who owns 107-03 Guy R Brewer Blvd?

The owner of record in NYC Department of City Planning PLUTO data is Bizati Realty LLC.

Does 107-03 Guy R Brewer Blvd have violations?

Yes. NYC HPD has recorded 55 housing violations at this property.

Is 107-03 Guy R Brewer Blvd rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 107-03 Guy R Brewer Blvd built?

City records list 1930 as the year it was built.

How many apartments are in 107-03 Guy R Brewer Blvd?

It has 3 residential units and 4 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.