95-25 Waltham Street
Queens, NY 11435BBL 4-10026-0034Map
Owner of record: Amar Marketing Enterprise 2 LLC
95-25 Waltham Street is an elevator apartment building built in 2023 in Queens, 11435. It has 52 residential units across 16 floors. The owner of record is Amar Marketing Enterprise 2 LLC. HPD has recorded 1 housing violation here, most recently on August 26, 2026. 1 of the 1 most recent violations are still open.
- HPD violations
- 1
- DOB violations
- 2
- ECB violations
- 37
- HPD complaints
- 17
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall
Aug 26, 2026
Open — Nov certified on time
DOB building violations · 2
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 15, 2024
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 21, 1981
Dob violation - dismissed
ECB violations · 37
- Class - 2
Upon inspection i observed a sidewalk shed installed at exposure 1 and reviewed approved drawings. the shed was installed contrary to the plans. 14ft & 7ft open span is not detailed. 32 inch bay is not detailed
Nov 21, 2024
Resolve - Class - 1
Elevator not in state of readiness at the of inspection on an active job site for site safety manager release, i observed that elevator was out of service as per bc 3003.3 this create a potential hazardous cond
Nov 13, 2024 · Penalty $5,000
Resolve - Class - 3
Fence exceeds permitted height. remedy: conform fence to height requirement.
Nov 7, 2024
Resolve - Class - 2
I observed pedestrian protection (sidewalk shed) installed at exposure 1 contrary to codes: 3307.6.4.4- multiple vertical members installed closer than 18in min to the face of the curb line. 3307.6.4.11- multip
Nov 7, 2024 · Penalty $2,400
Resolve - Class - 2
3307.6.5.1 safe condition. i observed a sidewalk shed/overhead protection installed @ expos 1,2&3 not maintained in safe condition. multiple mudsills & vertical members imbedded in concrete. vertical member @ e
Nov 7, 2024 · Penalty $2,500
Resolve - Class - 2
Bc 3301.1.1 responsibility for safety: nothing in this chapter shall be construed to relieve persons engaged in construction or demolition operations from complying with other applicable provisions of law. work
Oct 3, 2024
Resolve - Class - 1
Inspection of the site revealed multiple areas that had accumulated debris, such as the over head protection at ex#3 it had large amounts of construction equipment and debris on top of the shed being stored, an
Oct 3, 2024 · Penalty $2,500
Resolve - Class - 2
Bc 3303.4.10 means of egress: inspection of a 16 story building with multiple workers onsite throughout, i noticed that the fence was chained and locked, preventing anyone from exiting and reducing the site to
Oct 3, 2024 · Penalty $2,500
Resolve - Class - 2
3303.2.4 sanitary facilities: during inspection i observed 2 porta potties onsite there was a strong foul smell coming from both of them, the last cleaning of them was on 09/12/2024 on construction sites, the s
Oct 3, 2024 · Penalty $2,500
Resolve - Class - 2
During inspection i observed that the over head shed protection at exposure #3 was missing multiple parapet panels, creating a hazardous and dangerous situation, were anyone at the leading edge could fall over
Oct 3, 2024 · Penalty $2,400
Resolve
Show 27 more ↓
- Class - 1
During inspection of an active jobsite i requested to see the site safety manager, there was none onsite. the log book revealed that #00016 ssm was not onsite of the 16 story building, for several days at a tim
Jun 28, 2024 · Penalty $10,000
Resolve - Class - 1
During inspection of a16 story building with active construction, i observed that the sidewalk under the sidewalk shed was cracked up and uneven. this created a trip and falling hazard for anyone walking on the
Jun 28, 2024 · Penalty $2,500
Resolve - Class - 1
Bc 3303.4.10 means of egress on a 16 story building, i observed that the front door and the gates all had chains and locks on them. the closed chain and locks prevented workers from exiting and entering the si
