106-41 Guy R Brewer Blvd
Queens, NY 11433BBL 4-10161-0051Map
Owner of record: Manision Homes LLC
106-41 Guy R Brewer Blvd is a two-family home built in 1925 in Queens, 11433. It has 2 residential units across 2 floors. The owner of record is Manision Homes LLC. HPD has recorded 52 housing violations here, most recently on March 3, 2026. 29 of the 50 most recent violations are still open.
- HPD violations
- 52
- DOB violations
- 2
- ECB violations
- 1
- HPD complaints
- 35
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 52
- BHazardous
Properly repair or replace the broken or defective cold water faucet handle at sink in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Mar 3, 2026 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Mar 3, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding the maximum temperature of 130f degrees at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jan 8, 2026 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective hand rail at south wall at public hall stairs, 2nd story
Jan 8, 2026
Closed — Violation dismissed - BHazardous
Replace with new the missing lower base cabinet door at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Jan 8, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets cold water fixtures handle at sink in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Jan 8, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Jan 8, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jan 8, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jan 8, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jan 8, 2026 · Apt 2
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Properly repair or replace the broken or defective lower refrigerator gasket in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Jan 8, 2026 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 2nd apartment from north at east
Dec 15, 2025 · Apt 2
Open — Nov certified late - ANon-hazardous
Repair the broken or defective connection drain pipe at sink in the kitchen located at apt 2, 2nd story, 2nd apartment from north at east
Dec 15, 2025 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 6, 2025 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the mold arround bathtub in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 6, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 6, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective gasket at refridgerator in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 6, 2025 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Refit ,apartment door in the entrance located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jul 6, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jun 13, 2025 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective rubber gaskets at refrigerator door in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jun 13, 2025 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Refit door at sink base cabinet in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jun 13, 2025 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the mildew at ceramic tiles at south wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jun 13, 2025 · Apt 2NDFLO
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of nail protruding at all wood treads at public hall stairs, 1st story
Jun 13, 2025
Open — Nov certified late - BHazardous
Properly secure the loose wood handrail to south wall at public hall stairs, 1st story
Jun 13, 2025
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Jun 13, 2025 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the, 1st window frame from east at south wall, 1st closet from east at south wall door, 1st window frame from east at south wall, 1st closet from east at south wall door in the private hallway located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the, 1st window frame from south at west wall, 1st window frame from south at west wall in the 3rd room from east located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective base cabinet door at the sink in the kitchen located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Open — Nov certified late - BHazardous
Properly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Open — Nov certified late - BHazardous
Properly secure the loose hand rail at stairs in the private hallway located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Open — Nov certified late - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 3rd room from east located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st closet from north at east wall door frame, south wall in the 3rd room from east located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, west wall in the 2nd room from east located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame in the private hallway located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the private hallway located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall, south wall, east wall in the bathroom located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, 1st window frame from north at east wall in the kitchen located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door frame in the kitchen located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Open — Nov certified late - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the, 1st door frame from east at south wall, 1st door frame from east at south wall in the 2nd room from east located at apt 2floor, 2nd story, 2nd apartment from north at east
Mar 25, 2025 · Apt 2FLOOR
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Feb 24, 2025 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Feb 24, 2025 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Feb 24, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from east located at apt 2, 2nd story, 1st apartment from north at east
Feb 24, 2025 · Apt 2
Closed — Violation dismissed - IInformation / order
The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for at cellar north 1 vacate # 167618, date posted and mailed, july 13, 2021, effective date, july 14, 2021.
Jul 13, 2021
Open — Info nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible at gas range at cellar
Jun 24, 2021
Open — Nov sent out
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 2, 2022
Dob violation - active - Unsafe buildings none
Ub-unsafe buildings none
Feb 28, 1994
Dob violation - active
ECB violations · 1
- Class - 1
Occupancy contrary to that allowed by the certificate of occupancy or building department records cellar usage changed from ordinary storageto an apartment with kitchen and bathroom facilities installed.rem:dis
Jun 24, 2021 · Penalty $2,500
Active
Complaints
- Heat/hot water
Entire building
Apr 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 1, 2026 · Apt 2
Close - Electric
Power outage
Jan 5, 2026 · Apt 2
Close - Heat/hot water
Entire building
Jan 5, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 12, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Dec 6, 2025 · Apt 2
Close - Plumbing
Basin/sink
Jun 10, 2025 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Jun 10, 2025 · Apt 2NDFLO
Close
Show 25 more ↓
- General
Cabinet
Jun 10, 2025 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Jun 10, 2025 · Apt 2NDFLO
Close - Unsanitary condition
Mold
Jun 10, 2025 · Apt 2NDFLO
Close - Appliance
Electric/gas range
Jun 10, 2025 · Apt 2NDFLO
Close - Appliance
Refrigerator
Jun 10, 2025 · Apt 2NDFLO
Close - Electric
Power outage
Mar 24, 2025 · Apt 2FLOOR
Close - Heat/hot water
Entire building
Feb 28, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 25, 2025 · Apt 2NDFLO
Close - Plumbing
Water supply
Feb 25, 2025 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Feb 25, 2025 · Apt 2NDFLO
Close - Heat/hot water
Entire building
Feb 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 20, 2025 · Apt 2
Close - Paint/plaster
Wall
Feb 20, 2025 · Apt 2
Close - Heat/hot water
Entire building
Feb 20, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Jun 22, 2021 · Apt BASEME
Close - Unsanitary condition
Mold
Jun 16, 2021 · Apt BASEME
Close - Appliance
Electric/gas range
Jun 16, 2021 · Apt BASEME
Close - Electric
Wiring
Jun 16, 2021 · Apt BASEME
Close - Water leak
Heavy flow
Jun 16, 2021 · Apt BASEME
Close - Unsanitary condition
Mold
May 26, 2021 · Apt BASEME
Close - Electric
Wiring
May 26, 2021 · Apt BASEME
Close - Water leak
Heavy flow
May 26, 2021 · Apt BASEME
Close - Appliance
Electric/gas range
May 26, 2021 · Apt BASEME
Close - Heat/hot water
Entire building
Nov 17, 2015 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B3)
- Year built
- 1925
- Floors
- 2
- Residential units
- 2
- Building area
- 1,216 ft²
- Lot area
- 2,000 ft²
- Zoning
- R7A
- Community board
- 412
- Council district
- 27
- Block / lot
- 10161 / 51
- Assessed value
- $46,560
- Landmark / historic district
- No
HPD registration #925210, last renewed Jul 18, 2025.
Questions about 106-41 Guy R Brewer Blvd
Who owns 106-41 Guy R Brewer Blvd?
The owner of record in NYC Department of City Planning PLUTO data is Manision Homes LLC.
Does 106-41 Guy R Brewer Blvd have violations?
Yes. NYC HPD has recorded 52 housing violations at this property.
Is 106-41 Guy R Brewer Blvd rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 106-41 Guy R Brewer Blvd built?
City records list 1925 as the year it was built.
How many apartments are in 106-41 Guy R Brewer Blvd?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.