95-09 Sutphin Boulevard
Queens, NY 11435BBL 4-10027-0036Map
Owner of record: 147 St Holdings LLC
95-09 Sutphin Boulevard is a store building built in 1925 in Queens, 11435. It has 1 residential unit across 2 floors. The owner of record is 147 St Holdings LLC. HPD has recorded 25 housing violations here, most recently on August 11, 2026. 22 of the 25 most recent violations are still open.
- HPD violations
- 25
- DOB violations
- 12
- ECB violations
- 2
- HPD complaints
- 33
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- ANon-hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wire at north wall in the private hallway located at apt 2, 2nd story, 1st apartment from west at north
Aug 11, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balances at lower sash window at north wall in the 1st room from north located at apt 2, 2nd story, 1st apartment from west at north
Aug 11, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective glass pane at upper sash window at north wall in the 1st room from north located at apt 2, 2nd story, 1st apartment from west at north
Aug 11, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hot water exceeding maximum allowable temperature of 130f degree at all water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Aug 11, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling in the bathroom located at apt 2 upper level, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of hotwater exceeding the maximum temperature of 130 degrees in the kitchen located at apt 2 upper level, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the foyer located at apt 2 upper level, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance window upper sash at east wall in the 1st room from east located at apt 2 upper level, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2 upper level, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at east wall in the bathroom located at apt 2 upper level, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2
Closed — Violation closed
Show 15 more ↓
- BHazardous
Properly repair or replace the broken or defective counter balance window lower sash at south wall in the bathroom located at apt 2 upper level, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and east wall in the kitchen located at apt 2 upper level, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2 upper level, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and north wall at public hall, 2nd story
Mar 11, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at east wall in the bathroom located at apt 2 upper level, 2nd story, 1st apartment from north at east original violation 18699929 issued 11-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Mar 11, 2026 · Apt 2
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and east wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Mar 10, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective cracked glass pane at lower window sash at the south wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Mar 10, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light switch at the north wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from north at east
Mar 10, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from north at east
Mar 10, 2026 · Apt 2NDFLO
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of extremely hot water found at sink 145f exceeding the maximum temperature of 130f in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Mar 10, 2026 · Apt 2NDFLO
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective upper and lower window sashes spring balances at the west wall in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Mar 10, 2026 · Apt 2NDFLO
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east and west walls in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from north at east
Mar 10, 2026 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper and lower window sashes spring balances at the east wall. in the 2nd room from east located at apt 2ndflo, 2nd story, 1st apartment from north at east
Mar 10, 2026 · Apt 2NDFLO
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding maximum allowable temperature of 130f in the entire apartment located at apt apt2, 2nd story, 1st apartment from north at east
Jan 19, 2026 · Apt APT2
Closed — Violation dismissed
DOB building violations · 12
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed
Show 2 more ↓
- Boiler boiler optional
18b
Nov 17, 1989
Vp-violation unserved ecb-active - Boiler boiler optional
B-boiler boiler optional
Aug 8, 1986
Dob violation - active
ECB violations · 2
- Class - 2
Hot water heater relief valve missing discharge piping, boiler relief valve discharge piping incorrect, recement around flue at chimney base correct all violating conditions and submit a certificate of correcti
Nov 2, 2023
Resolve - Non-hazardous
Work without a permit.work noted:installed new exhaust hood at 1st floor deli.hood has new approx 12"pipe running from 1st floor to roof.allnew 100% completed.remedy:obtain a permit or restore to prior legal co
Jun 2, 2005 · Penalty $2,500
Resolve
Complaints
- Door/window
Window pane
Jul 29, 2026 · Apt 2
Close - Unsanitary condition
Pests
Jul 29, 2026 · Apt 2
Close - Plumbing
Water supply
Jul 29, 2026 · Apt 2
Close - Door/window
Window frame
Jul 29, 2026 · Apt 2
Close - Unsanitary condition
Pests
Jul 29, 2026 · Apt 2
Close - Flooring/stairs
Floor
Jul 29, 2026 · Apt 2
Close - General
Cabinet
Jul 29, 2026 · Apt 2
Close - General
Ventilation system
Jul 29, 2026 · Apt 2
Close - Electric
No lighting
Jul 29, 2026 · Apt 2
Close - Door/window
Door
Jul 29, 2026 · Apt 2
Close
Show 23 more ↓
- Electric
Wiring
Jul 29, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Mar 10, 2026 · Apt 2
Close - Flooring/stairs
Floor
Mar 10, 2026 · Apt 2
Close - Electric
Outlet/switch
Mar 10, 2026 · Apt 2
Close - Electric
Wiring
Mar 10, 2026 · Apt 2
Close - Door/window
Door
Mar 10, 2026 · Apt 2
Close - Paint/plaster
Window/frame
Mar 10, 2026 · Apt 2
Close - Water leak
Slow leak
Mar 10, 2026 · Apt 2
Close - Plumbing
Water supply
Mar 10, 2026 · Apt 2
Close - Water leak
Damp spot
Mar 10, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Feb 11, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Jan 16, 2026 · Apt APT2
Close - General
Cooking gas
Jan 16, 2026 · Apt APT2
Close - Heat/hot water
Apartment only
Jan 16, 2026 · Apt 2NDFLO
Close - General
Cabinet
Jan 16, 2026 · Apt 2NDFLO
Close - Appliance
Refrigerator
Jan 16, 2026 · Apt 2NDFLO
Close - General
Bell/buzzer/intercom
Jan 16, 2026 · Apt 2NDFLO
Close - General
Cooking gas
Jan 16, 2026 · Apt 2NDFLO
Close - Door/window
Window frame
Jan 16, 2026 · Apt 2NDFLO
Close - Unsanitary condition
Mold
Jan 16, 2026 · Apt 2NDFLO
Close - Door/window
Door
Jan 16, 2026 · Apt 2NDFLO
Close - Door/window
Door frame
Jan 16, 2026 · Apt 2NDFLO
Close - Door/window
Window frame
Jan 16, 2026 · Apt 2NDFLO
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1925
- Floors
- 2
- Residential units
- 1
- Building area
- 2,841 ft²
- Lot area
- 1,291 ft²
- Zoning
- C6-3
- Community board
- 412
- Council district
- 27
- Block / lot
- 10027 / 36
- Assessed value
- $196,200
- Landmark / historic district
- No
Questions about 95-09 Sutphin Boulevard
Who owns 95-09 Sutphin Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 147 St Holdings LLC.
Does 95-09 Sutphin Boulevard have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 95-09 Sutphin Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 95-09 Sutphin Boulevard built?
City records list 1925 as the year it was built.
How many apartments are in 95-09 Sutphin Boulevard?
It has 1 residential units and 2 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.