Jun 28, 2024 · Penalty $5,000
Resolve - Class - 2
Adjacent property owner complaint of stucco debris blowing around in the driveway, garage and large pieces in the side yard and in the rain gutter. the debris creates an inhalation, eye irritant and clogs the d
Apr 5, 2024
Resolve - Class - 1
At the time of the inspection for jobsite 16 stories nb building, i observed a shoring post on several floors at the site, when i requested to see the approved design drawings, since the last inspection on 2-6-
Apr 1, 2024
Resolve - Class - 2
At time of my inspection on active jobsite of a 16 story nb, i observed that roof protection was not installed as per code -- exp#2 adjacent property/roof protection was not build as per plan(not fully pla
Mar 1, 2024
Resolve - Class - 1
At time of inspection on a active jobsite-16 story nb, it was observed that the means of egress and ingress on the roof were blocked by suported scaffold exp#1 and wooden ladder exp#4. this obstruction is
Mar 1, 2024 · Penalty $10,000
Resolve - Class - 2
At time of my inspection on a active jobsite of a 16 story nb,observed that housekeeping throughout the entire site were inadequate,mix material and debris creating a trip and fall hazard for workers and person
Mar 1, 2024 · Penalty $1,250
Resolve - Class - 2
At time of my inspection of a 16 story nb/active jobsite, i observed inadequate fire extinguishers (missing safety pins, old/damage, missing inspection tags and all missing monthly inspection) copmly with co
Mar 1, 2024
Resolve - Class - 2
At time of my inspection on a active jobsite of a 16 story nb,i observed missing floor numbers signs, exit signs ,no smoking signs. missing signs are detrimental to a safe working enviroment.provide signs, com
Mar 1, 2024
Resolve - Class - 2
At time of my inspection on a active jobsite of a 16 story nb, observed suported scaffold at exp#1,2,3,4. the scaffold had lose planks, lose nettings,not clean and maintain as per code.this creates a hazardous
Mar 1, 2024
Resolve - Class - 1
At time of my inspection on a active jobsite of a 16 story nb,observed that guardrails were missing or not build as per code-lose nettings ,holes gurdrail not secured throughout entire jobsite.this creates a ha
Mar 1, 2024 · Penalty $5,000
Resolve - Class - 2
Bc 3303.14 water conditions: during inspection of a16 story building i observed an accumulation of water in the elevator shaft; as per code, the gc shall take all necessary measures to prevent settlement water
Feb 6, 2024
Resolve - Class - 1
Inspection of a 16 story building, with supported scaffold around the perimeter i observed shoring post on several floors within the site; i requested to see the approved design drawings for the post but none
Feb 6, 2024 · Penalty $2,500
Resolve - Class - 1
Inspection of a 16 story building, i observed on the 10,6,and 4th floors all had missing guardrails at the balcony's that had missing and broken glass doors. the missing doors and guardrails allowed anyone to w
Feb 6, 2024 · Penalty $5,000
Resolve - Class - 1
Inspection of a 16 story building, i observed that there was broken glass on the 10,6,and 4th floors from the glass balcony doors that had broken and shattered onto the floor, but all the glass was not picked u
Feb 6, 2024 · Penalty $2,500
Resolve - Class - 1
Bc 3307.1 pedestrian protection: during inspection in regards to an incident were a pedestrian walked through an open gate in the hoist area and laid down claiming injury i observed that the gate was wide open
Jan 26, 2024 · Penalty $2,400
Resolve - Class - 1
At time of inspection at 16 story nb active site observed inadequate zero cable guardrails and vertical netting system fl (3-16) in unclosed perimeter. creating safety hazardous condition for workers. pswo iss
Nov 30, 2023 · Penalty $2,500
Resolve - Class - 2
