95-30 Liverpool Street
Queens, NY 11435BBL 4-10008-0019Map
Owner of record: Eunice L Graham
95-30 Liverpool Street is a walk-up apartment building built in 1920 in Queens, 11435. It has 3 residential units across 2 floors. The owner of record is Eunice L Graham. HPD has recorded 49 housing violations here, most recently on June 16, 2024. 34 of the 49 most recent violations are still open.
- HPD violations
- 49
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 20
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 49
- BHazardous
Properly repair or replace the broken or defective mailboxes at vestibule at public hall, 1st story
Jun 16, 2024
Open — Nov sent out - ANon-hazardous
Replace with new the missing electrical outlet cover plate at all fixtures at all walls in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - ANon-hazardous
Replace with new the missing electrical outlet cover plates at east and west walls at vestibule at public hall, 1st story
Jun 16, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door at public hall, 1st story
Jun 16, 2024
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door lock at cellar at boiler room
Jun 16, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective drop ceiling in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at apartment door in the entrance located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper window sash at east 1 and east windows in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out
Show 39 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood sub floor in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles and grout at south and west walls in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 3 sqft at south wall in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the private hallway located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper window sash spring balance at east 1 and east 2 windows in the 1st room from east at north located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective drop ceiling in the 1st room from east at north located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east at north located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east at north located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood sub floor in the 3rd room from east located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 3rd room from east located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Refit upper window sash at south 1 window in the 3rd room from east located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Refit upper window sash at south 2 window in the 3rd room from east located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the kitchen located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 3 sqft at south wall in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east original violation 17052127 issued 16-jun-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 16, 2024 · Apt 2F
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Jun 16, 2024 · Apt 2F
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance door
Aug 1, 2022
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule door to 1 story public hall
Aug 1, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 15, 2021
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 31, 2007 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 31, 2007 · Apt 1
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 31, 2007 · Apt 1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin fleas in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 31, 2007 · Apt 1
Closed — Violation closed - BHazardous
Replace with new the missing south wall window panes at cellar
Jan 31, 2007
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) west wall in the 3rd kitchen from east located at apt 1, 1st story, 1st apartment from south at west
Jan 31, 2007 · Apt 1
Open — Nov sent out - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts incandscent or equivalent.
Aug 3, 1998
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors entrance 1 sty apt.
Apr 20, 1998
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections cellar thruout.
Apr 20, 1998
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors vestibule to 1 sty pub hall.
May 1, 1991
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of discarded door 2 sty pub hall.
May 1, 1991
Closed — Violation closed - BHazardous
Section 65 m/d law provide under completed permit, a proper enclosure for the central heating plant, cellar.
Oct 4, 1988
Open — Nov sent out - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration water closet & stall shower installed cellar center south.
Oct 4, 1988
Open — Nov sent out - BHazardous
D26-10.01 adm code properly repair the broken or defective mailboxes vestibule.
Oct 4, 1988
Open — Nov sent out - BHazardous
D26-34.01 adm code discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections cellar throughout.
Oct 4, 1988
Open — Nov sent out - BHazardous
Section 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition apt created cellar thruout.
Oct 4, 1988
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Non-hazardous
Work without a permit. noted: at cellar- erected partitions creating separate rooms, bathroom with toilet, tub/shower and water and drain lines for lavatory. also installed additional water and drain lines
Dec 3, 2004 · Penalty $500
Active - Hazardous
Failure to maintain exterior bldg wall.noted:at side of house strips of aluminum siding are unattached from facade and hanging hazardously from house.remedy:make safe immediately.make all necessary repairs
Mar 27, 2004 · Penalty $800
Active
Complaints
- General
Cooking gas
Jun 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 14, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jul 30, 2022 · Apt 2R
Close - Plumbing
Water supply
Jul 30, 2022 · Apt 2FLR
Close - Plumbing
Water supply
Jul 29, 2022 · Apt BLDG
Close - Heating
Heat related
Jan 24, 2007 · Apt 1
Close - Nonconst
Vermin
Jan 24, 2007 · Apt 1
Close - Nonconst
Vermin
Jan 24, 2007 · Apt 1
Close - Plumbing
Radiator
Jan 24, 2007 · Apt 1
Close - Heating
Heat related
Feb 11, 2006 · Apt BLDG
Close
Show 10 more ↓
- Heating
Heat-plant
Feb 11, 2006 · Apt BLDG
Close - Heating
Heat related
Feb 11, 2006 · Apt BLDG
Close - General
Windows
Feb 11, 2006 · Apt 1FL
Close - General
Doors
Feb 11, 2006 · Apt 1FL
Close - Plumbing
Shower-stall
Feb 11, 2006 · Apt 1FL
Close - Nonconst
Vermin
Feb 11, 2006 · Apt 1FL
Close - General
Windows
Feb 11, 2006 · Apt 1FL
Close - Nonconst
Vermin
Jul 2, 2005 · Apt 1
Close - Nonconst
Vermin
Jul 2, 2005 · Apt 1
Close - Heating
Heat related
Nov 26, 2004 · Apt 2FF
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1920
- Floors
- 2
- Residential units
- 3
- Building area
- 2,520 ft²
- Lot area
- 2,600 ft²
- Zoning
- R5
- Community board
- 412
- Council district
- 27
- Block / lot
- 10008 / 19
- Assessed value
- $53,340
- Landmark / historic district
- No
HPD registration #414510, last renewed Jun 29, 2026.
Questions about 95-30 Liverpool Street
Who owns 95-30 Liverpool Street?
The owner of record in NYC Department of City Planning PLUTO data is Eunice L Graham.
Does 95-30 Liverpool Street have violations?
Yes. NYC HPD has recorded 49 housing violations at this property.
Is 95-30 Liverpool Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 95-30 Liverpool Street built?
City records list 1920 as the year it was built.
How many apartments are in 95-30 Liverpool Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.