At the time of inspection, observed unsecured reshoring posts near perimeters above 8th floor level. g.c failed to conform with 3305.3.6.1.2. no work allowed within 10 feet from open perimeter at all exposures
Oct 20, 2023
Resolve - Class - 2
At the time of inspection, observed installed horizontal netting on 8th floor level while stripping activity occurs on 11th floor level. g.c failed to comply with 3308.6. no stripping nor concrete operation all
Oct 20, 2023
Resolve - Class - 1
At inspection i observed used and box of shots (bullets) for the hilti shot gun to frame top and bottom track to the deck. i asked all of the framers approximately 8 workers if they had the training certificat
Oct 13, 2023 · Penalty $2,500
Resolve - Class - 1
At time of inspection of a building at the 13th story, i observed that the standpipe was not in a state of readiness. on the 8th floor the standpipe was not painted red, and the standpipes were missing caps. th
Oct 13, 2023 · Penalty $2,500
Resolve - Class - 2
At time of inspection of a proposed 16 story building, i observed at exposure #4 the debris netting provided to prevent debris from going over to the adjacent property garage area, had holes in the netting unde
Oct 13, 2023
Resolve - Class - 1
At time of inspection of a proposed 16 story building there was construction debris and inadequate egress throughout the upper floors there was also uncovered holes and unsecured unlabeled wood covering large h
Oct 13, 2023 · Penalty $2,500
Resolve - Class - 1
At time of inspection of a proposed 16 story building, at the 4 story, i observed that the sidewalk shed light were on and that there was lights on the inside of the site. review of dob records revealed that th
Aug 9, 2023 · Penalty $400
Resolve - Class - 2
During inspection of a proposed 16 story building at the 4 story i observed that there was a trailer positioned in the road way enclosed by barriers; when i reviewed the site safety plan, it did not indicate a
Aug 9, 2023
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection. at time of inspection observed construction fence in disrepair where a section approx: 8'x4' has detached & fallen into public sidewalk with
Dec 7, 2022 · Penalty $5,000
Active
Complaints
- Plumbing
Basin/sink
Sep 22, 2026 · Apt 6B
Open - Plumbing
Basin/sink
Sep 22, 2026 · Apt 6B
Open - Appliance
Refrigerator
Sep 22, 2026 · Apt 6B
Open - Plumbing
Bathtub/shower
Aug 17, 2026 · Apt 6B
Close - Plumbing
Basin/sink
Aug 17, 2026 · Apt 6B
Close - Door/window
Door
Aug 17, 2026 · Apt 6B
Close - Appliance
Refrigerator
Aug 1, 2026 · Apt 6B
Close - Electric
No lighting
Aug 1, 2026 · Apt 6B
Close - Plumbing
Basin/sink
Aug 1, 2026 · Apt 6B
Close - Water leak
Slow leak
Jul 4, 2026 · Apt 4D
Close
Show 7 more ↓
- Water leak
Heavy flow
Jun 3, 2026 · Apt 4D
Close - Electric
Outlet/switch
Jun 3, 2026 · Apt 4D
Close - Door/window
Door
Mar 10, 2026 · Apt 7A
Close - Flooring/stairs
Floor
Nov 18, 2025 · Apt 8D
Close - General
Ventilation system
Nov 18, 2025 · Apt 8D
Close - Door/window
Door
Nov 18, 2025 · Apt 8D
Close - Door/window
Window frame
Nov 18, 2025 · Apt 8D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2023
- Floors
- 16
- Residential units
- 52
- Building area
- 50,195 ft²
- Lot area
- 5,012 ft²
- Zoning
- C6-3
- Community board
- 412
- Council district
- 27
- Block / lot
- 10026 / 34
- Assessed value
- $3,829,950
- Landmark / historic district
- No
HPD registration #434542, last renewed Aug 26, 2025.
Questions about 95-25 Waltham Street
Who owns 95-25 Waltham Street?
The owner of record in NYC Department of City Planning PLUTO data is Amar Marketing Enterprise 2 LLC.
Does 95-25 Waltham Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 95-25 Waltham Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 95-25 Waltham Street built?
City records list 2023 as the year it was built.
How many apartments are in 95-25 Waltham Street?
It has 52 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.